Skip to Contents

View Properties

03. Drill_NSF_Mar20.pdf
Handle: Document-87872
Owner: Madsen, Jim (User-61, madsen:LDAP)DS
Friday, March 13, 2020 03:57:19 PM CDT
Friday, March 13, 2020 03:57:19 PM CDT
Modified By:
Locked By:
  • IceCube Upgrade
Drilling & Installation • Drilling & Installation – Terry Benson Drilling & Installation TBD, Manager Terry Benson, Systems Engineer Bob Paulos PSL Director Paul Wisneiwski Engineer, Cont.
  • Sys
Barb Birrittella Engineer, ME Dar Gibson Lead Jake Nesbit Engineer, ME Darrell Hamilton Sr.
  • Technician
Jonas Kalin Lead Dennis Duling Lead Professional Drill Team (27)
  • PSL Engineers
  • Seasonal Drillers
  • Contributed Drillers ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
03. Drill_NSF_Mar20.pdf
No
10000
7065190
No
Appears In: NSF Site Visit Mar2020 Upgrade Talks
Preferred Version: 03. Drill_NSF_Mar20.pdf