- Last revision: 10 May 2022 1 Basis of Estimate 1. - WBS ID 1.2.6 $57,615 total cost for this WBS 2. - WBS Name Water Handling Systems - Off-ice 3. - Estimated by Terry Benson (University of Wisconsin) 4. - WBS Dictionary Description Includes the design, procurement, resurrection, construction, integration, and testing of subsystems associated with water storage, transfer, and makeup: Water tanks, High Pressure Pump system, and new water filtration and degassing system, all pumps including downhole return pump, all interconnect hoses and plumbing, and the ARA H...