DocuShare is now read-only. Use Google Drive.
The server is currently operating in read-only mode to allow routine maintenance operations to be performed.
Properties cannot be edited at this time.
BOE-1-2-3.pdf | |
Handle: | Version-105544 |
Owner: | O'Dell, Vivian (User-2054, vodell:LDAP)DS |
Tuesday, May 10, 2022 01:41:46 PM CDT | |
Wednesday, May 25, 2022 02:40:05 PM CDT | |
Modified By: | |
- Last revision: 10 May 2022 1 Basis of Estimate 1. - WBS ID 1.2.3 $128,644 total cost for this WBS 2. - WBS Name Tower Operations Site (TOS) - Off-ice 3. - Estimated by Terry Benson (University of Wisconsin) 4. - WBS Dictionary Description Includes the design, procurement, resurrection, construction, integration, and testing of subsystems located at the borehole: Tower Operations Structure, Drill Tower, Drillheads and controls, Main Drill Cable Reel, Main Drill Hose Reel, Main Drill Hose, Return Water Hose Reel, Return Water Cable Reel, and downhole drill cable... | |
1 | |
Appears In: | BOE-1-2-3.pdf |
DocuShare is now read-only. Use Google Drive.