  • Future projects at the South Pole that require deep drilling associated with IceCube.
  • Executive Summary Using the 5MW Enhanced hot water drill (EHWD) IceCube has been successful in drilling up to 20 holes in ice to a depth of 2500m.
  • Scientists in the IceCube collaboration as well as scientists outside IceCube who work closely with IceCube scientists are currently exploring strategies to leverage on IceCube�s powerful detector infrastructure by augmenting it with additional instrumentation that would both enhance IceCube�s potential and go beyond it�s current science.
  • 2.
  • IceCube Construction and drilling Major construction of IceCube was completed on December 2010 when the last string ...
Allowed
A. Karle (et al)
Microsoft Word 2007 (.docx) - application/vnd.openxmlformats-officedocument.wordprocessingml.document
FutureProjectsAtPoleWithDrill2.docx
No
10000
12568121
No
Appears In: associated documents
Preferred Version: FutureProjectsAtPoleWithDrill2.docx