Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

1.2.6 Estimate Sheet ds.xlsx
Handle: Document-90644
Owner: Benson, Terry (User-242, terryb:LDAP)DS
Wednesday, June 29, 2022 12:12:32 AM CDT
Wednesday, June 29, 2022 12:16:06 AM CDT
Modified By: Benson, Terry (User-242, terryb:LDAP)DS
Locked By:
  • Upgrade Cost Estimate
Name: 1.2.6 Water Handling Parent WBS: 1.2 Implementation MATERIALS ESTIMATE LABOR ESTIMATE TOTAL SCHEDULE INPUT Description of Scope: Initials/Date: Quantities Basis of Estimate (Select One, See Table Below) HOURS SCHEDULE LOGIC WBS (if known) Project Year (0-10) Description QTY Spare Total Fabricate or Procure? "March" or "After Microturbine running", etc) Duration (Weeks) Predecessors Successors Milestone % of total orig mat'l orig labor orig tot delta 9.77E+003 1.2.6.1 Water Tanks 0 0 $0.00 $0 0 1.2.6.1.3 6 Procure Repair Parts, Replacements (PY6) 0 $ 5,000.00 X D expert opinion.
  • after FS1 assessment.
  • HPP, VT, and submersible pump parts, return ...
Allowed
Microsoft Excel 2007 (.xlsx) - application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
1.2.6 Water Handling ds.xlsx
No
10000
220718
No
Appears In: 1.2 Estimating Documents
Preferred Version: 1.2.6 Estimate Sheet ds.xlsx