1.2.2 Estimate Sheet ds.xlsx
Handle: Document-90605
Owner: Benson, Terry (User-242, terryb:LDAP)DS
Tuesday, June 28, 2022 10:57:25 PM CDT
Tuesday, June 28, 2022 10:57:25 PM CDT
Modified By:
Locked By:
  • Upgrade Cost Estimate
Name: 1.2.2 Thermal Plants Parent WBS: 1.2 Implementation MATERIALS ESTIMATE LABOR ESTIMATE TOTAL SCHEDULE INPUT Description of Scope: Initials/Date: Quantities Basis of Estimate (Select One, See Table Below) HOURS SCHEDULE LOGIC WBS (if known) Project Year (0-10) Description QTY Spare Total Fabricate or Procure? identify and procure $7,760 8 1.2.2.1.7 6 Develop HPU2 Integrate Plan X D 50 50 $5,750.00 expert opinion.
  • identify and procure $7,760 8
0 0 $0.00 $0 0 1.2.2.2 Pre-Heat System 0 0 $0.00 $0 0 1.2.2.2.4 6 Procure and Upgrade Control Boxes (PY6) 0 4000 X D Updated displays, connectors.
  • Roughly 20hr engr + 20hr tech per box $19,360 21
1.2.2.2.5 ...
Allowed
Microsoft Excel 2007 (.xlsx) - application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
1.2.2 Estimate Sheet ds.xlsx
No
10000
217346
No
Appears In: 1.2 Estimating Documents
Preferred Version: 1.2.2 Estimate Sheet ds.xlsx