DocuShare is now read-only. Use Google Drive.
The server is currently operating in read-only mode to allow routine maintenance operations to be performed.
Properties cannot be edited at this time.
P09_Drilling_Benson.pdf | |
Handle: | v_Document-90382 |
Owner: | Madsen, Jim (User-61, madsen:LDAP)DS |
Friday, April 22, 2022 03:06:30 PM CDT | |
Friday, April 22, 2022 03:06:30 PM CDT | |
Modified By: | |
- IceCube Upgrade NSF Re-Baseline Review April 26-28, 2022 Terry Benson 1.2 Implementation – Drilling Plenary Brief Bio Terry Benson – UW Physical Sciences Lab (PSL) • PSL Instrumentation Manager, mechanical engineer • IceCube Upgrade Drill Systems Engineer • Nearly 20 years hot water drill experience – joined IceCube EHWD team in 2003 • Drilling shift lead in the field • 9 trips to South Pole for hot water drilling projects PSL Team: EHWD experience from IceCube Gen1 has become concentrated at PSL, and joined by a younger generation of skilled,... | |
1 | |
Appears In: | P09_Drilling_Benson.pdf |
DocuShare is now read-only. Use Google Drive.