Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

7624_0008_RevB.pdf
Handle: Document-89689
Owner: Feyzi, Farshid (User-1923, ffeyzi:LDAP)DS
Friday, October 15, 2021 03:23:10 PM CDT
Friday, October 15, 2021 03:23:10 PM CDT
Modified By:
Locked By:
  • Fuel Supply
Tank 1 5k gal.
  • Fuel Supply
Tank 2 5k gal.
  • Main Heat Plant
Main Heat Plant Main Heat Plant Main Heat Plant HPP RWS PDM GEN-1 GEN-2 TANK-2 TANK-1 PHS SEW MECC POLAR HAVEN GLYCOL TANK GRAVITY TANK MILVAN E MILVAN M OML GEN-3 DCC 87 88 89 90 91 92 93 SES GPR survey boundary A B C D G F E 10 m K J I H X 30.643m 27.589m 23.772m 22.930m 42.085m 40.999m 39.424m 393.8in [10.00m] 120.4in [3.06m] 196.9in [5.00m] 196.9in [5.00m] 393.8in [10.00...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
7624_0008_RevB.pdf
No
10000
2649413
No
Appears In: Upgrade Surface Plans
Preferred Version: 7624_0008_RevB.pdf