Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

B2_6_WBS_1_4_CPT_DeYoung.pdf
Handle: Document-90360
Owner: O'Dell, Vivian (User-2054, vodell:LDAP)DS
Tuesday, April 19, 2022 08:22:59 PM CDT
Sunday, April 24, 2022 09:13:28 AM CDT
Modified By: Madsen, Jim (User-61, madsen:LDAP)DS
Locked By:
  • IceCube Upgrade Rebaseline Review
April 26-28, 2022 Tyce DeYoung WBS 1.4 Comms/Power/Timing (CPT) Systems Overview of Work to Go • Essentially complete (finished in PY4): • Penetrators • Surface cable assemblies • Cable load emulators • Northern Test System • Mostly complete (need inputs to final design): • Surface junction boxes • ICL patch cabling 2 mini_Fieldhub & ICMs, Status, January 2020, Kalle Sulanke, DESY 2 AC/DC 5V AC/DC 48V SOC ICM_1 ICM_0 90-264 VAC 96V quad timing extern monitoring ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
B2_6_WBS_1_4_CPT_DeYoung.pdf
No
10000
2867434
No
Appears In: Breakout_Track_2
Preferred Version: B2_6_WBS_1_4_CPT_DeYoung.pdf