| 05. Comms, Power, Timing_NSF_Mar20.pdf |
| |
| |
| |
Handle:
|
Document-87874
|
Owner:
|
Madsen, Jim (User-61, madsen:LDAP)DS
|
| Friday, March 13, 2020 03:57:48 PM CDT |
| Friday, March 13, 2020 03:57:48 PM CDT |
Modified By:
|
|
| |
Locked By:
|
|
| • • • • • • • • • • • • • • • • • • • • • • • • Today 2018 2019 2020 2021 2022 2023 Downhole Cable Assemblies Final Design Phase Main Cable Production Breakout Cable Assemblies Penetrator Cable Assembly Surface Cable Assemblies Surface Junction Boxes FieldHub Design FieldHub Surface Electronics Control, Readout and Timing Firmware and Software CPT Central Infrastructure Northern Test System NTS Opera... |