Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

BOE-1-2-5.pdf
Handle: Version-105548
Owner: O'Dell, Vivian (User-2054, vodell:LDAP)DS
Tuesday, May 10, 2022 01:42:14 PM CDT
Wednesday, May 25, 2022 02:40:51 PM CDT
Modified By:
- Last revision: 10 May 2022 1 Basis of Estimate 1. - WBS ID 1.2.5 Total cost for this WBS: $64,401 2. - WBS Name Power Generation 3. - Estimated by Ian McEwen & Barb Birrittella (University of Wisconsin) 4. - WBS Dictionary Description Includes evaluation and repairs, logistics and sub-contract arrangements for the overhaul and repairs of the IceCube Gen1 Generators, Power Distribution Module, and Electrical Grid. - The meanings of the contingency codes and the percentage of contingency in each case are described in the Key Assumptions document (1). 6. Scope 1.2.5 ...
1