DocuShare is now read-only. Use Google Drive.
The server is currently operating in read-only mode to allow routine maintenance operations to be performed.
Properties cannot be edited at this time.
BOE-1-4-2.pdf | |
Handle: | Version-105558 |
Owner: | O'Dell, Vivian (User-2054, vodell:LDAP)DS |
Tuesday, May 10, 2022 02:03:27 PM CDT | |
Wednesday, May 25, 2022 02:48:11 PM CDT | |
Modified By: | |
- Last revision: 10 May 2022 1 Basis of Estimate 1. - WBS ID 1.4.2 $ $154,107 total for this WBS 2. - WBS Name Surface Cables 3. - Estimated by Tyce DeYoung (Michigan State University) 4. - WBS Dictionary Description This element includes design, procurement, and quality assurance of the physical cables running along the surface from the IceCube Laboratory (ICL) building to the Upgrade strings. - 1.4.2.2 Surface Junction Boxes Labor, material, and equipment required to design and construct or purchase the junction boxes housing the connections between... | |
1 | |
Appears In: | BOE-1-4-2.pdf |
DocuShare is now read-only. Use Google Drive.