Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

P09_Drilling_Benson.pdf
Handle: Document-90382
Owner: Madsen, Jim (User-61, madsen:LDAP)DS
Friday, April 22, 2022 03:06:30 PM CDT
Friday, April 22, 2022 03:06:30 PM CDT
Modified By:
Locked By:
  • IceCube Upgrade NSF Re-Baseline Review
April 26-28, 2022 Terry Benson 1.2 Implementation – Drilling Plenary Brief Bio Terry Benson – UW Physical Sciences Lab (PSL) • PSL Instrumentation Manager, mechanical engineer • IceCube Upgrade Drill Systems Engineer • Nearly 20 years hot water drill experience – joined IceCube EHWD team in 2003 • Drilling shift lead in the field • 9 trips to South Pole for hot water drilling projects PSL Team: EHWD experience from IceCube Gen1 has become concentrated at PSL, and joined by a younger generation of skilled,...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
P09_Drilling_Benson.pdf
No
10000
1434082
No
Appears In: 2. Rebaseline Review Presentations
Preferred Version: P09_Drilling_Benson.pdf