1 Basis of Estimate 1.
  • WBS ID
1.2.6 $57,615 total cost for this WBS 2.
  • WBS Name Water Handling Systems - Off-ice
3.
  • Estimated by Terry Benson (University of Wisconsin)
4.
  • WBS Dictionary Description
Includes the design, procurement, resurrection, construction, integration, and testing of subsystems associated with water storage, transfer, and makeup: Water tanks, High Pressure Pump system, and new water filtration and degassing system, all pumps including downhole return pump, all interconnect hoses and plumbing, and the ARA H...