1 Basis of Estimate 1.
  • WBS ID
1.3.3 $150,870.05 total burdened cost for this WBS 2.
  • WBS Name PDOM
3.
  • Estimated by Perry Sandstrom (WIPAC)
4.
  • WBS Dictionary Description
This element is responsible for upgrading 20 spare IceCube Gen1 DOMs with PDOM readout electronics, HV systems, calibration devices, and penetrators.
  • These are summarized in the Project’s Key Assumptions document (1). The
techniques are: A=Analogy; C=Engineering build-up; D=Expert opinion; E=Extrapolation from actuals; F=Parametric; L=Learning Curves. Last revision: 6 Ma...