DocuShare is now read-only. Use Google Drive.
The server is currently operating in read-only mode to allow routine maintenance operations to be performed.
Properties cannot be edited at this time.
BOE-1-2-6.pdf | |
Handle: | Version-105550 |
Owner: | O'Dell, Vivian (User-2054, vodell:LDAP)DS |
Tuesday, May 10, 2022 01:42:29 PM CDT | |
Wednesday, May 25, 2022 02:41:09 PM CDT | |
Modified By: | |
- Last revision: 10 May 2022 1 Basis of Estimate 1. - WBS ID 1.2.6 $57,615 total cost for this WBS 2. - WBS Name Water Handling Systems - Off-ice 3. - Estimated by Terry Benson (University of Wisconsin) 4. - WBS Dictionary Description Includes the design, procurement, resurrection, construction, integration, and testing of subsystems associated with water storage, transfer, and makeup: Water tanks, High Pressure Pump system, and new water filtration and degassing system, all pumps including downhole return pump, all interconnect hoses and plumbing, and the ARA H... | |
1 | |
Appears In: | BOE-1-2-6.pdf |
DocuShare is now read-only. Use Google Drive.