Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

BOE-1-2-10.pdf
Handle: Document-90454
Owner: O'Dell, Vivian (User-2054, vodell:LDAP)DS
Tuesday, May 10, 2022 01:43:26 PM CDT
Tuesday, May 10, 2022 01:43:26 PM CDT
Modified By:
Locked By:
  • Last revision: 10 May 2022
1 Basis of Estimate 1.
  • WBS ID
1.2.10 $98,922 total cost for this WBS 2.
  • WBS Name
Installation Field Seasons 3.
  • Estimated by Delia Tosi (University of Wisconsin)
4.
  • WBS Dictionary Description
The Installation Field Season WBS 1.2.10 includes detailed activities list and on-site management of polar field season work required for installation; on-ice installation activities, including pre-installation activities and installation proper activities coordinated with deep drilling; labor, travel, M&S for installation lead; all the r...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
BOE-1-2-10.pdf
No
10000
469620
No
Appears In: WBS 1.2
Preferred Version: BOE-1-2-10.pdf