Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

B2_1_DrillTechnical_Benson.pdf
Handle: Document-90355
Owner: O'Dell, Vivian (User-2054, vodell:LDAP)DS
Tuesday, April 19, 2022 08:21:52 PM CDT
Tuesday, April 19, 2022 08:21:52 PM CDT
Modified By:
Locked By:
  • IceCube Upgrade NSF Re-Baseline Review
April 26-28, 2022 Terry Benson Drill Breakout - Technical Status Enhanced Hot Water Drill (EHWD) IceCube, South Pole 2004-2022 IceCube Upgrade Rebase Review - Drill Breakout - T.
  • Benson
2 Seasonal Equipment Site (SES), aka Drill Camp Enhanced Hot Water Drill (EHWD) IceCube, South Pole 2004-2022 IceCube Upgrade Rebase Review - Drill Breakout - T.
  • Benson
3 Tower Operations Site (TOS) ICU Drill Schematic IceCube Upgrade Rebase Review - Drill Breakout - T.
  • Benson
4 Water Tanks (WT1 & WT2) IceCube Upgrade Rebase Review - Drill Breakout - T.
  • Benson ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
B2_1_DrillTechnical_Benson.pdf
No
10000
3500919
No
Appears In: Breakout_Track_2
Preferred Version: B2_1_DrillTechnical_Benson.pdf