DocuShare is now read-only. Use Google Drive.
The server is currently operating in read-only mode to allow routine maintenance operations to be performed.
Properties cannot be edited at this time.
IceCubeUpgradeWinterHeatingRequirements_20201216.pdf | |
Handle: | v_Document-89676 |
Owner: | Feyzi, Farshid (User-1923, ffeyzi:LDAP)DS |
Friday, October 15, 2021 02:02:05 PM CDT | |
Friday, October 15, 2021 02:02:05 PM CDT | |
Modified By: | |
- IceCube Upgrade Winter r/MoniPowe toring Requirements Rev 12.16.2020 Purpose: This document is to inform ASC of IceCube Upgrade’s (A‐334) requirements for heating and monitoring equipment during the South Pole winter. - Contents: 1. - Executive Summary 2. - Container Heating Requirements 3. - Hose Reel Heating Requirements 4. - Monitoring Requirements 5. Fuel Requirements 1. Executive Summary IceCube Upgrade requires the following for the duration of the South Pole winter: ‐ 39.6kW of 480V 3 phase power (at peak load) ‐ 10.5kW of 208V 3 phase power (at peak load) ‐ Remote monitoring via wireless or Eth... | |
1 | |
Appears In: | IceCubeUpgradeWinterHeatingRequirements_20201216.pdf |
DocuShare is now read-only. Use Google Drive.