Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

Population planning.pdf
Handle: Document-89688
Owner: Feyzi, Farshid (User-1923, ffeyzi:LDAP)DS
Friday, October 15, 2021 03:22:23 PM CDT
Friday, October 15, 2021 03:22:23 PM CDT
Modified By:
Locked By:
  • IceCube Upgrade Population Planning
A comprehensive set of tasks and the projected time for each to successfully complete the IceCube Upgrade is detailed on the project schedule.
  • Some seasons saw well
over 300 missions to move needed construction materials.
  • During this airlift gap, no C-17 missions are flown.
  • Aside from overflow housing (18
beds), all berthing at South Pole is located within the elevated station which has a design capacity of 150.
  • Billets may be split
between two or even three people.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
Population planning.pdf
No
10000
136992
No
Appears In: Population
Preferred Version: Population planning.pdf