IceCube Neutrino Observatory Revision History Rev Date Author(s) Comments
05/2021 JM, KH, AK Initial DRAFT.
Organizations involved in managing the transition activities: WIPAC, NSF, Antarctic Support
Contractor (ASC).
Estimated cost of transition, which includes labor and material cost, as well as the estimated
contingency based on the uncertainties and risks: By far the major cost of facility divestment will be decommissioning of the physical detector, computing, and infrastructure assets at South Pole.
No pension and health care responsibilities will continue after the divestment.