1 Basis of Estimate 1.
  • WBS ID
1.4.2 $154,107 total for this WBS 2.
  • WBS Name
Surface Cables 3.
  • Estimated by Tyce DeYoung (Michigan State University)
4.
  • WBS Dictionary Description
This element includes design, procurement, and quality assurance of the physical cables running along the surface from the IceCube Laboratory (ICL) building to the Upgrade strings.
  • 1.4.2.2 Surface Junction Boxes
Labor, material, and equipment required to design and construct or purchase the junction boxes housing the connections between t...