Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

BOE-1-2-1.pdf
Handle: Document-90445
Owner: O'Dell, Vivian (User-2054, vodell:LDAP)DS
Tuesday, May 10, 2022 01:41:13 PM CDT
Wednesday, May 25, 2022 02:39:21 PM CDT
Modified By: O'Dell, Vivian (User-2054, vodell:LDAP)DS
Locked By:
  • Last revision: 10 May 2022
1 Basis of Estimate 1.
  • WBS ID
1.2.1 $2,381,686 total cost for this WBS 2.
  • WBS Name
Implementation Management & Systems Engineering 3.
  • Estimated by Terry Benson, Delia Tosi, & Ian McEwen (University of Wisconsin)
4.
  • WBS Dictionary Description
This WBS includes functional areas that directly support the seven string installation efforts at the South Pole.
  • The meanings of the contingency codes and the percentage of contingency in each case are
described in the Key Assumptions document (1). 6. Scope The scope of this BOE cov...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
BOE-1-2-1.pdf
No
10000
953433
No
Appears In: WBS 1.2
Preferred Version: BOE-1-2-1.pdf