Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

Gaisser-LeptonPhoton4.pptx
power=point version
Handle: Document-58710
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, August 25, 2011 10:16:23 PM CDT
Thursday, August 25, 2011 10:16:23 PM CDT
Modified By:
Locked By:
  • IceCube drilling & deployment Mumbai, 8/26/2011 Lepton-Photon 2011 Tom Gaisser 6 LED Flasher board HV board Main board for digitizing & time stamping Digital Optical Module Timing accurate to <3 ns over full array including IceTop Mumbai, 8/26/2011 Lepton-Photon 2011 Tom Gaisser 7 High-energy events in IceCube ~100 TeV nm induced muon Color code: red/orange = earlier; magenta/blue = later Atmospheric muon with 80 TeV burst downward upward Mumbai, 8/26/2011 Lepton-Photon 2011 Tom Gaisser 8 High energy ...
  • No astrophysical neutrinos seen yet Result of fit: Mumbai, 8/26/2011 Lepton-Photon 2011 Tom Gaisser 25 IceCube nm: measurements & limits IceCube 40 arXiv:1104.5187 Waxman -Bahcall Limit ...
Allowed
Microsoft PowerPoint 2007 (.pptx) - application/vnd.openxmlformats-officedocument.presentationml.presentation
Gaisser-LeptonPhoton4.pptx
No
10000
12412641
No
Appears In: Lepton-Photon Conference
Preferred Version: Gaisser-LeptonPhoton4.pptx