DocuShare is now read-only. Use Google Drive.
The server is currently operating in read-only mode to allow routine maintenance operations to be performed.
Properties cannot be edited at this time.
IceCube M&O Plan PY4.pdf | |
Handle: | v_Document-93067 |
Owner: | Kelley, John (User-174, jkelley:LDAP)DS |
Friday, April 5, 2024 08:56:54 AM CDT | |
Friday, April 5, 2024 08:56:54 AM CDT | |
Modified By: | |
- IceCube Management and Operations Plan PY4: April 1, 2024 – March 31, 2025 IceCube M&O Plan PY4 Revision Date Comments 1.0 Jul 2020 Submitted with M&O proposal. - ICNO instruments a cubic kilometer of the Antarctic glacier and square kilometer on the surface above at the geographic South Pole as a neutrino and cosmic-ray detector and is shown in Figure 1. - Composed of over 5000 Digital Optical Modules (DOMs), the detector, including the data acquisition, control, data handling and data filtering systems, operates continuously with high duty factor (>99%). - In more than a decade of operation, IceCube data have been used in numerous discoveries in astrophys... | |
1 | |
Appears In: | IceCube M&O Plan PY4.pdf |
DocuShare is now read-only. Use Google Drive.