Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

01. Construction Endgame Plan and M&O Program Overview
Handle: Document-49592
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, May 12, 2009 03:41:48 PM CDT
Wednesday, May 20, 2009 07:32:09 AM CDT
Modified By:
Locked By:
  • Reduce uncertainty in seasonal installation plans with 20 strings/season the optimum stretch goal Fuel Savings 2008/09 Season 2009/10 Season Support Plan Actual Support Plan Number of Holes 16 19 20 Deep Drilling, per-hole 6,000 gal 4,810 gal 5,500 gal Base 18,000 gal 20,830 gal 20,000 gal Seasonal Total 114,000 gal 112,220 gal 130,000 gal Significant improvement in drilling efficiency resulted in considerable fuel savings and reduced future support requirements.
  • Initial M&O support enables early physics and a better understanding of what is needed to support efficient postconstruction operations �? Initial success due to M&O Core support, research grant support, UW subsidies, and the ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
Yeck_SAC_v1.pdf
No
10000
5994050
No
Appears In: 00. Overview
Preferred Version: Construction Endgame Plan and M&O Program Overview