1 Basis of Estimate 1.
  • WBS ID
1.2.2 2.
  • WBS Name Thermal Plant – Off-Ice
3.
  • Estimated by Terry Benson (University of Wisconsin)
4.
  • WBS Dictionary Description
Includes the design, procurement, resurrection, construction, integration, and testing of subsystems associated with the drill system’s hot water thermal plant: Preheat System, Main Heating Plants, a new Seasonal Equipment Site fuel day tank and fuel distribution system.
  • These reflect the estimated uncertainty in the
estimate. Review, specify/procure fuel delivery systems throughout EHWD $95,123...