- IceCube Upgrade Rebaseline Review April 26-28, 2022 Tyce DeYoung WBS 1.4 Comms/Power/Timing (CPT) Systems Overview of Work to Go • Essentially complete – will be finished in PY4: • Penetrators, surface cable assemblies, cable load emulators, NTS • Mostly complete, awaiting inputs to final design: • Surface junction boxes (need main cable design to finalize grounding) • ICL patch cabling (need final ICL electronics layout to finalize lengths) ...