1 Basis of Estimate 1.
  • WBS ID
1.2.5 Total cost for this WBS: $64,401 2.
  • WBS Name Power Generation
3.
  • Estimated by Ian McEwen & Barb Birrittella (University of Wisconsin)
4.
  • WBS Dictionary Description
Includes evaluation and repairs, logistics and sub-contract arrangements for the overhaul and repairs of the IceCube Gen1 Generators, Power Distribution Module, and Electrical Grid.
  • The meanings of the contingency codes and the percentage of contingency in each case are
described in the Key Assumptions document (1). 6. Scope 1.2.5...