  • mDOM DAQ & ICM Preliminary Design Review
26-27 August 2019, DESY Zeuthen, Germany Scope of review Reviewers were charged with evaluating the mDOM DAQ Electronics (WBS 1.3.1.1), high voltage subsystem (WBS 1.3.1.3), and Ice Communications Module (ICM) (WBS 1.3.4) at the level of a preliminary design.
  • High-level recommendations
1.
  • Produce a list of milestones for the near-term mDOM & ICM design development.
  • 5.
  • Make a plan for which pieces of the firmware are required for various external activities
(such as D-Egg design verification) and at what times.
  • A
testboard has been employed for studying the AFE and digitizer chain. It is recommended that a plan for future deve...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
mDOM DAQ & ICM preliminary design review.pdf
No
10000
98636
No
Appears In: 4. Rebaseline Review Homework Q&A
Preferred Version: mDOM DAQ & ICM preliminary design review