Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

BOE-1-2-7.pdf
Handle: Document-90451
Owner: O'Dell, Vivian (User-2054, vodell:LDAP)DS
Tuesday, May 10, 2022 01:42:44 PM CDT
Wednesday, May 25, 2022 02:41:27 PM CDT
Modified By: O'Dell, Vivian (User-2054, vodell:LDAP)DS
Locked By:
  • Last revision: 10 May 2022
1 Basis of Estimate 1.
  • WBS ID
1.2.7 $163,036 total cost for this WBS 2.
  • WBS Name
Support Equipment - Off-ice 3.
  • Estimated by Terry Benson (University of Wisconsin)
4.
  • WBS Dictionary Description
Includes the design, procurement, resurrection, construction, integration, and testing of other drill support systems and equipment: Mobile Expandable Container Configuration (MECC), Mechanical Shop, Electrical Shop, Spares and equipment milvans, Independent Firn Drill (IFD), and special handling equipment.
  • The meanings of the conti...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
BOE-1-2-7.pdf
No
10000
468684
No
Appears In: WBS 1.2
Preferred Version: BOE-1-2-7.pdf