Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

IceCube Upgrade Population.pdf
Handle: v_Document-89758
Owner: Tosi, Delia (User-511, detosi:LDAP)DS
Tuesday, October 19, 2021 07:44:42 PM CDT
Tuesday, October 19, 2021 07:44:42 PM CDT
Modified By:
- IceCube Upgrade Logistics: Population 1 • Season 1: • Outfitting of subsystems • Subsystem-level integration and testing • Seasonal Equipment Site (SES) setup • Season 2: • Full drill system integration and testing • Full power wet test • Firn drilling • Surface cable and Surface Junction Boxes Installation • Season 3: • Deep Drilling • Installation • Mothball and Retrograde Field Seasons 10/14/2021 IceCube Upgrade Logistics: Population ...
1
Appears In: IceCube Upgrade Population.pdf