1 Basis of Estimate 1.
  • WBS ID
1.2.3 $128,644 total cost for this WBS 2.
  • WBS Name Tower Operations Site (TOS) - Off-ice
3.
  • Estimated by Terry Benson (University of Wisconsin)
4.
  • WBS Dictionary Description
Includes the design, procurement, resurrection, construction, integration, and testing of subsystems located at the borehole: Tower Operations Structure, Drill Tower, Drillheads and controls, Main Drill Cable Reel, Main Drill Hose Reel, Main Drill Hose, Return Water Hose Reel, Return Water Cable Reel, and downhole drill cabl...