Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

1.2.9 Estimate Sheet ds.xlsx
Handle: Document-90656
Owner: Benson, Terry (User-242, terryb:LDAP)DS
Wednesday, June 29, 2022 09:21:52 AM CDT
Wednesday, June 29, 2022 09:21:52 AM CDT
Modified By:
Locked By:
  • Upgrade Cost Estimate
Name: 1.2.9.1.3.3 Off-Ice Install: Procure ESD Sensor Handling Equipment Parent WBS: 1.2.9 Installation off-ice MATERIALS ESTIMATE LABOR ESTIMATE TOTAL SCHEDULE INPUT Description of Scope: ESD Protection for Safe Sensor Handling Initials/Date: DT 3/9/2022 Quantities Basis of Estimate (Select One, See Table Below) HOURS SCHEDULE LOGIC WBS (if known) Project Year (0-10) Description QTY Spare Total Fabricate or Procure? Procurement Details Manufacturer, Model, P/N, Vendor Unit Price Total Expected Price C2 LOE Tasks C3 Advanced C4 Preliminary C5 Conceptual C6 Pre- Conceptual C7 Rough Estimate C8 Beyond SOTA Cost Estimating Technique (See Table Below) Ma...
Allowed
Microsoft Excel 2007 (.xlsx) - application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
1.2.9 Estimate Sheet ds.xlsx
No
10000
876095
No
Appears In: 1.2 Estimating Documents
Preferred Version: 1.2.9 Estimate Sheet ds.xlsx