1 Basis of Estimate 1.
  • WBS ID
1.4.5 $0 total cost for this WBS 2.
  • WBS Name
Northern Test System 3.
  • Estimated by Tyce DeYoung (Michigan State University)
4.
  • WBS Dictionary Description
This element includes design, construction and maintenance of a string-scale test facility in the Northern Hemisphere suitable for testing of DAQ software and firmware.
  • The meanings of the contingency codes and the percentage of contingency in each case are
described in the Key Assumptions document (IceCube Upgrade Project). 6. Scope T...