  • Future projects at the South Pole that require deep drilling associated with IceCube.
  • Executive Summary Using the 5MW Enhanced hot water drill (EHWD) IceCube has been successful in drilling up to 20 holes in ice to a depth of 2500m.
  • Scientists in the IceCube collaboration as well as scientists outside IceCube who work closely with IceCube scientists are currently exploring strategies to leverage on IceCube�s powerful detector infrastructure by augmenting it with additional instrumentation that would both enhance IceCube�s potential and go beyond it�s current science.
  • 2.
  • IceCube Construction and drilling Major construction of IceCube was completed on December 2010 when the last string ...
Allowed
A. Karle (et al)
Adobe Portable Document Format (.pdf) - application/pdf
FutureProjectsAtPoleWithDrill2.pdf
No
10000
17043439
No
Appears In: associated documents
Preferred Version: FutureProjectsAtPoleWithDrill1r.pdf