Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

High Energy Engineering WG summary.ppt
Submitted by Jim Baccus - Details engineering challenges for implementing a High Energy Extension for IceCube
Handle: Document-49928
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, May 20, 2009 04:17:29 PM CDT
Thursday, March 18, 2010 04:23:44 PM CDT
Modified By:
Locked By:
  • 6 IceCube Spring Collaboration Meeting High Energy Working Group April 29, 2009 HE86 Assuming HE86 is approved, the following tasks need to be completed in order to make this happen: Successful testing of DOM / DOR communications extended length (to 3850 m) Surface Cable extension cable order, mfg, and delivery to the pole Minor changes to drill (discussed in later slides) Verification of longer drill reach capabilities Surface Cable Extensions: These orders would look exactly like Surface Cable orders ...
  • 10 IceCube Spring Collaboration Meeting High Energy Working Group April 29, 2009 Communications Test Plan The greatest risk to be mitigated is communications with DOMs over longer cable...
Allowed
Microsoft Power Point (.ppt, .pot) - application/vnd.ms-powerpoint
090429 HE Collab Mtg.ppt
No
10000
1766400
No
Appears In: 03. Future Plans
Preferred Version: High Energy Engineering WG summary.ppt