DocuShare is now read-only. Use Google Drive.
The server is currently operating in read-only mode to allow routine maintenance operations to be performed.
Properties cannot be edited at this time.
BOE-1-4-3.pdf | |
Handle: | v_Document-90461 |
Owner: | O'Dell, Vivian (User-2054, vodell:LDAP)DS |
Tuesday, May 10, 2022 02:03:43 PM CDT | |
Tuesday, May 10, 2022 02:03:43 PM CDT | |
Modified By: | |
- Last revision: 10 May 2022 1 Basis of Estimate 1. - WBS ID 1.4.3 $0 total cost for this WBS 2. - WBS Name FieldHub 3. - Estimated by Tyce DeYoung (Michigan State University) 4. - WBS Dictionary Description This element includes design, production and testing of the FieldHubs, which will control, read out, and supply power and timing signals to the instrumentation and calibration devices connected to the downhole cables. - These reflect the estimated uncertainty in the estimate. The FieldHubs and related labor are an in-kind contribution from DESY and ... | |
1 | |
Appears In: | BOE-1-4-3.pdf |
DocuShare is now read-only. Use Google Drive.