IceCubeUpgradeWinterHeatingRequirements_20201216.pdf
Handle: Document-89676
Owner: Feyzi, Farshid (User-1923, ffeyzi:LDAP)DS
Friday, October 15, 2021 02:02:05 PM CDT
Friday, October 15, 2021 02:02:05 PM CDT
Modified By:
Locked By:
  • IceCube Upgrade Winter r/MoniPowe toring Requirements
Rev 12.16.2020 Purpose: This document is to inform ASC of IceCube Upgrade’s (A‐334) requirements for heating and monitoring equipment during the South Pole winter.
  • Contents:
1.
  • Executive Summary
2.
  • Container Heating Requirements
3.
  • Hose Reel Heating Requirements
4.
  • Monitoring Requirements
5. Fuel Requirements 1. Executive Summary IceCube Upgrade requires the following for the duration of the South Pole winter: ‐ 39.6kW of 480V 3 phase power (at peak load) ‐ 10.5kW of 208V 3 phase power (at peak load) ‐ Remote monitoring via wireless or Eth...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
IceCubeUpgradeWinterHeatingRequirements_20201216.pdf
No
10000
588600
No
Appears In: Gen 1 Fuel Reference
Preferred Version: IceCubeUpgradeWinterHeatingRequirements_20201216.pdf