DocuShare is now read-only. Use Google Drive.
The server is currently operating in read-only mode to allow routine maintenance operations to be performed.
Properties cannot be edited at this time.
05.Drilling_Overview_Cargo_Benson.pdf | |
Handle: | v_Document-89797 |
Owner: | Madsen, Jim (User-61, madsen:LDAP)DS |
Tuesday, November 2, 2021 06:49:41 PM CDT | |
Tuesday, November 2, 2021 06:49:41 PM CDT | |
Modified By: | |
- IceCube Upgrade Drill Overview November 3, 2021 Terry Benson, Drill Systems Engineer Enhanced Hot Water Drill (EHWD) IceCube, South Pole 2004-2011 Seasonal Equipment Site (SES), aka Drill Camp 11/3/2021 IceCube Upgrade Drill Overview - T. - Benson 2 Tower Operations Site (TOS) Enhanced Hot Water Drill (EHWD) IceCube, South Pole 2004-2011 11/3/2021 IceCube Upgrade Drill Overview - T. - Benson 3 Enhanced Hot Water Drill (EHWD) IceCube, South Pole 2004-2011 REQUIREMENTS • 86 ... | |
1 | |
Appears In: | 05.Drilling_Overview_Cargo_Benson.pdf |
DocuShare is now read-only. Use Google Drive.