  • How to relate the IceCube Upgrade Basis of Estimates to the Cost Workbook
The basis of estimates are all of the same template.
  • You can find
these rates in the respective columns in the cost workbook.
  • Below is a snapshot of the cost workbook and how to navigate it.
  • Full WBS.
  • This WBS number will
also appear in the relevant BOE.
  • Column AV is the indirect amount
(=Column AU x Column N if not CapEx). Column AW is the total direct + indirect of PY5.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
NavigatingICUCosts.pdf
No
10000
230073
No
Appears In: Costing Methodology and Assumptions
Preferred Version: NavigatingICUCosts.pdf