ICU Re-baselining Review Panel Close Out Report 28 April 2022 The panel has high confidence that the scope of the project can be delivered, provided the manageable concerns reflected in this summary are addressed in a timely fashion.
  • However, the impact of possible loss of in-kind labor contributed by key personnel (e.g.
  • mainboard electrical engineers, software simulation experts, etc.) should be covered by
appropriate risk register entries.
  • COSTS
● High level drill-down was performed on BOEs and focused on PMO BOE.
  • ● Field Project drilling staffing (28 field staff, with 14 experienced) may be particularly challenging
in the current labor environment and represents a ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
ICU Rebaseline Review Close Out .pdf
No
10000
63295
No
Appears In: 1. Rebaseline Review Meeting Organization
Preferred Version: ICU Rebaseline Review Close Out .pdf