Skip to Contents

The server is currently operating in read-only mode to allow routine maintenance operations to be performed.

Properties cannot be edited at this time.

View Properties

BOE-1-2-3.pdf
Handle: Version-105544
Owner: O'Dell, Vivian (User-2054, vodell:LDAP)DS
Tuesday, May 10, 2022 01:41:46 PM CDT
Wednesday, May 25, 2022 02:40:05 PM CDT
Modified By:
- Last revision: 10 May 2022 1 Basis of Estimate 1. - WBS ID 1.2.3 $128,644 total cost for this WBS 2. - WBS Name Tower Operations Site (TOS) - Off-ice 3. - Estimated by Terry Benson (University of Wisconsin) 4. - WBS Dictionary Description Includes the design, procurement, resurrection, construction, integration, and testing of subsystems located at the borehole: Tower Operations Structure, Drill Tower, Drillheads and controls, Main Drill Cable Reel, Main Drill Hose Reel, Main Drill Hose, Return Water Hose Reel, Return Water Cable Reel, and downhole drill cable...
1
Appears In: BOE-1-2-3.pdf