1. MASTER INPUT SHEET
  2. Floats
  3. Summary tables
  4. Southbound by Season
  5. Intra Inter Cargo Summary
  6. Project Roll Up
  7. Retro

  A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS AT AU
1 Cargo Item respective WBS Level Work Package Item Description Contents & Comments Length (in) Width (in) Height (in) Quantity Unit Volume (cu ft) Total Volume
(cu ft) = quantity x unit volume
Unit Weight (lbs) Total Weight (lbs) = quantity x unit weight Basis of Estimate Special Handling? Owner/Guardian institution SHIPMENT FLOAT: Time between completion and
ship-by-date to USAP site
Date of actuaL or expected [from schedule]
completion
Ship by date or actual shipment date Expected Route: Owner - PTH or CHC Recommended Transportation Option Expected Route:
PTH - MCM or CHC
Recommended Intercontinental Shipping Date (FY) [CALCULATED] Recommended Transportation Option to CHC/MCM [INPUT] Expected Route:
CHC - MCM [CALCULATED]
Vessel Container Allocation 40F Vessel Container Allocation 40D Vessel Container Allocation 20D Vessel Container Allocation 20F C-17/LC-130
CHC --> MCM
Pallet Allocation
Date Item expected or arrived to MCM [INPUT] Recommended Intracontinental Date (FY)
[CALCULATED]
Recommended
Intracontinental Mode
MCM--> NPX [CALCULATED]
SPOT Sled Allocation - Swing 1 (11/27) SPOT Sled Allocation - Swing 2 (12/25) SPOT Sled Allocation - Swing 3 (2/5) LC-130
MCM --> NPX
Pallet Allocation
Suggested arrival date at South Pole [INPUT] Latest possible arrival date at South Pole
[from schedule]
FLOAT AT NPX (delivery to required) [days] Total Time Between Ship-By-Date and Latest Arrival Date at NPX [days] Critical Path Validator 1
(SME)
Validation Date Validator 2
(Logistics)
Validation Date2 Notes  
2 Cargo staged in Port Hueneme  
3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  
4 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  
5 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  
6 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  
7 Pt. Hueneme totals: TEU=> 0.0 0 0  
8 Cargo staged in McMurdo  
9 1.2 Drill Gen 1 - housed in 20' container Power generation unit 1 housed in 20' shipping container 240 96 102 1 1,360 1,360 22,000 22,000 actual - U. Wisc. Madison In McMurdo 2/6/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 12/1/2023 334 - Yes D. Gibson 10/6/2021 I. McEwen 10/6/2021 Will require crane for onload/offload - use belly band to support container sidewalls during lift.  
10 1.2 Drill Gen 2 - housed in 20' container Power generation unit 2 housed in 20' shipping container 240 96 102 1 1,360 1,360 22,000 22,000 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo FY23 inter FY23 Vessel USAP Vessel - - - - - 2/6/2023 FY24 intra FY24 SPOT 1 0.50 - - 12/1/2023 12/1/2023 0 - Yes I. McEwen 2/24/2022 D.Tosi 2/24/2022 Gens 2 Going back to CHC for repairs  
11 1.2 Drill Gen 3 - housed in 20' container Power generation unit 3 housed in 20' shipping container 240 96 102 1 1,360 1,360 22,000 22,000 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 12/1/2023 334 - Yes D. Gibson 10/6/2021 I. McEwen 10/6/2021 Gens 2 & 3 need to be tranferred from ISO2 sleds that are limited to use on improved surfaces only. Will require crane for onload/offload - use belly band to support container sidewalls during lift.  
12 1.2 Drill Gen Discharge Hoods (bermed) Generator air discharge hoods , sheet metal, loose - stored on berm at SPOTSA 108 53 60 2 199 398 330 660 actual - U. Wisc. Madison In McMurdo 12/15/2019 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.25 - - - 12/1/2022 12/12/2023 376 - No D. Gibson 10/8/2021 I. McEwen 10/8/2021 Testing/limited operation of Gens can be accomplished without hoods - Hoods required for the drill season  
13 1.2 Drill Firn Drill Bermed in McM - will require McM fork or crane support. 264 94 97 1 1,394 1,394 12,000 12,000 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 12/15/2023 348 - Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Bermed in McMurdo - SPOTSA  
14 1.2 Drill Weight stack and crates Bermed in McM - will require McM fork support. Drill head weight stack and remaining bermed crates at SPoTSA 120 48 48 1 160 160 600 600 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.25 - - - 12/1/2022 12/1/2025 1096 - No D. Gibson 10/8/2021 I. McEwen 10/8/2021 Bermed in McMurdo - SPOTSA on UNL flatrack  
15 1.2 Drill Fuel Tower Bermed in McM - will require McM fork or crane support. 96 72 120 1 480 480 1,500 1,500 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.25 - - - 12/1/2022 12/5/2023 369 - Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Bermed in McMurdo - SPOTSA on UNL flatrack - overland shipment preferred due to complexities of air transport certification - can be laid on side once drained  
16 1.2 Drill HPU 2 HPU 2 (University of Nebraska - Lincoln asset) - 40' container housing heating plant on ISO sled 480 96 102 1 2,720 2,720 28,000 28,000 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 3 - - 1.00 - 2/1/2023 1/17/2024 350 - Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 HPU 1 integration with Rodwell system required before drill season on it's own sled which will require evaluation and repair - Stored at SPOTSA  
17 1.2 Drill 8' Refit Container Priority refit materials including tools, flowmeter assemblies, motor drive installation kits, hardware, fittings, sensors, & consumables 96 86 96 1 459 459 5,000 5,000 actual - U. Wisc. Madison In McMurdo 11/3/2021 11/16/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.25 - - - 12/1/2022 11/14/2023 348 728 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 8' container moves with contents by LC130 or is broken down for movement by Basler. Packing in progress.  
18 1.2 Drill 20' Refit Container A Refit materials incl. submersible pumps, hardware, filtration components, fall arrest towers, tools, hose crimper and camp hose (2 spools 348 cf/4990 lbs each) 240 96 102 1 1,360 1,360 17,320 17,320 actual - U. Wisc. Madison In McMurdo 11/13/2021 11/16/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 11/14/2023 317 728 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 For air shipment container contents will need to be unloaded and palletized. Container procurement delayed by shortage. Packing in progress.  
19 1.2 Drill 20' Refit Container B Bulky materials incl. cable trays, vertical turbine pumps, vertical turbine pump motors, ladders, water tank doghouse/railing materials, 287 forks, generator parts, TU20 shaft, & drill weight stack 240 96 102 1 1,360 1,360 14,280 14,280 actual - U. Wisc. Madison In McMurdo 11/2/2021 11/2/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 12/15/2023 348 773 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 For air shipment container contents will need to be unloaded and palletized  
20 1.2 Drill ARA Trailer Enclosed trailer on skis housing 35kw generator 192 96 88 1 939 939 5,400 5,400 actual FLAMMABLE liquid power engine U. Wisc. Madison In McMurdo 11/2/2021 11/2/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.50 - - - 12/1/2022 12/7/2023 371 765 Yes* D. Gibson 10/8/2021 I. McEwen 10/8/2021 *If this shipment is delayed 480 volt power generation support will be required in FW YR 1 by the contractor. Aside from the CRREL generator (far larger than required with high fuel burn rate) the capacity does not currently exist at the Pole.  
21 1.2 Drill Return Water Cable Reel (RWCR) Smaller reel - can fit in 20' container. Required onsite in FY23 for final integration and pre-drill activites 112 80 80 1 415 415 4,000 4,000 actual - U. Wisc. Madison In McMurdo 10/26/2021 11/2/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.25 - - 1/1/2023 1/3/2024 367 792 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Weight from Gen 1 shipment information see picture.  
22 1.2 Drill Main Cable Reel (MCR) Required onsite in FY23 for final integration and pre-drill activites. Large cable reel - will require flat rack on vessel 140 96 95 1 739 739 17,800 17,800 actual - U. Wisc. Madison In McMurdo 11/8/2021 11/16/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.25 - - 1/1/2023 1/3/2024 367 778 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Required onsite in FS Y1 for final integration and pre-drill activities. Shrink wrap contractor rescheduled for later date.  
23 1.2 Drill Container Ski Stack (comprised of 5 sleds) Five sets of aluminum skis for 20' containers - stacked. Aluminum skis for drill containers. Required onsite for local movement of Gens and PDM. 240 96 96 1 1,280 1,280 4,255 4,255 actual - U. Wisc. Madison In McMurdo 12/28/2020 1/15/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.50 - - - 12/1/2022 1/1/2023 31 716 No* D. Gibson 10/8/2021 I. McEwen 10/8/2021 *While this shipment is not on the critical path additional ASC crane support will be required to overcome delayed arrival or sleds furnished from the South Pole inventory  
24 1.2 Drill Generator Intake Hood Light weight large volume sheet metal stacks for generator ventilation 174 53 96 3 513 1,539 587 1,761 actual - U. Wisc. Madison In McMurdo 10/8/2020 11/24/2020 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.50 - - - 12/1/2022 12/12/2023 376 1113 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -  
25 1.2 Drill Generator Discharge Hoods Light weight large volume sheet metal stacks for generator ventilation 108 53 60 2 199 398 1,210 2,420 actual - U. Wisc. Madison In McMurdo 10/8/2020 11/24/2020 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.50 - - - 12/1/2022 12/12/2023 376 1113 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -  
26 1.2 Drill Drill Hose Drill hose - 9 Spools - 348 cf / 3532 lbs each - Shipped from Italy - Do Not Deep Freeze 92 92 70 9 346 3,114 3,532 31,788 actual DNDF [-53C] U. Wisc. Madison In McMurdo 7/29/2020 8/15/2020 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY25 intra FY25 SPOT 1 1.80 - - - 12/1/2024 12/15/2024 14 1583 Yes D. Gibson 10/8/2021 I. McEwen 3/10/2022 Hose to be installed on Main Supply Hose Reel upon arrival at Pole  
27 1.2 Drill Drill Hose Drill hose - 3 Spools - 348 cf / 5001 lbs each - Shipped from PSL - Do Not Deep Freeze 92 92 70 3 346 1,038 5,001 15,003 actual DNDF [-53C] U. Wisc. Madison In McMurdo 11/19/2020 1/15/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY25 intra FY25 SPOT 1 0.60 - - - 12/1/2024 12/15/2024 14 1430 Yes D. Gibson 10/8/2021 I. McEwen 3/10/2022 Hose to be installed on Main Supply Hose Reel upon arrival at Pole  
28 McMurdo totals: TEU=> 23.0 21,873 227,787  
29 Cargo staged at South Pole  
30 1.2 Drill 287 Loader Required onsite early in FY23 for refit/pre-drill activity support unless ASC can supply dedicated loader for Upgrade use 114 77 96 1 488 488 10,273 10,273 actual - U. Wisc. Madison At South Pole 10/15/2019 11/15/2019 At South Pole Truck At South Pole at South Pole at South Pole at South Pole - - - - - at South Pole at South Pole at South Pole - - - - at South Pole 12/1/2023 at South Pole 1477 No* D. Gibson 10/7/2021 I. McEwen 10/7/2021 *Required onsite early in FY23 for refit/pre-drill activity support unless ASC can supply dedicated loader for Upgrade use  
31 1.2 Drill Firn Drill Components - 1 Firn drill sheave. Required Field Season 2 for final refit & functional testing 97 44 63 1 156 156 920 920 actual - U. Wisc. Madison At South Pole 1/15/2020 - At South Pole - At South Pole at South Pole at South Pole at South Pole - - - - - at South Pole at South Pole at South Pole - - - - at South Pole 12/1/2024 at South Pole - Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -  
32 1.2 Drill Firn Drill Components - 2 Firn drill drillhead. Required Field Season 2 for final refit & functional testing 125 33 37 1 89 89 1,048 1,048 actual - U. Wisc. Madison At South Pole 1/15/2020 - At South Pole - At South Pole at South Pole at South Pole at South Pole - - - - - at South Pole at South Pole at South Pole - - - - at South Pole 12/1/2024 at South Pole - Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -  
33 South Pole totals: TEU=> 0.8 733 12,241  
34 Cargo departing UW/PSL  
35 1.2 Drill ARA Drill System Components - Crate #1 ARA (Antarctic Rodwell Appartus) - downhole pump controller, ePump controller, splash cam kit, and accessories - Do Not Freeze 96 48 48 1 128 128 1,200 1,200 estimated DNF U. Wisc. Madison 30 9/15/2022 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - - 0.50 0.25 2/6/2023 FY24 intra FY24 LC-130 - - - 0.25 11/15/2023 12/1/2023 16 412 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -  
36 1.2 Drill Computing/controls components Shipment #1 Components and equipment to support field season 1 controls system tasking). Controls infrastructure - Motor drives, PLCs, electrical hardware, and motor drive mounting kits) - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 14 10/1/2022 10/15/2022 UWM - PTH Truck PTH - CHC FY23 inter FY23 Vessel USAP Vessel - - - - 0.50 2/6/2023 FY24 intra FY24 LC-130 - - - 0.50 11/15/2023 11/15/2023 0 396 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Weight estimated  
37 1.2 Drill Computing/controls components Shipment #2 Computing and controls equipment (Motor drives and other sensitive electronics) - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 31 7/1/2023 8/1/2023 UWM - PTH Truck PTH - CHC FY24 inter FY24 ComSur USAP Air - - - - 0.50 11/1/2023 FY24 intra FY24 LC-130 - - - 0.50 11/15/2023 11/15/2023 0 106 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Required onsite in FW YR 2 to support controls system tasking  
38 1.2 Drill Computing/controls components Shipment #3 Computing and controls equipment (Sensor, motor drives and other sensitive electronics) - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 31 7/1/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.50 11/1/2024 FY25 intra FY25 LC-130 - - - 0.50 11/15/2024 11/15/2024 0 106 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -  
39 1.2 Drill 20' Refit Container C: Bull Wheel, Spare Combo & Drill Cables, Hose Heating System Components, ARA Drill System Components Crate #2 Bull wheel assembly - used to install main cable on reel in event of main cable damage/failure; Spare cable for Return Water Cable Reel - on spool; ARA new downhole pumps, spares, accessories and tools 240 96 102 1 1,360 1,360 21,500 21,500 actual - U. Wisc. Madison 31 9/14/2022 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 1.00 - - 2/6/2023 FY24 intra FY24 SPOT 1 0.50 - - - 12/1/2023 1/22/2025 418 830 Yes I. McEwen 2/24/2022 D. Tosi 2/24/2022 Consolidation: 20 ft container with Bull Wheel, Spare Combo & Drill Cables, Hose Heating System Components, ARA Drill System Components Crate #2  
40 1.2 Drill Driller resupply/refit components - 8' Container FS2 8' Mini Milvan; Consumables/drill components 96 86 96 1 459 459 6,500 6,500 estimated - U. Wisc. Madison 31 7/1/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 1.00 11/1/2024 FY25 intra FY25 LC-130 - - - 1.00 11/15/2024 11/15/2024 0 106 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Items identifed in prior field season - 8' container moves with contents overland or by air  
41 1.2 Drill Drill refit components FS2 Single crate. Consumables/drill refit components - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 31 7/1/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 Comsur USAP Air - - - - 0.50 11/1/2024 FY25 intra FY25 LC-130 - - - 0.50 11/15/2024 11/15/2024 0 106 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Items identifed in prior field season  
42 1.2 Drill Driller resupply/refit components - 8' Container FS3 8' Mini Milvan; Consumables/drill components 96 86 96 1 459 459 6,500 6,500 estimated - U. Wisc. Madison 31 7/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 1.00 11/1/2025 FY26 intra FY26 LC-130 - - - 1.00 11/15/2025 11/15/2025 0 106 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Items identifed in prior field season - 8' container moves with contents overland or by air  
43 1.2 Drill Drill refit components FS3 Single crate. Consumables/drill refit components - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 31 7/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 Comsur USAP Air - - - - 0.50 11/1/2025 FY26 intra FY26 LC-130 - - - 0.50 11/15/2025 11/15/2025 0 106 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Items identifed in prior field season  
44 1.2 Drill Drill Heads - X Drill Heads - XDrill Heads for winterover storage - ICL - Do Not Freeze 192 24 24 1 64 64 1,060 1,060 actual DNF U. Wisc. Madison 409 9/1/2021 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 0.25 - - 2/6/2023 FY24 intra FY24 LC-130 - - - 0.30 2/6/2024 11/15/2025 648 1127 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 One drill head shipped one year early for ull system wet-test  
45 1.2 Drill Drill Heads - Y Drill Heads - YDrill Heads for winterover storage - ICL - Do Not Freeze 192 24 24 1 64 64 1,060 1,060 actual DNF U. Wisc. Madison 409 9/1/2021 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 0.25 - - 2/6/2023 FY24 intra FY24 LC-130 - - - 0.30 2/6/2024 11/15/2025 648 1127 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -  
46 1.2 Drill Drill Heads - R Drill Heads - RDrill Heads for winterover storage - ICL - Do Not Freeze 192 24 24 1 64 64 1,060 1,060 actual DNF U. Wisc. Madison 409 9/1/2021 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 0.25 - - 2/6/2023 FY24 intra FY24 LC-130 - - - 0.30 2/6/2024 11/15/2025 648 1127 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -  
47 1.2 Drill Load member cable reel [placeholder, may not be required] Cable Reel used to deploy downhole load member during string installation 84 60 48 1 140 140 3,800 3,800 estimated - U. Wisc. Madison 136 6/1/2023 10/15/2023 UWM - PTH Truck PTH - MCM FY24 inter FY24 Vessel USAP Vessel - - - 0.25 - 2/6/2024 FY25 intra FY25 SPOT 2 - 0.25 - - 1/1/2025 6/1/2025 151 595 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Required onsite in FW YR 2 for integration - recent addition, still in development  
48 1.2 Logistics Accelerometer Loggers SPoT 1 1x1x1 box 12 12 12 1 1 1 5 5 estimated - U. Wisc. Madison 62 7/1/2022 9/1/2022 UWM - PTH Truck PTH - CHC FY23 inter FY23 ComSur USAP Air - - - - 0.01 10/18/2022 FY23 intra FY23 SPOT 1 - - - 0.01 12/1/2022 12/1/2022 0 91 Yes I. McEwen 2/28/2022 D. Tosi 2/28/2022 -  
49 1.2 Logistics Accelerometer Loggers SPoT 2 1x1x1 box 12 12 12 1 1 1 5 5 estimated - U. Wisc. Madison 62 7/1/2022 9/1/2022 UWM - PTH Truck PTH - CHC FY23 inter FY23 ComSur USAP Air - - - - 0.01 10/18/2022 FY23 intra FY23 SPOT 2 - - - 0.01 1/1/2023 1/1/2023 0 122 Yes I. McEwen 2/28/2022 D. Tosi 2/28/2022 -  
50 1.4 Installation ICL power and timing electronics 1 crate containing rackmount electronics for power and timing systems - Do Not Freeze 96 48 48 1 128 128 600 600 estimated DNF U. Wisc. Madison 462 4/27/2023 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 11/30/2024 12/1/2024 1 122 Yes J. Kelley 10/12/2021 D. Tosi 4/11/2022 -  
51 1.4 Installation ICL patch cables and patch panels Standard vessel shipping - can overwinter in McM if shipped earlier - Do Not Deep Freeze 96 48 48 1 128 128 1,200 1,200 estimated DNDF [TBD] U. Wisc. Madison 624 11/16/2022 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 11/30/2024 12/1/2024 1 122 Yes J. Kelley 10/12/2021 D. Tosi 4/11/2022 (*) storage in McMurdo pending low temperature test  
52 1.2 Installation DOM Handling Facility (DHF) Standard vessel shipping - can overwinter in McM. 240 96 96 1 1,280 1,280 12,000 12,000 estimated - U. Wisc. Madison 50 8/26/2022 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 1.00 - - 2/6/2023 FY24 intra FY24 SPOT 1 0.50 - - - 12/1/2023 12/3/2024 368 780 Yes D. Gibson 10/8/2021 I. McEwen 4/11/2022 Sensor Handling Facility construction scheduled to begin mid-December FY24  
53 1.2 Installation Installation Hardware 87-93 Installation hardware 96 48 48 7 128 896 1,000 7,000 estimated - U. Wisc. Madison 97 7/10/2023 10/15/2023 UWM - PTH Truck PTH - MCM FY24 inter FY24 Vessel USAP Vessel - - 2.00 - - 2/6/2024 FY25 intra FY25 SPOT 2 - 0.10 - - 1/1/2025 11/18/2025 321 765 Yes D. Tosi 9/22/2021 I. McEwen 9/22/2021 -  
54 1.2 Installation Installation Weights 87-93 Installation weights 36 24 24 7 12 84 786 5,502 estimated - U. Wisc. Madison 110 6/27/2023 10/15/2023 UWM - PTH Truck PTH - MCM FY24 inter FY24 Vessel USAP Vessel - - 1.00 - - 2/6/2024 FY25 intra FY25 SPOT 2 - 0.10 - - 1/1/2025 11/18/2025 321 765 Yes D. Tosi 9/22/2021 I. McEwen 9/22/2021 -  
55 1.2 Installation Misc. Science Equipment - FS2 (FY25) Scientific and test equipment (SPAT, DCM, IME, Paros et al.) - Do Not Freeze 48 48 48 1 64 64 1,500 1,500 estimated DNF U. Wisc. Madison 50 6/12/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 11/30/2024 12/1/2024 1 122 Yes T. Karg 10/8/2021 D. Tosi 10/8/2021 -  
56 1.2 Installation Misc. Science Equipment - FS3 (FY26) Scientific and test equipment - Do Not Freeze [science supplies for FS3] 48 48 48 1 64 64 1,500 1,500 estimated DNF U. Wisc. Madison 25 7/7/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/15/2025 12/1/2025 16 122 Yes D. Tosi 10/8/2021 D. Tosi 10/8/2021 -  
57 1.5 Installation Calibration/Special Devices 87-88 3+1 PencilBeams from UW, 2+1 pDOM and 1+1 LOMs - Do Not Deep Freeze 58 38 41 1 53 53 836 836 estimated DNDF [-40C] U. Wisc. Madison 2 7/30/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13 149 Yes D. Williams 10/13/2021 D. Tosi 10/13/2021 -  
58 1.3 Installation Special Devices 87-88 Special devices for 2 strings from UW (4+1 Radio Pulsers (all strings) 1+1 Radio Receivers, 3+1 FOM) - Do Not Deep Freeze 63 40 42 1 62 62 677 677 preliminary DNDF [-40C] UWM/Kansas 2 7/30/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13 149 Yes S. Boeser 10/13/2021 D. Tosi 10/13/2021 4+1 Radio Pulser, weight 50 kg. 1+1 Radio receiver, assume mDOM weight, 3+1 FOM (assume mDOM weight) + 2ftx2ftx4ft FOM box (50 lbs). Special Devices from UW. FTS, seismometer missing from estimate. 250 lbs crate estimate  
59 1.3 Installation Special Devices 89-93 Special devices for 5 remaining strings from UW (4+1 FOM,2+1 Radio Receivers, 11+1 LOM + seismometer*) - Do Not Deep Freeze 81 56 51 1 134 134 1,797 1,797 estimated DNDF [-40C] UWM/Kansas 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 1.50 11/1/2025 FY26 intra FY26 LC-130 - - - 1.50 11/25/2025 12/10/2025 15 131 Yes S. Boeser 10/13/2021 D. Tosi 10/13/2021 21 Special Devices from USA (11+ 1 LOM, 4+1 FOM, 2+1 RR, FTS ? , seismometer), assume mDOM weight. 200 lbs wood crate. FTS not included. (*) Seismometer not yet in CMD  
60 1.5 Installation Calibration/Special Devices 89-93 8+1 PencilBeams, 12+1 pDOMs from UW - Do Not Deep Freeze 75 56 41 1 101 101 1,602 1,602 preliminary DNDF [-40C] U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.50 11/1/2025 FY26 intra FY26 LC-130 - - - 0.50 11/25/2025 12/10/2025 15 131 Yes D. Williams 10/13/2021 D. Tosi 10/5/2021 8+1 PencilBeams for strings 89-93, 12+1 pDOMs, assume mDOM weight. 244 lbs crate.  
61 1.5 Installation Dust logging device Blue Logging device - sensitive equipment - Do Not Freeze 48 17 17 1 9 9 60 60 actual DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15 131 Yes D. Williams 10/14/2021 D. Tosi 9/18/2021 Used weights from last deployment season shipment data (could be combined)  
62 1.5 Installation Dust logging device Green Logging device - sensitive equipment - Do Not Freeze 48 17 17 1 9 9 60 60 actual DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15 131 Yes D. Williams 10/14/2021 D. Tosi 9/19/2021 Used weights from last deployment season shipment data (could be combined)  
63 1.5 Installation Dust logging device Electronics parts - sensitive equipment - Do Not Freeze 26 24 24 1 9 9 120 120 actual DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15 131 Yes D. Williams 10/14/2021 D. Tosi 9/20/2021 Used weights from last deployment season shipment data (could be combined)  
64 1.5 Installation Dust logging device Electronics parts - sensitive equipment - Do Not Freeze 26 23 20 1 7 7 60 60 actual DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15 131 Yes D. Williams 10/14/2021 D. Tosi 9/21/2021 Used weights from last deployment season shipment data (could be combined)  
65 1.5 Installation Logging winch Winch to be used for Dust Logging 86 60 68 1 204 204 3,500 3,500 preliminary U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.50 11/1/2025 FY26 intra FY26 LC-130 - - - 0.50 11/25/2025 12/10/2025 15 131 Yes D. Tosi 10/8/2021 I. McEwen 10/8/2021 Used weights and cubes of IDP deep logging winch. Send back end of season  
66 1.5 Installation Logging winch control box Control Box for winch for Dust Logging - sensitive equipment - Do Not Freeze 48 48 36 1 48 48 400 400 preliminary DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/25/2025 12/10/2025 15 131 Yes D. Tosi 10/8/2021 I. McEwen 10/8/2021 Used weights and cubes of IDP deep logging winch. Send back end of season  
67 U. Wisconsin totals: TEU=> 7.0 6,660 96,104
68 Cargo departing MSU  
69 1.4 Installation Surface Junction Boxes Surface Junction Boxes can overwinter in McM if shipped earlier. 7 junction boxes 66 30 14 7 17 119 200 1,400 preliminary - MSU 2 10/13/2022 10/15/2022 MSU - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 1.00 - - 2/6/2023 FY24 intra FY24 SPOT 1 0.50 - - - 12/1/2023 12/15/2024 380 792 Yes T. DeYoung 10/13/2021 D. Tosi 4/11/2022 Each is 66" x 30" x 14", each is 112 lbs. Assume Folding crate. Simple passive objects, work plan can probably be shifted to increase float.  
70 1.4 Installation Surface Cable Assemblies Palletized wooden cable drums (Qty: 7). Can overwinter in MCM. Do Not Deep Freeze 48 65 71 7 129 903 1,336 9,352 actual DNDF [-55C] MSU 106 7/1/2022 10/15/2022 MSU - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 2.00 - - 2/6/2023 FY25 intra FY25 SPOT 1 0.50 - - - 12/1/2024 12/15/2024 14 792 Yes T. DeYoung 10/13/2021 D. Tosi 4/11/2022 Shipping date early due to storage limitations at MSU. Additional float at Port Hueneme assuming USAP vessel departure.  
71 1.4 Installation Breakout cables for strings 87-88 Standard vessel shipping. 2 wooden crates containing spooled breakout cable assemblies - 96 cf / 1,000 lbs each - Cryo storage - Do Not Deep Freeze 72 48 48 2 96 192 1,000 2,000 estimated DNDF[-40C](*) MSU 477 6/26/2023 10/15/2024 MSU - PTH Truck PTH - MCM FY25 inter FY25 Vessel USAP Vessel - 0.25 - - - 2/6/2025 FY25 intra FY25 LC-130 - - - 0.50 2/15/2025 12/10/2025 298 421 Yes T. DeYoung 9/20/2021 D. Tosi 4/11/2022 Shipping date early due to storage limitations at MSU. Additional float at Port Hueneme assuming USAP vessel departure. Preliminary estimate of weight and size. Pre-staging string 87-88 equipment in cryo or ICL. - if storage at Pole not possible, could overwinter in McM (at an increased risk and pending low temperature test) (*)  
72 1.4 Installation Breakout cables for strings 89-93 Stored in McMurdo FY24. 5 wooden crates containing spooled breakout cable assemblies - 96 cf/ 1,000 lbs each (preliminary) - Do Not Deep Freeze 72 48 48 5 96 480 1,000 5,000 estimated DNDF[-40C](*) MSU 379 10/2/2023 10/15/2024 MSU - PTH Truck PTH - MCM FY25 inter FY25 Vessel USAP Vessel - - 2.00 - - 2/6/2025 FY26 intra FY26 LC-130 - - - 1.00 11/25/2025 12/10/2025 15 421 Yes T. DeYoung 9/20/2021 D. Tosi 4/11/2022 Float in PTH due to storage limitation in MSU.
(*) storage in McMurdo pending low temperature test
 
73 1.4 Installation Main (downhole) load members 87-93 [placeholder, may not be required] May be possible to store in McMurdo until drill season - Do Not Deep Freeze 47 47 39 7 50 350 766 5,362 preliminary DNDF[-40C](*) MSU 563 4/1/2023 10/15/2024 MSU - PTH Truck PTH - MCM FY25 inter FY25 Vessel USAP Vessel - - 1.00 - - 2/6/2025 FY26 intra FY26 SPOT 1 1.00 - - - 12/1/2025 12/2/2025 1 413 Yes T. DeYoung 9/20/2021 D. Tosi 10/11/2021 Shipping date synched with main (downhole) cables due to storage limitation in MSU. Float in PTH.  
74 1.4 Installation Main (downhole) cables 87-93 May be possible to store in McMurdo until drill season - Do Not Deep Freeze 96 96 96 7 512 3,584 15,000 105,000 preliminary DNDF[-40C](*) MSU 31 9/14/2023 10/15/2023 MSU - PTH Truck PTH - MCM FY24 inter FY24 Vessel USAP Vessel - - 2.00 - - 2/6/2025 FY26 intra FY26 SPOT 1 1.50 - - - 12/1/2025 12/2/2025 1 779 Yes T. DeYoung 9/20/2021 D. Tosi 4/11/2022 Shipping date chosen to be 2 weeks after scheduled ready to ship date because of storage limitations at MSU. additional 7 months of float at Port Hueneme assuming USAP vessel departure. (*) storage in McMurdo pending low temperature test.  
75 1.3 Installation String Sensors 89-93 (mDOMs MSU) Optical Sensors for 5 strings from MSU (mDOMs) - Do Not Deep Freeze 40 48 46 25 52 1,300 573 14,325 actual(**) DNDF [-40C] MSU 686 9/15/2023 8/1/2025 MSU - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 3.00 11/1/2025 FY26 intra FY26 LC-130 - - - 3.00 11/25/2025 12/10/2025 15 131 Yes T. Karg 9/20/2021 D. Tosi 4/11/2022 mDOM weight is 28 kg/boxed + 35kg pallet, assume 8 mDOMs/pallet (189 to be deployed + 11 spares)(*)Assumed to be shipped in 2x20' HC (5115 lbs, 238inx96inx114in) or a 40 ft HC, purchased by MSU or loaned in PTH (container weight not included)  
76 1.3 Installation String Sensors 89-93 (mDOMs MSU) Optical Sensors for 5 strings from MSU (mDOMs) containers (TBD) - Do Not Deep Freeze 238 96 114 0 1,508 0 5,115 0 actual(**) DNDF [-40C] MSU 686 9/15/2023 8/1/2025 MSU - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15 131 Yes T. Karg 9/20/2021 D. Tosi 4/11/2022 Assume 2x20HC containers for transport on COMSUR (TBC). Pallets could be loaded to 53 ft truck and loaded into a loaned container in PTH but this would increase touch points (and risk)  
77 MSU Totals: TEU=> 7.3 6,928 142,439  
78 Cargo departing other institutions in US  
79 1.3 Installation DM-Ice DM-ice (two modules for string 89 and 90) - Do Not Deep Freeze 48 48 48 1 64 64 1,500 1,500 estimated DNDF [-40C] Yale 426 6/1/2024 8/1/2025 Yale - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/15/2025 12/5/2025 20 126 Yes M. Kauer 9/20/2021 D. Tosi 9/20/2021 -  
80 Other Institutions Totals: 0.1 64 1,500  
81 Cargo departing Germany (Europe)  
82 1.3 Installation String Sensors 87-88 (mDOMs DESY) Optical sensors for 2 strings from Germany (mDOMs) (spares included) - Do Not Deep Freeze 40 48 46 16 52 832 573 9,168 actual DNDF [-40C] DESY 440 5/19/2023 8/1/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 2.00 11/1/2024 FY25 intra FY25 LC-130 - - - 2.00 12/15/2024 12/28/2024 13 149 Yes T. Karg 9/20/2021 D. Tosi 9/22/2021 mDOM weight is 62 lbs (25kg/sensor + 3 kg/box) + 35kg pallet, assume 8 mDOMs/pallet - 116 to be deployed + 12 spares -
shipped in 20 HC container. Container weight not included in the assumption that pallet will be taken out in CHC.
 
83 1.3 Installation String Sensors 87-88 (mDOMs DESY) Optical sensors for 2 strings from Germany (mDOMs) (SPARES) - Do Not Deep Freeze 40 48 46 0 52 0 573 0 actual DNDF [-40C] DESY 440 5/19/2023 8/1/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13 149 Yes T. Karg 9/20/2021 D. Tosi 9/22/2021 mDOM weight is 62 lbs (25kg/sensor + 3 kg/box) + 35kg pallet, assume 8 mDOMs/pallet - shipped in 20 HC container. Container weight not included in the assumption that pallet will be taken out in CHC.  
84 1.3 Installation Special Devices 87-88 (Europe) Special devices for 2 strings from DESY/Germany/Sweden (8 WOMs, 0 Abalone) + spares - Do Not Deep Freeze 40 21 64 1 32 32 701 701 estimated DNDF [-40C] Mainz 578 1/1/2023 8/1/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13 149 Yes S. Boeser 10/13/2021 D. Tosi 10/13/2021 8 WOMs (no spares) - AH not included for now. Assume 150 lbs crate.  
85 1.5 Installation Calibration Devices 87-88 (Europe) Calibration devices for 2 strings from DESY/Germany/Sweden (4+2 POCAMs, 3+1 Acoustic sensors, 2+1 Swedish Cameras) - Do Not Deep Freeze 62 38 41 1 56 56 836 836 estimated DNDF [-40C] TUM/Aachen/Sweden 792 6/1/2022 8/1/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13 149 Yes D. Williams 10/13/2021 D. Tosi 10/13/2021 Calibration devices for strings 87-88 = 2+1 Sweden Camera + 3+1 Acoustic Module + 4+1 POCAM, including spares, 200 lbs crate  
86 1.4 Installation FieldHub electronics Required onsite for FY24 installation. 1 crate containing readout electronics for installation in ICL - Do Not Freeze 48 48 36 1 48 48 275 275 preliminary DNF DESY 304 10/16/2023 8/15/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 11/30/2024 12/1/2024 1 108 No J. Kelley 10/13/2021 D. Tosi 4/11/2022 Field Hubs are 442mm x 480mm x 133 mm (17.4" x 18.9" x 5.2") and weight maybe 10 lb each. 100 lbs crate. Ready to ship date actually chosen to be 2 weeks ahead of ship date to maximize time with the electronics (sort of backloaded)  
87 1.3 Installation String Sensors 89-93 (mDOMs DESY) Optical sensors for 5 strings from Germany (mDOMs) - Do Not Deep Freeze 40 48 46 12 52 624 573 6,876 actual(**) DNDF [-40C] DESY 721 8/11/2023 8/1/2025 DESY - CHC ComSur DESY-CHC FY26 inter FY26 ComSur USAP Air - - - - 3.00 11/1/2025 FY26 intra FY26 LC-130 - - - 3.00 11/25/2025 12/10/2025 15 131 Yes T. Karg 9/20/2021 D. Tosi 4/11/2022 mDOM weight is (28kg/sensor boxed) + 35kg pallet, assume 8 mDOMs/pallet - 190 to be deployed + 10 spares. (**) shipped in 20 HC container. Container not included in weight as pallets will be taken out.  
88 1.3 Installation Special Devices 89-93 (Europe) Special devices for 5 remaining strings from DESY/Germany/Sweden (6 WOMs, 3 Abalone Hubs or WOM Traps) no spares - Do Not Deep Freeze 32 31 89 1 52 52 1,035 1,035 preliminary DNDF [-40C] Mainz 578 1/1/2024 8/1/2025 DESY - CHC ComSur DESY-CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/25/2025 12/10/2025 15 131 Yes S. Boeser 10/13/2021 D. Tosi 10/13/2021 6 Special Devices from Germany 6 (WOM + 0 AH) including 0 spare for each. Assume 170 lbs crate.  
89 1.5 Installation Calibration Devices 89-93 (Europe) Calibration for 5 strings from DESY/Germany/Sweden (17+2 POCAMs, 7+ 1 Acoustic sensors, 3+ 1 Swedish Cameras) including spares - Do Not Deep Freeze 62 48 44 1 76 76 1,694 1,694 preliminary DNDF [-40C] TUM/Aachen/Sweden 1157 6/1/2022 8/1/2025 DESY - CHC ComSur DESY-CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/25/2025 12/10/2025 15 131 Yes D. Williams 10/13/2021 D. Tosi 10/13/2021 Calibration devices for strings 89-93 = 3+1 Sweden Camera,7+1 + Acoustic Module,17 +1 POCAM, including spares, 200 lbs crate  
90 DESY/Aachen/TUM/Sweden etc Totals: TEU=> 1.8 1,720 20,585  
91 Cargo departing Chiba (Japan)  
92 1.3 Installation String Sensors 87 & 88 (D-Eggs-8x) Sensors (D-Eggs) pallets with 8 sensors at Pole overwinter - Cryo location - Do Not Deep Freeze 41 41 69 4 68 272 750 3,000 actual DNDF [-40C] Chiba 736 7/27/2022 8/1/2024 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY25 inter FY25 ComSur USAP Air - - - - 1.00 11/1/2024 FY25 intra FY25 LC-130 - - - 1.00 12/15/2024 12/28/2024 13 149 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 Box size is 480x480x770mm (19"x19"x30.5"). 2x12-DEgg pallets combined with 2x8-DEgg pallets to form one 463L pallet
93 1.3 Installation String Sensors 87 & 88 (D-Eggs-8x) Sensors (D-Eggs) pallets with 8 sensors at Pole overwinter (SPARES - TBD) - Cryo location - Do Not Deep Freeze 41 41 69 1 68 68 750 750 actual DNDF [-40C] Chiba 736 7/27/2022 8/1/2024 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13 149 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 SPARES number to be confirmed.  
94 1.3 Installation String Sensors 87 & 88 (D-Eggs-12x) Sensors (D-Eggs) pallets with 12 sensors at Pole overwinter - Cryo location - Do Not Deep Freeze 60 41 69 4 99 396 1,102 4,408 actual DNDF [-40C] Chiba 736 7/27/2022 8/1/2024 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY25 inter FY25 ComSur USAP Air - - - - 1.00 11/1/2024 FY25 intra FY25 LC-130 - - - 1.00 12/15/2024 12/28/2024 13 149 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 2x12-DEgg pallets combined with 2x8-DEgg pallets to form one 463L pallet
95 1.3 Installation String Sensors 87 & 88 (D-Eggs-12x) Sensors (D-Eggs) pallets with 12 sensors at Pole overwinter (SPARES - TBD)- Cryo location - Do Not Deep Freeze 60 41 69 1 99 99 1,102 1,102 actual DNDF [-40C] Chiba 736 7/27/2022 8/1/2024 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13 149 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 SPARES number to be confirmed.  
96 1.3 Installation String Sensors 89-93 (D-Eggs-8x) Sensors (D-Eggs) pallets with 8 sensors - Do Not Deep Freeze 41 41 69 10 68 680 750 7,500 actual DNDF [-40C] Chiba 812 5/12/2023 8/1/2025 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY26 inter FY26 ComSur USAP Air - - - - 2.50 11/1/2025 FY26 intra FY26 LC-130 - - - 2.50 11/25/2025 12/10/2025 15 131 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 2x12-DEgg pallets combined with 2x8-DEgg pallets to form one 463L pallet
97 1.3 Installation String Sensors 89-93 (D-Eggs-12x) Sensors (D-Eggs) pallets with 12 sensors - Do Not Deep Freeze 60 41 69 10 99 990 1,102 11,020 actual DNDF [-40C] Chiba 812 5/12/2023 8/1/2025 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY26 inter FY26 ComSur USAP Air - - - - 2.50 11/1/2025 FY26 intra FY26 LC-130 - - - 2.50 11/25/2025 12/10/2025 15 131 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 2x12-DEgg pallets combined with 2x8-DEgg pallets to form one 463L pallet
98 Chiba Totals: TEU=> 2.6 2,505 27,780  
99 Fuel  
100 1.2 Fuel Field Season 0 Fuel Fuel to support following field seasons       0 0 6.8 0 preliminary - - - - - - - - FY23 inter - - - - - - 11/1/2022 FY23 intra FY23 LC-Tanker - - - 12/1/2022 12/1/2023 365 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -  
101 1.2 Fuel Field Season 1 Fuel Fuel to support FY23 field season - Base fuel       3,191 426.58 6.8 21,699 preliminary - - - - - - - - FY24 inter - - - - - - 11/1/2023 FY24 intra FY24 LC-Tanker - - - 12/1/2023 12/1/2023 0 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -  
102 1.2 Fuel Field Season 1 Fuel Contingency Fuel to support FY23 field season - Contingency       452 60.43 6.8 3,074 preliminary - - - - - - - - FY24 inter - - - - - - 11/1/2023 FY24 intra FY24 LC-Tanker - - - 12/1/2023 12/1/2023 0 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -  
103 1.2 Fuel Field Season 2 Fuel Fuel to support FY24 field season - Base fuel, firn drilling & over winter heating       18,178 2430.05 6.8 123,610 preliminary - - - - - - - - FY25 inter - - - - - - 11/1/2024 FY25 intra FY25 LC-Tanker - - - 12/1/2024 12/1/2024 0 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -  
104 1.2 Fuel Field Season 2 Fuel Contingency Fuel to support FY24 field season - Contingency       2,373 317.23 6.8 16,136 preliminary - - - - - - - - FY25 inter - - - - - - 11/1/2024 FY25 intra FY25 LC-Tanker - - - 12/1/2024 12/1/2024 0 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -  
105 1.2 Fuel Field Season 3 Fuel Fuel to support FY25 field season - Base fuel & deep drilling       62,694 8380.97 6.8 426,319 preliminary - - - - - - - - FY26 inter - - - - - - 11/1/2025 FY26 intra FY26 LC-Tanker - - - 12/1/2025 12/1/2025 0 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -  
106 1.2 Fuel Field Season 3 Fuel Contingency Fuel to support FY25 field season - Contingency       8,473 1132.68 6.8 57,616 preliminary - - - - - - - - FY26 inter - - - - - - 11/1/2025 FY26 intra FY26 LC-Tanker - - - 12/1/2025 12/1/2025 0 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -  
107 Fuel Totals: gallons 95,361.0 12,748 648,455  
108 All IC/Upgrade cargo volume (with fuel): TEU 55.9 53,231 1,176,891  
109 All IC/Upgrade cargo volume (without fuel): 42.5 40,483 528,436                
110 Legend:                                                                                    
111     Cargo Item Item to be procured or fabricated                                                                                
112     Description Brief description of item 11/20/2022 cargo ready before           304660.00 323180.00                                                                
113     Owner/Guardian UWIsc/ICNO-U Project Team member responsible for completion   cargo not ready before           247575.00                                                                  
114     Completion Date Date in PMB for completion (mm/dd/yy)   sumcheck           552235.00                                                                  
115     Shipment Date Date in PMB for shipment (mm/dd/yy)               528436.00                                                                  
116     Weight Pounds (lbs)                                                                                  
117     Dimensions L x W x H (inches) or cubic feet                                                                                  
118     General Assumption All cargo is destined for South Pole                                                                                  
119     Routing Options Port Hueneme>>Christchurch>>McMurdo                                                                                  
120     Transportation Options USAP Vessel, Commercial ship or air carrier (COMSUR or COMAIR), C-17 (CHC-MCM), LC-130 or SPoT (MCM-SPA)                                                                                  
121 Month for Items expected at South Pole Needed on-site date (Nov, Dec, or Jan)                                                                          
122 Work Package Grouping by WPs could be done after the "cargo pipeline" is set by the item's "origin"                                                                                  
123     Basis of Estimate Estimate (expert guess), Preliminary (based on design), Actual (as built)                                                                                  
124                                                                                              
125     FS1 Field season to finishing EHWD refurbishment                                                                                  
126     FS2 Pre-drilling season: staging Drill Camp, firn holes shallow drilling                                                                                  
127     FS3 The season of drilling deep ice holes & deploying DOMs                                                                                  
128                                                                                              
129     DNF Do Not Freeze                                                                                      
130     DNDF Do Not Deep Freeze [min Temperature for storage] - for storage temp > -53C                                                                                    
131                                                                                            
132                                                                                            
133                                                                                          
134 CROSS CHECKS cubic feet lbs Cells will be green if all the cargo is taken into account Delta                                                                                
135 In McMurdo 20,513 205,787                                                                                  
136 At South Pole 733 12,241                                                                                  
137 inter-continental to go 31,985 958,863                                                                                  
138 intra-continental to go 52,498 1,164,650                                                                              
139                                                                                          
140 TOTAL PROJECT CARGO cubic feet lbs Cells will be green if all the cargo is taken into account                                                                                
141 inter-continental 53,231 1,176,891                                                                                
142 intra-continental 53,231 1,176,891                                                                                  
143                                                                                              
144 start end McMurdo label Pole label                                                                                      
145 10/1/2021 9/30/2022 FY22 inter FY22 intra                                                                                      
146 10/1/2022 9/30/2023 FY23 inter FY23 intra                                                                                      
147 11/1/2023 9/30/2024 FY24 inter FY24 intra                                                                                      
148 11/1/2024 9/30/2025 FY25 inter FY25 intra                                                                                      
149 11/1/2025 9/30/2026 FY26 inter FY26 intra                                                                                      
150                                                                                              
151                                                                                              
152                                                                                          
153                                                                                              
154 SPOT DATES USE THESE DATES ONLY FOR SPOT!                                                                                          
155 FY23 SPOT 1 12/1/2022                                                                                          
156 FY23 SPOT 2 1/1/2023                                                                                          
157 FY23 SPOT 3 2/1/2023                                                                                          
158 FY24 SPOT 1 12/1/2023                                                                                          
159 FY24 SPOT 2 1/1/2024                                                                                          
160 FY24 SPOT 3 2/1/2024                                                                                          
161 FY25 SPOT 1 12/1/2024                                                                                          
162 FY25 SPOT 2 1/1/2025                                                                                          
163 FY25 SPOT 3 2/1/2025                                                                                          
164 FY26 SPOT 1 12/1/2025                                                                                          
165 FY26 SPOT 2 1/1/2026                                                                                          
166 FY26 SPoT 3 2/1/2026                                                                                          

Back to top


  B C D E F
1 Item description Special Handling? SHIPMENT FLOAT: Time between completion and
ship-by-date to USAP site
FLOAT AT NPX (delivery to required) [days] Total Time Between Ship-By-Date and Latest Arrival Date at NPX [days]
2 - - - - -
3 - - - - -
4 - - - - -
5 - - - - -
6 Gen 1 - housed in 20' container - In McMurdo 334 -
7 Gen 2 - housed in 20' container - In McMurdo 0 -
8 Gen 3 - housed in 20' container - In McMurdo 334 -
9 Gen Discharge Hoods (bermed) - In McMurdo 376 -
10 Firn Drill - In McMurdo 348 -
11 Weight stack and crates - In McMurdo 1096 -
12 Fuel Tower - In McMurdo 369 -
13 HPU 2 - In McMurdo 350 -
14 8' Refit Container - In McMurdo 348 728
15 20' Refit Container A - In McMurdo 317 728
16 20' Refit Container B - In McMurdo 348 773
17 ARA Trailer FLAMMABLE liquid power engine In McMurdo 371 765
18 Return Water Cable Reel (RWCR) - In McMurdo 367 792
19 Main Cable Reel (MCR) - In McMurdo 367 778
20 Container Ski Stack (comprised of 5 sleds) - In McMurdo 31 716
21 Generator Intake Hood - In McMurdo 376 1113
22 Generator Discharge Hoods - In McMurdo 376 1113
23 Drill Hose DNDF [-53C] In McMurdo 14 1583
24 Drill Hose DNDF [-53C] In McMurdo 14 1430
25 287 Loader - At South Pole at South Pole 1477
26 Firn Drill Components - 1 - At South Pole at South Pole -
27 Firn Drill Components - 2 - At South Pole at South Pole -
28 ARA Drill System Components - Crate #1 DNF 30 16 412
29 Computing/controls components Shipment #1 DNF 14 0 396
30 Computing/controls components Shipment #2 DNF 31 0 106
31 Computing/controls components Shipment #3 DNF 31 0 106
32 20' Refit Container C: Bull Wheel, Spare Combo & Drill Cables, Hose Heating System Components, ARA Drill System Components Crate #2 - 31 418 830
33 Driller resupply/refit components - 8' Container FS2 - 31 0 106
34 Drill refit components FS2 DNF 31 0 106
35 Driller resupply/refit components - 8' Container FS3 - 31 0 106
36 Drill refit components FS3 DNF 31 0 106
37 Drill Heads - X DNF 409 648 1127
38 Drill Heads - Y DNF 409 648 1127
39 Drill Heads - R DNF 409 648 1127
40 Load member cable reel [placeholder, may not be required] - 136 151 595
41 Accelerometer Loggers SPoT 1 - 62 0 91
42 Accelerometer Loggers SPoT 2 - 62 0 122
43 ICL power and timing electronics DNF 462 1 122
44 ICL patch cables and patch panels DNDF [TBD] 624 1 122
45 DOM Handling Facility (DHF) - 50 368 780
46 Installation Hardware 87-93 - 97 321 765
47 Installation Weights 87-93 - 110 321 765
48 Misc. Science Equipment - FS2 (FY25) DNF 50 1 122
49 Misc. Science Equipment - FS3 (FY26) DNF 25 16 122
50 Calibration/Special Devices 87-88 DNDF [-40C] 2 13 149
51 Special Devices 87-88 DNDF [-40C] 2 13 149
52 Special Devices 89-93 DNDF [-40C] 61 15 131
53 Calibration/Special Devices 89-93 DNDF [-40C] 61 15 131
54 Dust logging device DNF 61 15 131
55 Dust logging device DNF 61 15 131
56 Dust logging device DNF 61 15 131
57 Dust logging device DNF 61 15 131
58 Logging winch 0 61 15 131
59 Logging winch control box DNF 61 15 131
60 Surface Junction Boxes - 2 380 792
61 Surface Cable Assemblies DNDF [-55C] 106 14 792
62 Breakout cables for strings 87-88 DNDF[-40C](*) 477 298 421
63 Breakout cables for strings 89-93 DNDF[-40C](*) 379 15 421
64 Main (downhole) load members 87-93 [placeholder, may not be required] DNDF[-40C](*) 563 1 413
65 Main (downhole) cables 87-93 DNDF[-40C](*) 31 1 779
66 String Sensors 89-93 (mDOMs MSU) DNDF [-40C] 686 15 131
67 String Sensors 89-93 (mDOMs MSU) DNDF [-40C] 686 15 131
68 DM-Ice DNDF [-40C] 426 20 126
69 String Sensors 87-88 (mDOMs DESY) DNDF [-40C] 440 13 149
70 String Sensors 87-88 (mDOMs DESY) DNDF [-40C] 440 13 149
71 Special Devices 87-88 (Europe) DNDF [-40C] 578 13 149
72 Calibration Devices 87-88 (Europe) DNDF [-40C] 792 13 149
73 FieldHub electronics DNF 304 1 108
74 String Sensors 89-93 (mDOMs DESY) DNDF [-40C] 721 15 131
75 Special Devices 89-93 (Europe) DNDF [-40C] 578 15 131
76 Calibration Devices 89-93 (Europe) DNDF [-40C] 1157 15 131
77 String Sensors 87 & 88 (D-Eggs-8x) DNDF [-40C] 736 13 149
78 String Sensors 87 & 88 (D-Eggs-8x) DNDF [-40C] 736 13 149
79 String Sensors 87 & 88 (D-Eggs-12x) DNDF [-40C] 736 13 149
80 String Sensors 87 & 88 (D-Eggs-12x) DNDF [-40C] 736 13 149
81 String Sensors 89-93 (D-Eggs-8x) DNDF [-40C] 812 15 131
82 String Sensors 89-93 (D-Eggs-12x) DNDF [-40C] 812 15 131
83
84
85
86
87      
88
89
90
91
92      
93
94
95
96
97      
98
99
100
101
102      
103
104
105
106
107      
108
109
110      
111          
112          
113          
114          
115          
116          
117          
118          
119          
120          
121      
122      
123          
124          
125          
126          
127          
128          
129          
130          
131          
132          
133          
134      
135      
136      
137      
138      
139          
140      
141      
142      
143          
144      
145      
146      
147      
148      
149      
150          
151          
152          
153          
154      

Back to top


  B C D E F G H I J K L M N O P Q R S T U V
1                                          
2 Point of Departure (Point of Origin) volume
[cu ft]
fraction of volume weight
[lbs]
fraction of weight   volume
[cu ft]
fraction of volume weight
[lbs]
fraction of weight
3 cables (SCAs, MCAs, BCAs, SJBs) MSU (MSU) 5,628 13.9% 128,114 24.2%   cables (SCAs, MCAs, BCAs, SJBs) 5,628 13.9% 128,114 24.2%  
4 D-Eggs CHIBA (CHIBA) 2,505 6.2% 27,780 5.3%   mDOMs + D-Eggs 5,261 13.0% 58,149 11.0%  
5 mDOMs DESY (DESY) / MSU (MSU) 2,756 6.8% 30,369 5.7%     calibration + special
+ logging devices
916 2.3% 14,878 2.8%  
6 calibration & special devices UW (various)/
DESY (various)
566 1.4% 9,178 1.7%     DOM Handling Facility 1,280 3.2% 12,000 2.3%  
7 dm-ice YALE (YALE) 64 0.2% 1,500 0.3%     hardware (rigging and weights) 980 2.4% 12,502 2.4%  
8 dust logger UW (UW) 286 0.7% 4,200 0.8%     ICL + science 432 1.1% 5,075 1.0%  
9 DOM Handling Facility UW (UW) 1,280 3.2% 12,000 2.3%     Installation equipment 14,497 35.8% 230,718 43.7%  
10 hardware (rigging and weights) UW (UW) 980 2.4% 12,502 2.4%     Drill equipment 25,984 64.2% 297,708 56.3%  
11 misc science UW (UW) 128 0.3% 3,000 0.6%     Logistics equipment total 2 0.0% 10 0.0%  
12 ICL equipment UW (UW) 304 0.8% 2,075 0.4%     Total 40,483 100.0% 528,436 100.0%  
13 installation equipment total SEE ABOVE 14,497 35.8% 230,718 43.7%   fuel 12,748 648,455  
14 Drill equipment total UW (UW) 25,984 64.2% 297,708 56.3%   total plus fuel 53,231 1,176,891  
15 Logistics equipment total UW (UW) 2 0.0% 10 0.0% Delta?            
16 total 40,483 100.0% 528,436 100.0% 0    
17 fuel 12,748 - 648,455 -   0    
18 total plus fuel 53,231 1,176,891            
19                        
20 Point of Departure (Point of Origin) volume
[cu ft]
fraction of volume weight
[lbs]
fraction of weight            
21 Each String various 1,786 4% 29,920 6%                        
22                                          
23                            
24 volume
[cu ft]
fraction of volume weight
[lbs]
fraction of weight         volume
[cu ft]
fraction of volume weight
[lbs]
fraction of weight  
25 Firn Drill 1,639 4.0% 13,968 2.6%         Firn Drill 1,639 4.0% 13,968 2.6%  
26 Rodwell Drill and System 1,067 2.6% 6,600 1.2%         Rodwell Drill and System 1,067 2.6% 6,600 1.2%  
27 Generators, HPU, fuel tower 9,615 23.8% 100,341 19.0%         Generators, HPU, fuel tower 9,615 23.8% 100,341 19.0%  
28 Drill Hose 4,152 10.3% 46,791 8.9%         Hose, drill heads and weight stack 4,504 11.1% 50,571 9.6%  
29 Reels 1,294 3.2% 25,600 4.8%         Reels 1,294 3.2% 25,600 4.8%  
30 Drill Heads and weight stack 352 0.9% 3,780 0.7%         Refit, spare cable, support equip. 7,865 19.4% 100,628 19.0%  
31 Refit Components 7,377 18.2% 90,355 17.1%         Drill Equipment 25,984 64.2% 297,708 56.3%  
32 Support Equipment 488 1.2% 10,273 1.9%         Installation Equipment 14,497 35.8% 230,718 43.7%  
33 Drill equipment 25,984 64.2% 297,708 56.3%         Logistics Equipment 2 0.0% 10 0.0%  
34 Installation Equipment 14,497 35.8% 230,718 43.7%       Total 40,483 100.0% 528,436 100.0%  
35 Logistics Equipment 2 0.0% 10 0.0%                  
36 Total 40,483 100.0% 528,436 100.0%                    
37                          
38                              
39 volume
[cu ft]
fraction of volume weight
[lbs]
fraction of weight                    
40 Sensors 6,177 15.3% 73,027 13.8%                    
41 Cables & hardware 6,608 16.3% 140,616 26.6%                    
42 DHF 1,280 3.2% 12,000 2.3%                    
43 ICL equipment 432 1.1% 5,075 1.0%                    
44 Firn Drill & ARA drill 2,706 6.7% 20,568 3.9%                                
45 Generators, HPU, fuel tower 9,615 23.8% 100,341 19.0%                                
46 Hose, drill heads, weight stack, reels 5,798 14.3% 76,171 14.4%  
47 Refit components, spare cable, support equipment 7,865 19.4% 100,628 19.0%  
48 Total 40,481 100.0% 528,426 100.0%  
49            
50            
51            
52            
53            
54            
55            
56            
57            
58            
59            
60            
61            
62            
63            
64            
65            
66            
67            
68            
69            
70                                          
71                                          
72 By Point Departure Weight [lbs]   Volume [cuft] Weight [lbs]                      
73 In McMurdo 227,787   Point of Origin same as Point of Departure 40,205 523,493      
74 At South Pole 12,241   Point of Origin different from Point of Departure 278 4,943        
75 UWM - PTH 96,104     40,483 528,436        
76 MSU - PTH 142,439                
77 Yale - PTH 1,500                
78 DESY - CHC 20,585                
79 ChibaU - CHC 27,780                
80 -                  
81 Total 528,436                
82                    
83                                
84                                          
85                                          
86                                          
87                                          
88                                          
89                                          
90                                          
91                                          
92 Cargo (total) by BoE Volume [cuft] Weight [lbs]            
93 actual 28,432 311,308            
94 actual(**) 1,924 21,201            
95 estimated 5,483 74,982            
96 preliminary 4,644 120,945            
97 40,483 528,436            
98                
99 Cargo (total) by BoE Volume [cuft] Weight [lbs]            
100 actual 30,356 332,509            
101 estimated 5,483 74,982            
102 preliminary 4,644 120,945            
103 total 40,483 528,436            
104                  
105                  
106 Installation cargo by BoE Volume [cuft] Weight [lbs]            
107 actual 4,274 46,600            
108 actual(**) 1,924 21,201            
109 estimated 3,655 41,972                                    
110 preliminary 4,644 120,945                                    
111 14,497 230,718                                    
112                                        
113 Installation cargo by BoE Volume [cuft] Weight [lbs]                                    
114 actual 6,198 67,801                                    
115 estimated 3,655 41,972                                    
116 preliminary 4,644 120,945                                    
117 total 14,497 230,718                                    
118                                          
119                                          
120 Drill cargo by BoE Volume [cuft] Weight [lbs]                                  
121 actual 24,158 264,708                                    
122 actual(**) 0 0                                    
123 estimated 1,826 33,000                                    
124 preliminary 0 0                                    
125 25,984 297,708                                    
126                                        
127 Drill cargo by BoE Volume [cuft] Weight [lbs]                                    
128 actual 24,158 264,708                                    
129 estimated 1,826 33,000                                    
130 preliminary 0 0                                    
131 total 25,984 297,708                                    

Back to top


  A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS AT
1 Cargo Item respective WBS Level Work Package Item Description Contents & Comments Length (in) Width (in) Height (in) Quantity Unit Volume (cu ft) Total Volume
(cu ft) = quantity x unit volume
Unit Weight (lbs) Total Weight (lbs) = quantity x unit weight Basis of Estimate Special Handling? Owner/Guardian institution SHIPMENT FLOAT: Time between completion and shipping to USAP site Date of expected or actual completion Date of expected or actual shipment Expected Route: Owner - PTH or CHC Recommended Transportation Option Expected Route: PTH - MCM or CHC Recommended Intercontinental Shipping Date (FY) Recommended Transportation Option to CHC/MCM [INPUT] Expected Route: CHC - MCM [CALCULATED] Vessel Container Allocation 40F Vessel Container Allocation 40D Vessel Container Allocation 20D Vessel Container Allocation 20F C-17/LC-130
CHC --> MCM
Pallet Allocation
Date Item expected or arrived to MCM Recommended Intracontinental Date (FY) Recommended
Intracontinental Mode
MCM--> NPX [CALCULATED]
SPOT Sled Allocation - Swing 1 (11/27) SPOT Sled Allocation - Swing 2 (12/25) SPOT Sled Allocation - Swing 3 (2/5) LC-130
MCM --> NPX
Pallet Allocation
Suggested arrival date at South Pole [INPUT] Latest possible arrival date at South Pole
[from schedule]
FLOAT AT NPX (delivery to required) [days] Total Time Between Shipment and Latest Arrival Date at NPX Critical Path Validator 1
(SME)
Validation Date Validator 2
(Logistics)
Validation Date Notes
2 at South Pole
3 1.2 Drill 287 Loader Required onsite early in FY23 for refit/pre-drill activity support unless ASC can supply dedicated loader for Upgrade use 114 77 96 1 488 488 10,273 10,273 actual - U. Wisc. Madison At South Pole 10/15/2019 11/15/2019 At South Pole Truck At South Pole at South Pole at South Pole at South Pole - - - - - at South Pole at South Pole at South Pole - - - - at South Pole 12/1/2023 at South Pole 1477.00 No* D. Gibson 10/7/2021 I. McEwen 10/7/2021 *Required onsite early in FY23 for refit/pre-drill activity support unless ASC can supply dedicated loader for Upgrade use
4 1.2 Drill Firn Drill Components - 1 Firn drill sheave. Required Field Season 2 for final refit & functional testing 97 44 63 1 156 156 920 920 actual - U. Wisc. Madison At South Pole 1/15/2020 - At South Pole - At South Pole at South Pole at South Pole at South Pole - - - - - at South Pole at South Pole at South Pole - - - - at South Pole 12/1/2024 at South Pole - Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -
5 1.2 Drill Firn Drill Components - 2 Firn drill drillhead. Required Field Season 2 for final refit & functional testing 125 33 37 1 89 89 1,048 1,048 actual - U. Wisc. Madison At South Pole 1/15/2020 - At South Pole - At South Pole at South Pole at South Pole at South Pole - - - - - at South Pole at South Pole at South Pole - - - - at South Pole 12/1/2024 at South Pole - Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -
6  
7  
8  
9  
10  
11 733 12,241
12 Total cu ft Total lbs
13
14
15
16 in McMurdo
17 1.2 Drill Gen 1 - housed in 20' container Power generation unit 1 housed in 20' shipping container 240 96 102 1 1,360 1,360 22,000 22,000 actual - U. Wisc. Madison In McMurdo 2/6/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 12/1/2023 334.00 - Yes D. Gibson 10/6/2021 I. McEwen 10/6/2021 Will require crane for onload/offload - use belly band to support container sidewalls during lift.
18 1.2 Drill Gen 3 - housed in 20' container Power generation unit 3 housed in 20' shipping container 240 96 102 1 1,360 1,360 22,000 22,000 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 12/1/2023 334.00 - Yes D. Gibson 10/6/2021 I. McEwen 10/6/2021 Gens 2 & 3 need to be tranferred from ISO2 sleds that are limited to use on improved surfaces only. Will require crane for onload/offload - use belly band to support container sidewalls during lift.
19 1.2 Drill Gen Discharge Hoods (bermed) Generator air discharge hoods , sheet metal, loose - stored on berm at SPOTSA 108 53 60 2 199 398 330 660 actual - U. Wisc. Madison In McMurdo 12/15/2019 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.25 - - - 12/1/2022 12/12/2023 376.00 - No D. Gibson 10/8/2021 I. McEwen 10/8/2021 Testing/limited operation of Gens can be accomplished without hoods - Hoods required for the drill season
20 1.2 Drill Firn Drill Bermed in McM - will require McM fork or crane support. 264 94 97 1 1,394 1,394 12,000 12,000 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 12/15/2023 348.00 - Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Bermed in McMurdo - SPOTSA
21 1.2 Drill Weight stack and crates Bermed in McM - will require McM fork support. Drill head weight stack and remaining bermed crates at SPoTSA 120 48 48 1 160 160 600 600 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.25 - - - 12/1/2022 12/1/2025 1096.00 - No D. Gibson 10/8/2021 I. McEwen 10/8/2021 Bermed in McMurdo - SPOTSA on UNL flatrack
22 1.2 Drill Fuel Tower Bermed in McM - will require McM fork or crane support. 96 72 120 1 480 480 1,500 1,500 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.25 - - - 12/1/2022 12/5/2023 369.00 - Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Bermed in McMurdo - SPOTSA on UNL flatrack - overland shipment preferred due to complexities of air transport certification - can be laid on side once drained
23 1.2 Drill HPU 2 HPU 2 (University of Nebraska - Lincoln asset) - 40' container housing heating plant on ISO sled 480 96 102 1 2,720 2,720 28,000 28,000 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 3 - - 1.00 - 2/1/2023 1/17/2024 350.00 - Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 HPU 1 integration with Rodwell system required before drill season on it's own sled which will require evaluation and repair - Stored at SPOTSA
24 1.2 Drill 8' Refit Container Priority refit materials including tools, flowmeter assemblies, motor drive installation kits, hardware, fittings, sensors, & consumables 96 86 96 1 459 459 5,000 5,000 actual - U. Wisc. Madison In McMurdo 11/3/2021 11/16/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.25 - - - 12/1/2022 11/14/2023 348.00 728.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 8' container moves with contents by LC130 or is broken down for movement by Basler. Packing in progress.
25 1.2 Drill 20' Refit Container A Refit materials incl. submersible pumps, hardware, filtration components, fall arrest towers, tools, hose crimper and camp hose (2 spools 348 cf/4990 lbs each) 240 96 102 1 1,360 1,360 17,320 17,320 actual - U. Wisc. Madison In McMurdo 11/13/2021 11/16/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 11/14/2023 317.00 728.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 For air shipment container contents will need to be unloaded and palletized. Container procurement delayed by shortage. Packing in progress.
26 1.2 Drill 20' Refit Container B Bulky materials incl. cable trays, vertical turbine pumps, vertical turbine pump motors, ladders, water tank doghouse/railing materials, 287 forks, generator parts, TU20 shaft, & drill weight stack 240 96 102 1 1,360 1,360 14,280 14,280 actual - U. Wisc. Madison In McMurdo 11/2/2021 11/2/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 12/15/2023 348.00 773.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 For air shipment container contents will need to be unloaded and palletized
27 1.2 Drill ARA Trailer Enclosed trailer on skis housing 35kw generator 192 96 88 1 939 939 5,400 5,400 actual FLAMMABLE liquid power engine U. Wisc. Madison In McMurdo 11/2/2021 11/2/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.50 - - - 12/1/2022 12/7/2023 371.00 765.00 Yes* D. Gibson 10/8/2021 I. McEwen 10/8/2021 *If this shipment is delayed 480 volt power generation support will be required in FW YR 1 by the contractor. Aside from the CRREL generator (far larger than required with high fuel burn rate) the capacity does not currently exist at the Pole.
28 1.2 Drill Return Water Cable Reel (RWCR) Smaller reel - can fit in 20' container. Required onsite in FY23 for final integration and pre-drill activites 112 80 80 1 415 415 4,000 4,000 actual - U. Wisc. Madison In McMurdo 10/26/2021 11/2/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.25 - - 1/1/2023 1/3/2024 367.00 792.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Weight from Gen 1 shipment information see picture.
29 1.2 Drill Main Cable Reel (MCR) Required onsite in FY23 for final integration and pre-drill activites. Large cable reel - will require flat rack on vessel 140 96 95 1 739 739 17,800 17,800 actual - U. Wisc. Madison In McMurdo 11/8/2021 11/16/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.25 - - 1/1/2023 1/3/2024 367.00 778.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Required onsite in FS Y1 for final integration and pre-drill activities. Shrink wrap contractor rescheduled for later date.
30 1.2 Drill Container Ski Stack (comprised of 5 sleds) Five sets of aluminum skis for 20' containers - stacked. Aluminum skis for drill containers. Required onsite for local movement of Gens and PDM. 240 96 96 1 1,280 1,280 4,255 4,255 actual - U. Wisc. Madison In McMurdo 12/28/2020 1/15/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.50 - - - 12/1/2022 1/1/2023 31.00 716.00 No* D. Gibson 10/8/2021 I. McEwen 10/8/2021 *While this shipment is not on the critical path additional ASC crane support will be required to overcome delayed arrival or sleds furnished from the South Pole inventory
31 1.2 Drill Generator Intake Hood Light weight large volume sheet metal stacks for generator ventilation 174 53 96 3 513 1,539 587 1,761 actual - U. Wisc. Madison In McMurdo 10/8/2020 11/24/2020 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.50 - - - 12/1/2022 12/12/2023 376.00 1113.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -
32 1.2 Drill Generator Discharge Hoods Light weight large volume sheet metal stacks for generator ventilation 108 53 60 2 199 398 1,210 2,420 actual - U. Wisc. Madison In McMurdo 10/8/2020 11/24/2020 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.50 - - - 12/1/2022 12/12/2023 376.00 1113.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -
33 1.2 Drill Drill Hose Drill hose - 9 Spools - 348 cf / 3532 lbs each - Shipped from Italy - Do Not Deep Freeze 92 92 70 9 346 3,114 3,532 31,788 actual DNDF [-53C] U. Wisc. Madison In McMurdo 7/29/2020 8/15/2020 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY25 intra FY25 SPOT 1 1.80 - - - 12/1/2024 12/15/2024 14.00 1583.00 Yes D. Gibson 10/8/2021 I. McEwen 3/10/2022 Hose to be installed on Main Supply Hose Reel upon arrival at Pole
34 1.2 Drill Drill Hose Drill hose - 3 Spools - 348 cf / 5001 lbs each - Shipped from PSL - Do Not Deep Freeze 92 92 70 3 346 1,038 5,001 15,003 actual DNDF [-53C] U. Wisc. Madison In McMurdo 11/19/2020 1/15/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY25 intra FY25 SPOT 1 0.60 - - - 12/1/2024 12/15/2024 14.00 1430.00 Yes D. Gibson 10/8/2021 I. McEwen 3/10/2022 Hose to be installed on Main Supply Hose Reel upon arrival at Pole
35  
36  
37  
38  
39  
40  
41 20,513 205,787 9.40 5.40 3.00 1.00 0.00
42 Total cu ft Total lbs Sled count SPOT 1 SPOT 2 SPOT 3 463L count
43
44
45                                                  
46
47 FY23 inter
48 1.2 Drill Gen 2 - housed in 20' container Power generation unit 2 housed in 20' shipping container 240 96 102 1 1360 1,360 22,000 22,000 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo FY23 inter FY23 Vessel USAP Vessel - - - - - 2/6/2023 FY24 intra FY24 SPOT 1 0.50 0.00 - - 12/1/2023 12/1/2023 0.00 - Yes I. McEwen 2/24/2022 D.Tosi 2/24/2022 Gens 2 Going back to CHC for repairs
49 1.2 Drill ARA Drill System Components - Crate #1 ARA (Antarctic Rodwell Appartus) - downhole pump controller, ePump controller, splash cam kit, and accessories - Do Not Freeze 96 48 48 1 128 128 1,200 1,200 estimated DNF U. Wisc. Madison 30 9/15/2022 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - - 0.50 0.25 2/6/2023 FY24 intra FY24 LC-130 - - - 0.25 11/15/2023 12/1/2023 16.00 412.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -
50 1.2 Drill Computing/controls components Shipment #1 Components and equipment to support field season 1 controls system tasking). Controls infrastructure - Motor drives, PLCs, electrical hardware, and motor drive mounting kits) - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 14 10/1/2022 10/15/2022 UWM - PTH Truck PTH - CHC FY23 inter FY23 Vessel USAP Vessel - - - - 0.50 2/6/2023 FY24 intra FY24 LC-130 - - - 0.50 11/15/2023 11/15/2023 0.00 396.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Weight estimated
51 1.2 Drill 20' Refit Container C: Bull Wheel, Spare Combo & Drill Cables, Hose Heating System Components, ARA Drill System Components Crate #2 Bull wheel assembly - used to install main cable on reel in event of main cable damage/failure; Spare cable for Return Water Cable Reel - on spool; ARA new downhole pumps, spares, accessories and tools 240 96 102 1 1360 1,360 21,500 21,500 actual - U. Wisc. Madison 31 9/14/2022 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 1.00 - - 2/6/2023 FY24 intra FY24 SPOT 1 0.50 - - - 12/1/2023 1/22/2025 418.00 830.00 Yes I. McEwen 2/24/2022 D. Tosi 2/24/2022 Consolidation: 20 ft container with Bull Wheel, Spare Combo & Drill Cables, Hose Heating System Components, ARA Drill System Components Crate #2
52 1.2 Drill Drill Heads - X Drill Heads for winterover storage - ICL - Do Not Freeze 192 24 24 1 64 64 1,060 1,060 actual DNF U. Wisc. Madison 409 9/1/2021 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 0.25 - - 2/6/2023 FY24 intra FY24 LC-130 - - - 0.30 2/6/2024 11/15/2025 648.00 1127.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 One drill head shipped one year early for ull system wet-test
53 1.2 Drill Drill Heads - Y Drill Heads for winterover storage - ICL - Do Not Freeze 192 24 24 1 64 64 1,060 1,060 actual DNF U. Wisc. Madison 409 9/1/2021 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 0.25 - - 2/6/2023 FY24 intra FY24 LC-130 - - - 0.30 2/6/2024 11/15/2025 648.00 1127.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -
54 1.2 Drill Drill Heads - R Drill Heads for winterover storage - ICL - Do Not Freeze 192 24 24 1 64 64 1,060 1,060 actual DNF U. Wisc. Madison 409 9/1/2021 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 0.25 - - 2/6/2023 FY24 intra FY24 LC-130 - - - 0.30 2/6/2024 11/15/2025 648.00 1127.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -
55 1.2 Logistics Accelerometer Loggers SPoT 1 1x1x1 box 12 12 12 1 1 1 5 5 estimated - U. Wisc. Madison 62 7/1/2022 9/1/2022 UWM - PTH Truck PTH - CHC FY23 inter FY23 ComSur USAP Air - - - - 0.01 10/18/2022 FY23 intra FY23 SPOT 1 - - - 0.01 12/1/2022 12/1/2022 0.00 91.00 Yes I. McEwen 2/28/2022 D. Tosi 2/28/2022 -
56 1.2 Logistics Accelerometer Loggers SPoT 2 1x1x1 box 12 12 12 1 1 1 5 5 estimated - U. Wisc. Madison 62 7/1/2022 9/1/2022 UWM - PTH Truck PTH - CHC FY23 inter FY23 ComSur USAP Air - - - - 0.01 10/18/2022 FY23 intra FY23 SPOT 2 - - - 0.01 1/1/2023 1/1/2023 0.00 122.00 Yes I. McEwen 2/28/2022 D. Tosi 2/28/2022 -
57 1.2 Installation DOM Handling Facility (DHF) Standard vessel shipping - can overwinter in McM. 240 96 96 1 1280 1,280 12,000 12,000 estimated - U. Wisc. Madison 50 8/26/2022 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 1.00 - - 2/6/2023 FY24 intra FY24 SPOT 1 0.50 - - - 12/1/2023 12/3/2024 368.00 780.00 Yes D. Gibson 10/8/2021 I. McEwen 4/11/2022 Sensor Handling Facility construction scheduled to begin mid-December FY24
58 1.4 Installation Surface Junction Boxes Surface Junction Boxes can overwinter in McM if shipped earlier. 7 junction boxes 66 30 14 7 17 119 200 1,400 preliminary - MSU 2 10/13/2022 10/15/2022 MSU - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 1.00 - - 2/6/2023 FY24 intra FY24 SPOT 1 0.50 - - - 12/1/2023 12/15/2024 380.00 792.00 Yes T. DeYoung 10/13/2021 D. Tosi 4/11/2022 Each is 66" x 30" x 14", each is 112 lbs. Assume Folding crate. Simple passive objects, work plan can probably be shifted to increase float.
59 1.4 Installation Surface Cable Assemblies Palletized wooden cable drums (Qty: 7). Can overwinter in MCM. Do Not Deep Freeze 48 65 71 7 129 903 1,336 9,352 actual DNDF [-55C] MSU 106 7/1/2022 10/15/2022 MSU - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 2.00 - - 2/6/2023 FY25 intra FY25 SPOT 1 0.50 - - - 12/1/2024 12/15/2024 14.00 792.00 Yes T. DeYoung 10/13/2021 D. Tosi 4/11/2022 Shipping date early due to storage limitations at MSU. Additional float at Port Hueneme assuming USAP vessel departure.
60 1.2 Fuel Field Season 0 Fuel Fuel to support following field seasons 0 0 0 0 0 0 7 0 preliminary - - - - - - - - FY23 inter - - - - - - 0.00 11/1/2022 FY23 intra FY23 LC-Tanker - - - 0.00 12/1/2022 12/1/2023 365.00 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -
61          
62          
63          
64 5472.00 73642.00 6.25 0.00 0.00 5.75 0.50 0.77
65 Total cu ft Total lbs TEU count 40F 40D 20D 20F 463L count
66    
67    
68                                              
69                                                
70
71 FY23 intra
72 1.2 Drill Gen 1 - housed in 20' container Power generation unit 1 housed in 20' shipping container 240 96 102 1 1360 1,360 22,000 22,000 actual - U. Wisc. Madison In McMurdo 2/6/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 12/1/2023 334.00 - Yes D. Gibson 10/6/2021 I. McEwen 10/6/2021 Will require crane for onload/offload - use belly band to support container sidewalls during lift.
73 1.2 Drill Gen 3 - housed in 20' container Power generation unit 3 housed in 20' shipping container 240 96 102 1 1360 1,360 22,000 22,000 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 12/1/2023 334.00 - Yes D. Gibson 10/6/2021 I. McEwen 10/6/2021 Gens 2 & 3 need to be tranferred from ISO2 sleds that are limited to use on improved surfaces only. Will require crane for onload/offload - use belly band to support container sidewalls during lift.
74 1.2 Drill Gen Discharge Hoods (bermed) Generator air discharge hoods , sheet metal, loose - stored on berm at SPOTSA 108 53 60 2 199 398 330 660 actual - U. Wisc. Madison In McMurdo 12/15/2019 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.25 - - - 12/1/2022 12/12/2023 376.00 - No D. Gibson 10/8/2021 I. McEwen 10/8/2021 Testing/limited operation of Gens can be accomplished without hoods - Hoods required for the drill season
75 1.2 Drill Firn Drill Bermed in McM - will require McM fork or crane support. 264 94 97 1 1394 1,394 12,000 12,000 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 12/15/2023 348.00 - Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Bermed in McMurdo - SPOTSA
76 1.2 Drill Weight stack and crates Bermed in McM - will require McM fork support. Drill head weight stack and remaining bermed crates at SPoTSA 120 48 48 1 160 160 600 600 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.25 - - - 12/1/2022 12/1/2025 1096.00 - No D. Gibson 10/8/2021 I. McEwen 10/8/2021 Bermed in McMurdo - SPOTSA on UNL flatrack
77 1.2 Drill Fuel Tower Bermed in McM - will require McM fork or crane support. 96 72 120 1 480 480 1,500 1,500 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.25 - - - 12/1/2022 12/5/2023 369.00 - Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Bermed in McMurdo - SPOTSA on UNL flatrack - overland shipment preferred due to complexities of air transport certification - can be laid on side once drained
78 1.2 Drill HPU 2 HPU 2 (University of Nebraska - Lincoln asset) - 40' container housing heating plant on ISO sled 480 96 102 1 2720 2,720 28,000 28,000 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 3 - - 1.00 - 2/1/2023 1/17/2024 350.00 - Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 HPU 1 integration with Rodwell system required before drill season on it's own sled which will require evaluation and repair - Stored at SPOTSA
79 1.2 Drill 8' Refit Container Priority refit materials including tools, flowmeter assemblies, motor drive installation kits, hardware, fittings, sensors, & consumables 96 86 96 1 459 459 5,000 5,000 actual - U. Wisc. Madison In McMurdo 11/3/2021 11/16/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.25 - - - 12/1/2022 11/14/2023 348.00 728.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 8' container moves with contents by LC130 or is broken down for movement by Basler. Packing in progress.
80 1.2 Drill 20' Refit Container A Refit materials incl. submersible pumps, hardware, filtration components, fall arrest towers, tools, hose crimper and camp hose (2 spools 348 cf/4990 lbs each) 240 96 102 1 1360 1,360 17,320 17,320 actual - U. Wisc. Madison In McMurdo 11/13/2021 11/16/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 11/14/2023 317.00 728.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 For air shipment container contents will need to be unloaded and palletized. Container procurement delayed by shortage. Packing in progress.
81 1.2 Drill 20' Refit Container B Bulky materials incl. cable trays, vertical turbine pumps, vertical turbine pump motors, ladders, water tank doghouse/railing materials, 287 forks, generator parts, TU20 shaft, & drill weight stack 240 96 102 1 1360 1,360 14,280 14,280 actual - U. Wisc. Madison In McMurdo 11/2/2021 11/2/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.50 - - 1/1/2023 12/15/2023 348.00 773.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 For air shipment container contents will need to be unloaded and palletized
82 1.2 Drill ARA Trailer Enclosed trailer on skis housing 35kw generator 192 96 88 1 939 939 5,400 5,400 actual FLAMMABLE liquid power engine U. Wisc. Madison In McMurdo 11/2/2021 11/2/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.50 - - - 12/1/2022 12/7/2023 371.00 765.00 Yes* D. Gibson 10/8/2021 I. McEwen 10/8/2021 *If this shipment is delayed 480 volt power generation support will be required in FW YR 1 by the contractor. Aside from the CRREL generator (far larger than required with high fuel burn rate) the capacity does not currently exist at the Pole.
83 1.2 Drill Return Water Cable Reel (RWCR) Smaller reel - can fit in 20' container. Required onsite in FY23 for final integration and pre-drill activites 112 80 80 1 415 415 4,000 4,000 actual - U. Wisc. Madison In McMurdo 10/26/2021 11/2/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.25 - - 1/1/2023 1/3/2024 367.00 792.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Weight from Gen 1 shipment information see picture.
84 1.2 Drill Main Cable Reel (MCR) Required onsite in FY23 for final integration and pre-drill activites. Large cable reel - will require flat rack on vessel 140 96 95 1 739 739 17,800 17,800 actual - U. Wisc. Madison In McMurdo 11/8/2021 11/16/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 2 - 0.25 - - 1/1/2023 1/3/2024 367.00 778.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Required onsite in FS Y1 for final integration and pre-drill activities. Shrink wrap contractor rescheduled for later date.
85 1.2 Drill Container Ski Stack (comprised of 5 sleds) Five sets of aluminum skis for 20' containers - stacked. Aluminum skis for drill containers. Required onsite for local movement of Gens and PDM. 240 96 96 1 1280 1,280 4,255 4,255 actual - U. Wisc. Madison In McMurdo 12/28/2020 1/15/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.50 - - - 12/1/2022 1/1/2023 31.00 716.00 No* D. Gibson 10/8/2021 I. McEwen 10/8/2021 *While this shipment is not on the critical path additional ASC crane support will be required to overcome delayed arrival or sleds furnished from the South Pole inventory
86 1.2 Drill Generator Intake Hood Light weight large volume sheet metal stacks for generator ventilation 174 53 96 3 513 1,539 587 1,761 actual - U. Wisc. Madison In McMurdo 10/8/2020 11/24/2020 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.50 - - - 12/1/2022 12/12/2023 376.00 1113.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -
87 1.2 Drill Generator Discharge Hoods Light weight large volume sheet metal stacks for generator ventilation 108 53 60 2 199 398 1,210 2,420 actual - U. Wisc. Madison In McMurdo 10/8/2020 11/24/2020 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY23 intra FY23 SPOT 1 0.50 - - - 12/1/2022 12/12/2023 376.00 1113.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -
88 1.2 Logistics Accelerometer Loggers SPoT 1 1x1x1 box 12 12 12 1 1 1 5 5 estimated - U. Wisc. Madison 62 7/1/2022 9/1/2022 UWM - PTH Truck PTH - CHC FY23 inter FY23 ComSur USAP Air - - - - 0.01 10/18/2022 FY23 intra FY23 SPOT 1 - - - 0.01 12/1/2022 12/1/2022 0.00 91.00 Yes I. McEwen 2/28/2022 D. Tosi 2/28/2022 -
89 1.2 Logistics Accelerometer Loggers SPoT 2 1x1x1 box 12 12 12 1 1 1 5 5 estimated - U. Wisc. Madison 62 7/1/2022 9/1/2022 UWM - PTH Truck PTH - CHC FY23 inter FY23 ComSur USAP Air - - - - 0.01 10/18/2022 FY23 intra FY23 SPOT 2 - - - 0.01 1/1/2023 1/1/2023 0.00 122.00 Yes I. McEwen 2/28/2022 D. Tosi 2/28/2022 -
90 1.2 Fuel Field Season 0 Fuel Fuel to support following field seasons 0 0 0 0 0 0 7 0 preliminary - - - - - - - - FY23 inter - - - - - - 0.00 11/1/2022 FY23 intra FY23 LC-Tanker - - - 0.00 12/1/2022 12/1/2023 365.00 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -
91          
92          
93          
94 16363.00 159006.00 7.00 3.00 3.00 1.00 0.02
95 Total cu ft Total lbs Sled count SPOT 1 SPOT 2 SPOT 3 463L count
96
97
98                                                    
99
100 FY24 inter
101 1.2 Drill Computing/controls components Shipment #2 Computing and controls equipment (Motor drives and other sensitive electronics) - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 31 7/1/2023 8/1/2023 UWM - PTH Truck PTH - CHC FY24 inter FY24 ComSur USAP Air - - - - 0.50 11/1/2023 FY24 intra FY24 LC-130 - - - 0.50 11/15/2023 11/15/2023 0.00 106.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Required onsite in FW YR 2 to support controls system tasking
102 1.2 Drill Load member cable reel [placeholder, may not be required] Cable Reel used to deploy downhole load member during string installation 84 60 48 1 140 140 3,800 3,800 estimated - U. Wisc. Madison 136 6/1/2023 10/15/2023 UWM - PTH Truck PTH - MCM FY24 inter FY24 Vessel USAP Vessel - - - 0.25 - 2/6/2024 FY25 intra FY25 SPOT 2 - 0.25 - - 1/1/2025 6/1/2025 151.00 595.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Required onsite in FW YR 2 for integration - recent addition, still in development
103 1.2 Installation Installation Hardware 87-93 Installation hardware 96 48 48 7 128 896 1,000 7,000 estimated - U. Wisc. Madison 97 7/10/2023 10/15/2023 UWM - PTH Truck PTH - MCM FY24 inter FY24 Vessel USAP Vessel - - 2.00 - - 2/6/2024 FY25 intra FY25 SPOT 2 - 0.10 - - 1/1/2025 11/18/2025 321.00 765.00 Yes D. Tosi 9/22/2021 I. McEwen 9/22/2021 -
104 1.2 Installation Installation Weights 87-93 Installation weights 36 24 24 7 12 84 786 5,502 estimated - U. Wisc. Madison 110 6/27/2023 10/15/2023 UWM - PTH Truck PTH - MCM FY24 inter FY24 Vessel USAP Vessel - - 1.00 - - 2/6/2024 FY25 intra FY25 SPOT 2 - 0.10 - - 1/1/2025 11/18/2025 321.00 765.00 Yes D. Tosi 9/22/2021 I. McEwen 9/22/2021 -
105 1.4 Installation Main (downhole) cables 87-93 May be possible to store in McMurdo until drill season - Do Not Deep Freeze 96 96 96 7 512 3,584 15,000 105,000 preliminary DNDF[-40C](*) MSU 31 9/14/2023 10/15/2023 MSU - PTH Truck PTH - MCM FY24 inter FY24 Vessel USAP Vessel - - 2.00 - - 2/6/2025 FY26 intra FY26 SPOT 1 1.50 - - - 12/1/2025 12/2/2025 1.00 779.00 Yes T. DeYoung 9/20/2021 D. Tosi 4/11/2022 Shipping date chosen to be 2 weeks after scheduled ready to ship date because of storage limitations at MSU. additional 7 months of float at Port Hueneme assuming USAP vessel departure. (*) storage in McMurdo pending low temperature test.
106 1.2 Fuel Field Season 1 Fuel Fuel to support FY23 field season - Base fuel 0 0 0 3,191 0 427 7 21,699 preliminary - - - - - - - - FY24 inter - - - - - - 0.00 11/1/2023 FY24 intra FY24 LC-Tanker - - - 0.00 12/1/2023 12/1/2023 0.00 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -
107 1.2 Fuel Field Season 1 Fuel Contingency Fuel to support FY23 field season - Contingency 0 0 0 452 0 60 7 3,074 preliminary - - - - - - - - FY24 inter - - - - - - 0.00 11/1/2023 FY24 intra FY24 LC-Tanker - - - 0.00 12/1/2023 12/1/2023 0.00 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -
108          
109          
110          
111          
112 5319.01 149074.40 5.25 0.00 0.00 5.00 0.25 0.50
113 Total cu ft Total lbs TEU count 40F 40D 20D 20F 463L count
114
115                                              
116                                                
117
118 FY24 intra
119 1.2 Drill Gen 2 - housed in 20' container Power generation unit 2 housed in 20' shipping container 240 96 102 1 1360 1,360 22,000 22,000 actual - U. Wisc. Madison In McMurdo 1/15/2020 - In McMurdo - In McMurdo FY23 inter FY23 Vessel USAP Vessel - - - - - 2/6/2023 FY24 intra FY24 SPOT 1 0.50 0.00 - - 12/1/2023 12/1/2023 0.00 - Yes I. McEwen 2/24/2022 D.Tosi 2/24/2022 Gens 2 Going back to CHC for repairs
120 1.2 Drill ARA Drill System Components - Crate #1 ARA (Antarctic Rodwell Appartus) - downhole pump controller, ePump controller, splash cam kit, and accessories - Do Not Freeze 96 48 48 1 128 128 1,200 1,200 estimated DNF U. Wisc. Madison 30 9/15/2022 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - - 0.50 0.25 2/6/2023 FY24 intra FY24 LC-130 - - - 0.25 11/15/2023 12/1/2023 16.00 412.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -
121 1.2 Drill Computing/controls components Shipment #1 Components and equipment to support field season 1 controls system tasking). Controls infrastructure - Motor drives, PLCs, electrical hardware, and motor drive mounting kits) - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 14 10/1/2022 10/15/2022 UWM - PTH Truck PTH - CHC FY23 inter FY23 Vessel USAP Vessel - - - - 0.50 2/6/2023 FY24 intra FY24 LC-130 - - - 0.50 11/15/2023 11/15/2023 0.00 396.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Weight estimated
122 1.2 Drill Computing/controls components Shipment #2 Computing and controls equipment (Motor drives and other sensitive electronics) - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 31 7/1/2023 8/1/2023 UWM - PTH Truck PTH - CHC FY24 inter FY24 ComSur USAP Air - - - - 0.50 11/1/2023 FY24 intra FY24 LC-130 - - - 0.50 11/15/2023 11/15/2023 0.00 106.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Required onsite in FW YR 2 to support controls system tasking
123 1.2 Drill 20' Refit Container C: Bull Wheel, Spare Combo & Drill Cables, Hose Heating System Components, ARA Drill System Components Crate #2 Bull wheel assembly - used to install main cable on reel in event of main cable damage/failure; Spare cable for Return Water Cable Reel - on spool; ARA new downhole pumps, spares, accessories and tools 240 96 102 1 1360 1,360 21,500 21,500 actual - U. Wisc. Madison 31 9/14/2022 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 1.00 - - 2/6/2023 FY24 intra FY24 SPOT 1 0.50 - - - 12/1/2023 1/22/2025 418.00 830.00 Yes I. McEwen 2/24/2022 D. Tosi 2/24/2022 Consolidation: 20 ft container with Bull Wheel, Spare Combo & Drill Cables, Hose Heating System Components, ARA Drill System Components Crate #2
124 1.2 Drill Drill Heads - X Drill Heads for winterover storage - ICL - Do Not Freeze 192 24 24 1 64 64 1,060 1,060 actual DNF U. Wisc. Madison 409 9/1/2021 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 0.25 - - 2/6/2023 FY24 intra FY24 LC-130 - - - 0.30 2/6/2024 11/15/2025 648.00 1127.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 One drill head shipped one year early for ull system wet-test
125 1.2 Drill Drill Heads - Y Drill Heads for winterover storage - ICL - Do Not Freeze 192 24 24 1 64 64 1,060 1,060 actual DNF U. Wisc. Madison 409 9/1/2021 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 0.25 - - 2/6/2023 FY24 intra FY24 LC-130 - - - 0.30 2/6/2024 11/15/2025 648.00 1127.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -
126 1.2 Drill Drill Heads - R Drill Heads for winterover storage - ICL - Do Not Freeze 192 24 24 1 64 64 1,060 1,060 actual DNF U. Wisc. Madison 409 9/1/2021 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 0.25 - - 2/6/2023 FY24 intra FY24 LC-130 - - - 0.30 2/6/2024 11/15/2025 648.00 1127.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -
127 1.2 Installation DOM Handling Facility (DHF) Standard vessel shipping - can overwinter in McM. 240 96 96 1 1280 1,280 12,000 12,000 estimated - U. Wisc. Madison 50 8/26/2022 10/15/2022 UWM - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 1.00 - - 2/6/2023 FY24 intra FY24 SPOT 1 0.50 - - - 12/1/2023 12/3/2024 368.00 780.00 Yes D. Gibson 10/8/2021 I. McEwen 4/11/2022 Sensor Handling Facility construction scheduled to begin mid-December FY24
128 1.4 Installation Surface Junction Boxes Surface Junction Boxes can overwinter in McM if shipped earlier. 7 junction boxes 66 30 14 7 17 119 200 1,400 preliminary - MSU 2 10/13/2022 10/15/2022 MSU - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 1.00 - - 2/6/2023 FY24 intra FY24 SPOT 1 0.50 - - - 12/1/2023 12/15/2024 380.00 792.00 Yes T. DeYoung 10/13/2021 D. Tosi 4/11/2022 Each is 66" x 30" x 14", each is 112 lbs. Assume Folding crate. Simple passive objects, work plan can probably be shifted to increase float.
129 1.2 Fuel Field Season 1 Fuel Fuel to support FY23 field season - Base fuel 0 0 0 3,191 0 427 7 21,699 preliminary - - - - - - - - FY24 inter - - - - - - 0.00 11/1/2023 FY24 intra FY24 LC-Tanker - - - 0.00 12/1/2023 12/1/2023 0.00 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -
130 1.2 Fuel Field Season 1 Fuel Contingency Fuel to support FY23 field season - Contingency 0 0 0 452 0 60 7 3,074 preliminary - - - - - - - - FY24 inter - - - - - - 0.00 11/1/2023 FY24 intra FY24 LC-Tanker - - - 0.00 12/1/2023 12/1/2023 0.00 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -
131          
132          
133          
134          
135 5182.01 92052.40 2.00 2.00 0.00 0.00 2.15
136 Total cu ft Total lbs Sled count SPOT 1 SPOT 2 SPOT 3 463L count
137    
138    
139                                                
140
141 FY25 inter
142 1.2 Drill Computing/controls components Shipment #3 Computing and controls equipment (Sensor, motor drives and other sensitive electronics) - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 31 7/1/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.50 11/1/2024 FY25 intra FY25 LC-130 - - - 0.50 11/15/2024 11/15/2024 0.00 106.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -
143 1.2 Drill Driller resupply/refit components - 8' Container FS2 8' Mini Milvan; Consumables/drill components 96 86 96 1 459 459 6,500 6,500 estimated - U. Wisc. Madison 31 7/1/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 1.00 11/1/2024 FY25 intra FY25 LC-130 - - - 1.00 11/15/2024 11/15/2024 0.00 106.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Items identifed in prior field season - 8' container moves with contents overland or by air
144 1.2 Drill Drill refit components FS2 Single crate. Consumables/drill refit components - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 31 7/1/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 Comsur USAP Air - - - - 0.50 11/1/2024 FY25 intra FY25 LC-130 - - - 0.50 11/15/2024 11/15/2024 0.00 106.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Items identifed in prior field season
145 1.4 Installation ICL power and timing electronics 1 crate containing rackmount electronics for power and timing systems - Do Not Freeze 96 48 48 1 128 128 600 600 estimated DNF U. Wisc. Madison 462 4/27/2023 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 11/30/2024 12/1/2024 1.00 122.00 Yes J. Kelley 10/12/2021 D. Tosi 4/11/2022 -
146 1.4 Installation ICL patch cables and patch panels Standard vessel shipping - can overwinter in McM if shipped earlier - Do Not Deep Freeze 96 48 48 1 128 128 1,200 1,200 estimated DNDF [TBD] U. Wisc. Madison 624 11/16/2022 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 11/30/2024 12/1/2024 1.00 122.00 Yes J. Kelley 10/12/2021 D. Tosi 4/11/2022 (*) storage in McMurdo pending low temperature test
147 1.2 Installation Misc. Science Equipment - FS2 (FY25) Scientific and test equipment (SPAT, DCM, IME, Paros et al.) - Do Not Freeze 48 48 48 1 64 64 1,500 1,500 estimated DNF U. Wisc. Madison 50 6/12/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 11/30/2024 12/1/2024 1.00 122.00 Yes T. Karg 10/8/2021 D. Tosi 10/8/2021 -
148 1.5 Installation Calibration/Special Devices 87-88 3+1 PencilBeams from UW, 2+1 pDOM and 1+1 LOMs - Do Not Deep Freeze 58 38 41 1 53 53 836 836 estimated DNDF [-40C] U. Wisc. Madison 2 7/30/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13.00 149.00 Yes D. Williams 10/13/2021 D. Tosi 10/13/2021 -
149 1.3 Installation Special Devices 87-88 Special devices for 2 strings from UW (4+1 Radio Pulsers (all strings) 1+1 Radio Receivers, 3+1 FOM) - Do Not Deep Freeze 63 40 42 1 62 62 677 677 preliminary DNDF [-40C] UWM/Kansas 2 7/30/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13.00 149.00 Yes S. Boeser 10/13/2021 D. Tosi 10/13/2021 4+1 Radio Pulser, weight 50 kg. 1+1 Radio receiver, assume mDOM weight, 3+1 FOM (assume mDOM weight) + 2ftx2ftx4ft FOM box (50 lbs). Special Devices from UW. FTS, seismometer missing from estimate. 250 lbs crate estimate
150 1.4 Installation Breakout cables for strings 87-88 Standard vessel shipping. 2 wooden crates containing spooled breakout cable assemblies - 96 cf / 1,000 lbs each - Cryo storage - Do Not Deep Freeze 72 48 48 2 96 192 1,000 2,000 estimated DNDF[-40C](*) MSU 477 6/26/2023 10/15/2024 MSU - PTH Truck PTH - MCM FY25 inter FY25 Vessel USAP Vessel - 0.25 - - - 2/6/2025 FY25 intra FY25 LC-130 - - - 0.50 2/15/2025 12/10/2025 298.00 421.00 Yes T. DeYoung 9/20/2021 D. Tosi 4/11/2022 Shipping date early due to storage limitations at MSU. Additional float at Port Hueneme assuming USAP vessel departure. Preliminary estimate of weight and size. Pre-staging string 87-88 equipment in cryo or ICL. - if storage at Pole not possible, could overwinter in McM (at an increased risk and pending low temperature test) (*)
151 1.4 Installation Breakout cables for strings 89-93 Stored in McMurdo FY24. 5 wooden crates containing spooled breakout cable assemblies - 96 cf/ 1,000 lbs each (preliminary) - Do Not Deep Freeze 72 48 48 5 96 480 1,000 5,000 estimated DNDF[-40C](*) MSU 379 10/2/2023 10/15/2024 MSU - PTH Truck PTH - MCM FY25 inter FY25 Vessel USAP Vessel - - 2.00 - - 2/6/2025 FY26 intra FY26 LC-130 - - - 1.00 11/25/2025 12/10/2025 15.00 421.00 Yes T. DeYoung 9/20/2021 D. Tosi 4/11/2022 Float in PTH due to storage limitation in MSU.
(*) storage in McMurdo pending low temperature test
152 1.4 Installation Main (downhole) load members 87-93 [placeholder, may not be required] May be possible to store in McMurdo until drill season - Do Not Deep Freeze 47 47 39 7 50 350 766 5,362 preliminary DNDF[-40C](*) MSU 563 4/1/2023 10/15/2024 MSU - PTH Truck PTH - MCM FY25 inter FY25 Vessel USAP Vessel - - 1.00 - - 2/6/2025 FY26 intra FY26 SPOT 1 1.00 - - - 12/1/2025 12/2/2025 1.00 413.00 Yes T. DeYoung 9/20/2021 D. Tosi 10/11/2021 Shipping date synched with main (downhole) cables due to storage limitation in MSU. Float in PTH.
153 1.3 Installation String Sensors 87-88 (mDOMs DESY) Optical sensors for 2 strings from Germany (mDOMs) (spares included) - Do Not Deep Freeze 40 48 46 16 52 832 573 9,168 actual DNDF [-40C] DESY 440 5/19/2023 8/1/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 2.00 11/1/2024 FY25 intra FY25 LC-130 - - - 2.00 12/15/2024 12/28/2024 13.00 149.00 Yes T. Karg 9/20/2021 D. Tosi 9/22/2021 mDOM weight is 62 lbs (25kg/sensor + 3 kg/box) + 35kg pallet, assume 8 mDOMs/pallet - 116 to be deployed + 12 spares -
shipped in 20 HC container. Container weight not included in the assumption that pallet will be taken out in CHC.
154 1.3 Installation String Sensors 87-88 (mDOMs DESY) Optical sensors for 2 strings from Germany (mDOMs) (SPARES) - Do Not Deep Freeze 40 48 46 0 52 0 573 0 actual DNDF [-40C] DESY 440 5/19/2023 8/1/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13.00 149.00 Yes T. Karg 9/20/2021 D. Tosi 9/22/2021 mDOM weight is 62 lbs (25kg/sensor + 3 kg/box) + 35kg pallet, assume 8 mDOMs/pallet - shipped in 20 HC container. Container weight not included in the assumption that pallet will be taken out in CHC.
155 1.3 Installation Special Devices 87-88 (Europe) Special devices for 2 strings from DESY/Germany/Sweden (8 WOMs, 0 Abalone) + spares - Do Not Deep Freeze 40 21 64 1 32 32 701 701 estimated DNDF [-40C] Mainz 578 1/1/2023 8/1/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13.00 149.00 Yes S. Boeser 10/13/2021 D. Tosi 10/13/2021 8 WOMs (no spares) - AH not included for now. Assume 150 lbs crate.
156 1.5 Installation Calibration Devices 87-88 (Europe) Calibration devices for 2 strings from DESY/Germany/Sweden (4+2 POCAMs, 3+1 Acoustic sensors, 2+1 Swedish Cameras) - Do Not Deep Freeze 62 38 41 1 56 56 836 836 estimated DNDF [-40C] TUM/Aachen/Sweden 792 6/1/2022 8/1/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13.00 149.00 Yes D. Williams 10/13/2021 D. Tosi 10/13/2021 Calibration devices for strings 87-88 = 2+1 Sweden Camera + 3+1 Acoustic Module + 4+1 POCAM, including spares, 200 lbs crate
157 1.4 Installation FieldHub electronics Required onsite for FY24 installation. 1 crate containing readout electronics for installation in ICL - Do Not Freeze 48 48 36 1 48 48 275 275 preliminary DNF DESY 304 10/16/2023 8/15/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 11/30/2024 12/1/2024 1.00 108.00 No J. Kelley 10/13/2021 D. Tosi 4/11/2022 Field Hubs are 442mm x 480mm x 133 mm (17.4" x 18.9" x 5.2") and weight maybe 10 lb each. 100 lbs crate. Ready to ship date actually chosen to be 2 weeks ahead of ship date to maximize time with the electronics (sort of backloaded)
158 1.3 Installation String Sensors 87 & 88 (D-Eggs-8x) Sensors (D-Eggs) pallets with 8 sensors at Pole overwinter - Cryo location - Do Not Deep Freeze 41 41 69 4 68 272 750 3,000 actual DNDF [-40C] Chiba 736 7/27/2022 8/1/2024 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY25 inter FY25 ComSur USAP Air - - - - 1.00 11/1/2024 FY25 intra FY25 LC-130 - - - 1.00 12/15/2024 12/28/2024 13.00 149.00 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 Box size is 480x480x770mm (19"x19"x30.5"). 2x12-DEgg pallets combined with 2x8-DEgg pallets to form one 463L pallet
159 1.3 Installation String Sensors 87 & 88 (D-Eggs-8x) Sensors (D-Eggs) pallets with 8 sensors at Pole overwinter (SPARES - TBD) - Cryo location - Do Not Deep Freeze 41 41 69 1 68 68 750 750 actual DNDF [-40C] Chiba 736 7/27/2022 8/1/2024 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13.00 149.00 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 SPARES number to be confirmed.
160 1.3 Installation String Sensors 87 & 88 (D-Eggs-12x) Sensors (D-Eggs) pallets with 12 sensors at Pole overwinter - Cryo location - Do Not Deep Freeze 60 41 69 4 99 396 1,102 4,408 actual DNDF [-40C] Chiba 736 7/27/2022 8/1/2024 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY25 inter FY25 ComSur USAP Air - - - - 1.00 11/1/2024 FY25 intra FY25 LC-130 - - - 1.00 12/15/2024 12/28/2024 13.00 149.00 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 2x12-DEgg pallets combined with 2x8-DEgg pallets to form one 463L pallet
161 1.3 Installation String Sensors 87 & 88 (D-Eggs-12x) Sensors (D-Eggs) pallets with 12 sensors at Pole overwinter (SPARES - TBD)- Cryo location - Do Not Deep Freeze 60 41 69 1 99 99 1,102 1,102 actual DNDF [-40C] Chiba 736 7/27/2022 8/1/2024 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13.00 149.00 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 SPARES number to be confirmed.
162 1.2 Fuel Field Season 2 Fuel Fuel to support FY24 field season - Base fuel, firn drilling & over winter heating 0 0 0 18,178 0 2,430 7 123,610 preliminary - - - - - - - - FY25 inter - - - - - - 0.00 11/1/2024 FY25 intra FY25 LC-Tanker - - - 0.00 12/1/2024 12/1/2024 0.00 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -
163 1.2 Fuel Field Season 2 Fuel Contingency Fuel to support FY24 field season - Contingency 0 0 0 2,373 0 317 7 16,136 preliminary - - - - - - - - FY25 inter - - - - - - 0.00 11/1/2024 FY25 intra FY25 LC-Tanker - - - 0.00 12/1/2024 12/1/2024 0.00 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -
164          
165          
166          
167          
168          
169          
170 6722.28 189661.8 3.50 0.00 0.25 3.00 0.00 8.75  
171 Total cu ft Total lbs TEU count 40F 40D 20D 20F 463L count  
172  
173  
174                                        
175
176 FY25 intra
177 1.2 Drill Drill Hose Drill hose - 9 Spools - 348 cf / 3532 lbs each - Shipped from Italy - Do Not Deep Freeze 92 92 70 9 346 3,114 3,532 31,788 actual DNDF [-53C] U. Wisc. Madison In McMurdo 7/29/2020 8/15/2020 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY25 intra FY25 SPOT 1 1.80 - - - 12/1/2024 12/15/2024 14.00 1583.00 Yes D. Gibson 10/8/2021 I. McEwen 3/10/2022 Hose to be installed on Main Supply Hose Reel upon arrival at Pole
178 1.2 Drill Drill Hose Drill hose - 3 Spools - 348 cf / 5001 lbs each - Shipped from PSL - Do Not Deep Freeze 92 92 70 3 346 1,038 5,001 15,003 actual DNDF [-53C] U. Wisc. Madison In McMurdo 11/19/2020 1/15/2021 In McMurdo Truck In McMurdo In McMurdo in McMurdo in McMurdo - - - - - In McMurdo FY25 intra FY25 SPOT 1 0.60 - - - 12/1/2024 12/15/2024 14.00 1430.00 Yes D. Gibson 10/8/2021 I. McEwen 3/10/2022 Hose to be installed on Main Supply Hose Reel upon arrival at Pole
179 1.2 Drill Computing/controls components Shipment #3 Computing and controls equipment (Sensor, motor drives and other sensitive electronics) - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 31 7/1/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.50 11/1/2024 FY25 intra FY25 LC-130 - - - 0.50 11/15/2024 11/15/2024 0.00 106.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 -
180 1.2 Drill Driller resupply/refit components - 8' Container FS2 8' Mini Milvan; Consumables/drill components 96 86 96 1 459 459 6,500 6,500 estimated - U. Wisc. Madison 31 7/1/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 1.00 11/1/2024 FY25 intra FY25 LC-130 - - - 1.00 11/15/2024 11/15/2024 0.00 106.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Items identifed in prior field season - 8' container moves with contents overland or by air
181 1.2 Drill Drill refit components FS2 Single crate. Consumables/drill refit components - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 31 7/1/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 Comsur USAP Air - - - - 0.50 11/1/2024 FY25 intra FY25 LC-130 - - - 0.50 11/15/2024 11/15/2024 0.00 106.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Items identifed in prior field season
182 1.2 Drill Load member cable reel [placeholder, may not be required] Cable Reel used to deploy downhole load member during string installation 84 60 48 1 140 140 3,800 3,800 estimated - U. Wisc. Madison 136 6/1/2023 10/15/2023 UWM - PTH Truck PTH - MCM FY24 inter FY24 Vessel USAP Vessel - - - 0.25 - 2/6/2024 FY25 intra FY25 SPOT 2 - 0.25 - - 1/1/2025 6/1/2025 151.00 595.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Required onsite in FW YR 2 for integration - recent addition, still in development
183 1.4 Installation ICL power and timing electronics 1 crate containing rackmount electronics for power and timing systems - Do Not Freeze 96 48 48 1 128 128 600 600 estimated DNF U. Wisc. Madison 462 4/27/2023 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 11/30/2024 12/1/2024 1.00 122.00 Yes J. Kelley 10/12/2021 D. Tosi 4/11/2022 -
184 1.4 Installation ICL patch cables and patch panels Standard vessel shipping - can overwinter in McM if shipped earlier - Do Not Deep Freeze 96 48 48 1 128 128 1,200 1,200 estimated DNDF [TBD] U. Wisc. Madison 624 11/16/2022 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 11/30/2024 12/1/2024 1.00 122.00 Yes J. Kelley 10/12/2021 D. Tosi 4/11/2022 (*) storage in McMurdo pending low temperature test
185 1.2 Installation Installation Hardware 87-93 Installation hardware 96 48 48 7 128 896 1,000 7,000 estimated - U. Wisc. Madison 97 7/10/2023 10/15/2023 UWM - PTH Truck PTH - MCM FY24 inter FY24 Vessel USAP Vessel - - 2.00 - - 2/6/2024 FY25 intra FY25 SPOT 2 - 0.10 - - 1/1/2025 11/18/2025 321.00 765.00 Yes D. Tosi 9/22/2021 I. McEwen 9/22/2021 -
186 1.2 Installation Installation Weights 87-93 Installation weights 36 24 24 7 12 84 786 5,502 estimated - U. Wisc. Madison 110 6/27/2023 10/15/2023 UWM - PTH Truck PTH - MCM FY24 inter FY24 Vessel USAP Vessel - - 1.00 - - 2/6/2024 FY25 intra FY25 SPOT 2 - 0.10 - - 1/1/2025 11/18/2025 321.00 765.00 Yes D. Tosi 9/22/2021 I. McEwen 9/22/2021 -
187 1.2 Installation Misc. Science Equipment - FS2 (FY25) Scientific and test equipment (SPAT, DCM, IME, Paros et al.) - Do Not Freeze 48 48 48 1 64 64 1,500 1,500 estimated DNF U. Wisc. Madison 50 6/12/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 11/30/2024 12/1/2024 1.00 122.00 Yes T. Karg 10/8/2021 D. Tosi 10/8/2021 -
188 1.5 Installation Calibration/Special Devices 87-88 3+1 PencilBeams from UW, 2+1 pDOM and 1+1 LOMs - Do Not Deep Freeze 58 38 41 1 53 53 836 836 estimated DNDF [-40C] U. Wisc. Madison 2 7/30/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13.00 149.00 Yes D. Williams 10/13/2021 D. Tosi 10/13/2021 -
189 1.3 Installation Special Devices 87-88 Special devices for 2 strings from UW (4+1 Radio Pulsers (all strings) 1+1 Radio Receivers, 3+1 FOM) - Do Not Deep Freeze 63 40 42 1 62 62 677 677 preliminary DNDF [-40C] UWM/Kansas 2 7/30/2024 8/1/2024 UWM - PTH Truck PTH - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13.00 149.00 Yes S. Boeser 10/13/2021 D. Tosi 10/13/2021 4+1 Radio Pulser, weight 50 kg. 1+1 Radio receiver, assume mDOM weight, 3+1 FOM (assume mDOM weight) + 2ftx2ftx4ft FOM box (50 lbs). Special Devices from UW. FTS, seismometer missing from estimate. 250 lbs crate estimate
190 1.4 Installation Surface Cable Assemblies Palletized wooden cable drums (Qty: 7). Can overwinter in MCM. Do Not Deep Freeze 48 65 71 7 129 903 1,336 9,352 actual DNDF [-55C] MSU 106 7/1/2022 10/15/2022 MSU - PTH Truck PTH - MCM FY23 inter FY23 Vessel USAP Vessel - - 2.00 - - 2/6/2023 FY25 intra FY25 SPOT 1 0.50 - - - 12/1/2024 12/15/2024 14.00 792.00 Yes T. DeYoung 10/13/2021 D. Tosi 4/11/2022 Shipping date early due to storage limitations at MSU. Additional float at Port Hueneme assuming USAP vessel departure.
191 1.4 Installation Breakout cables for strings 87-88 Standard vessel shipping. 2 wooden crates containing spooled breakout cable assemblies - 96 cf / 1,000 lbs each - Cryo storage - Do Not Deep Freeze 72 48 48 2 96 192 1,000 2,000 estimated DNDF[-40C](*) MSU 477 6/26/2023 10/15/2024 MSU - PTH Truck PTH - MCM FY25 inter FY25 Vessel USAP Vessel - 0.25 - - - 2/6/2025 FY25 intra FY25 LC-130 - - - 0.50 2/15/2025 12/10/2025 298.00 421.00 Yes T. DeYoung 9/20/2021 D. Tosi 4/11/2022 Shipping date early due to storage limitations at MSU. Additional float at Port Hueneme assuming USAP vessel departure. Preliminary estimate of weight and size. Pre-staging string 87-88 equipment in cryo or ICL. - if storage at Pole not possible, could overwinter in McM (at an increased risk and pending low temperature test) (*)
192 1.3 Installation String Sensors 87-88 (mDOMs DESY) Optical sensors for 2 strings from Germany (mDOMs) (spares included) - Do Not Deep Freeze 40 48 46 16 52 832 573 9,168 actual DNDF [-40C] DESY 440 5/19/2023 8/1/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 2.00 11/1/2024 FY25 intra FY25 LC-130 - - - 2.00 12/15/2024 12/28/2024 13.00 149.00 Yes T. Karg 9/20/2021 D. Tosi 9/22/2021 mDOM weight is 62 lbs (25kg/sensor + 3 kg/box) + 35kg pallet, assume 8 mDOMs/pallet - 116 to be deployed + 12 spares -
shipped in 20 HC container. Container weight not included in the assumption that pallet will be taken out in CHC.
193 1.3 Installation String Sensors 87-88 (mDOMs DESY) Optical sensors for 2 strings from Germany (mDOMs) (SPARES) - Do Not Deep Freeze 40 48 46 0 52 0 573 0 actual DNDF [-40C] DESY 440 5/19/2023 8/1/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13.00 149.00 Yes T. Karg 9/20/2021 D. Tosi 9/22/2021 mDOM weight is 62 lbs (25kg/sensor + 3 kg/box) + 35kg pallet, assume 8 mDOMs/pallet - shipped in 20 HC container. Container weight not included in the assumption that pallet will be taken out in CHC.
194 1.3 Installation Special Devices 87-88 (Europe) Special devices for 2 strings from DESY/Germany/Sweden (8 WOMs, 0 Abalone) + spares - Do Not Deep Freeze 40 21 64 1 32 32 701 701 estimated DNDF [-40C] Mainz 578 1/1/2023 8/1/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13.00 149.00 Yes S. Boeser 10/13/2021 D. Tosi 10/13/2021 8 WOMs (no spares) - AH not included for now. Assume 150 lbs crate.
195 1.5 Installation Calibration Devices 87-88 (Europe) Calibration devices for 2 strings from DESY/Germany/Sweden (4+2 POCAMs, 3+1 Acoustic sensors, 2+1 Swedish Cameras) - Do Not Deep Freeze 62 38 41 1 56 56 836 836 estimated DNDF [-40C] TUM/Aachen/Sweden 792 6/1/2022 8/1/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13.00 149.00 Yes D. Williams 10/13/2021 D. Tosi 10/13/2021 Calibration devices for strings 87-88 = 2+1 Sweden Camera + 3+1 Acoustic Module + 4+1 POCAM, including spares, 200 lbs crate
196 1.4 Installation FieldHub electronics Required onsite for FY24 installation. 1 crate containing readout electronics for installation in ICL - Do Not Freeze 48 48 36 1 48 48 275 275 preliminary DNF DESY 304 10/16/2023 8/15/2024 DESY - CHC ComSur DESY-CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 11/30/2024 12/1/2024 1.00 108.00 No J. Kelley 10/13/2021 D. Tosi 4/11/2022 Field Hubs are 442mm x 480mm x 133 mm (17.4" x 18.9" x 5.2") and weight maybe 10 lb each. 100 lbs crate. Ready to ship date actually chosen to be 2 weeks ahead of ship date to maximize time with the electronics (sort of backloaded)
197 1.3 Installation String Sensors 87 & 88 (D-Eggs-8x) Sensors (D-Eggs) pallets with 8 sensors at Pole overwinter - Cryo location - Do Not Deep Freeze 41 41 69 4 68 272 750 3,000 actual DNDF [-40C] Chiba 736 7/27/2022 8/1/2024 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY25 inter FY25 ComSur USAP Air - - - - 1.00 11/1/2024 FY25 intra FY25 LC-130 - - - 1.00 12/15/2024 12/28/2024 13.00 149.00 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 Box size is 480x480x770mm (19"x19"x30.5"). 2x12-DEgg pallets combined with 2x8-DEgg pallets to form one 463L pallet
198 1.3 Installation String Sensors 87 & 88 (D-Eggs-8x) Sensors (D-Eggs) pallets with 8 sensors at Pole overwinter (SPARES - TBD) - Cryo location - Do Not Deep Freeze 41 41 69 1 68 68 750 750 actual DNDF [-40C] Chiba 736 7/27/2022 8/1/2024 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13.00 149.00 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 SPARES number to be confirmed.
199 1.3 Installation String Sensors 87 & 88 (D-Eggs-12x) Sensors (D-Eggs) pallets with 12 sensors at Pole overwinter - Cryo location - Do Not Deep Freeze 60 41 69 4 99 396 1,102 4,408 actual DNDF [-40C] Chiba 736 7/27/2022 8/1/2024 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY25 inter FY25 ComSur USAP Air - - - - 1.00 11/1/2024 FY25 intra FY25 LC-130 - - - 1.00 12/15/2024 12/28/2024 13.00 149.00 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 2x12-DEgg pallets combined with 2x8-DEgg pallets to form one 463L pallet
200 1.3 Installation String Sensors 87 & 88 (D-Eggs-12x) Sensors (D-Eggs) pallets with 12 sensors at Pole overwinter (SPARES - TBD)- Cryo location - Do Not Deep Freeze 60 41 69 1 99 99 1,102 1,102 actual DNDF [-40C] Chiba 736 7/27/2022 8/1/2024 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY25 inter FY25 ComSur USAP Air - - - - 0.25 11/1/2024 FY25 intra FY25 LC-130 - - - 0.25 12/15/2024 12/28/2024 13.00 149.00 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 SPARES number to be confirmed.
201 1.2 Fuel Field Season 2 Fuel Fuel to support FY24 field season - Base fuel, firn drilling & over winter heating 0 0 0 18,178 0 2,430 7 123,610 preliminary - - - - - - - - FY25 inter - - - - - - 0.00 11/1/2024 FY25 intra FY25 LC-Tanker - - - 0.00 12/1/2024 12/1/2024 0.00 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -
202 1.2 Fuel Field Season 2 Fuel Contingency Fuel to support FY24 field season - Contingency 0 0 0 2,373 0 317 7 16,136 preliminary - - - - - - - - FY25 inter - - - - - - 0.00 11/1/2024 FY25 intra FY25 LC-Tanker - - - 0.00 12/1/2024 12/1/2024 0.00 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -
203          
204          
205          
206          
207          
208          
209          
210 12067.28 251744.8 3.35 2.90 0.45 0.00 9.25
211 Total cu ft Total lbs Sled count SPOT 1 SPOT 2 SPOT 3 463L count
212  
213                                            
214
215 FY26 inter
216 1.2 Drill Driller resupply/refit components - 8' Container FS3 8' Mini Milvan; Consumables/drill components 96 86 96 1 459 459 6,500 6,500 estimated - U. Wisc. Madison 31 7/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 1.00 11/1/2025 FY26 intra FY26 LC-130 - - - 1.00 11/15/2025 11/15/2025 0.00 106.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Items identifed in prior field season - 8' container moves with contents overland or by air
217 1.2 Drill Drill refit components FS3 Single crate. Consumables/drill refit components - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 31 7/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 Comsur USAP Air - - - - 0.50 11/1/2025 FY26 intra FY26 LC-130 - - - 0.50 11/15/2025 11/15/2025 0.00 106.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Items identifed in prior field season
218 1.2 Installation Misc. Science Equipment - FS3 (FY26) Scientific and test equipment - Do Not Freeze [science supplies for FS3] 48 48 48 1 64 64 1,500 1,500 estimated DNF U. Wisc. Madison 25 7/7/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/15/2025 12/1/2025 16.00 122.00 Yes D. Tosi 10/8/2021 D. Tosi 10/8/2021 -
219 1.3 Installation Special Devices 89-93 Special devices for 5 remaining strings from UW (4+1 FOM,2+1 Radio Receivers, 11+1 LOM + seismometer*) - Do Not Deep Freeze 81 56 51 1 134 134 1,797 1,797 estimated DNDF [-40C] UWM/Kansas 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 1.50 11/1/2025 FY26 intra FY26 LC-130 - - - 1.50 11/25/2025 12/10/2025 15.00 131.00 Yes S. Boeser 10/13/2021 D. Tosi 10/13/2021 21 Special Devices from USA (11+ 1 LOM, 4+1 FOM, 2+1 RR, FTS ? , seismometer), assume mDOM weight. 200 lbs wood crate. FTS not included. (*) Seismometer not yet in CMD
220 1.5 Installation Calibration/Special Devices 89-93 8+1 PencilBeams, 12+1 pDOMs from UW - Do Not Deep Freeze 75 56 41 1 101 101 1,602 1,602 preliminary DNDF [-40C] U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.50 11/1/2025 FY26 intra FY26 LC-130 - - - 0.50 11/25/2025 12/10/2025 15.00 131.00 Yes D. Williams 10/13/2021 D. Tosi 10/5/2021 8+1 PencilBeams for strings 89-93, 12+1 pDOMs, assume mDOM weight. 244 lbs crate.
221 1.5 Installation Dust logging device Blue Logging device - sensitive equipment - Do Not Freeze 48 17 17 1 9 9 60 60 actual DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15.00 131.00 Yes D. Williams 10/14/2021 D. Tosi 9/18/2021 Used weights from last deployment season shipment data (could be combined)
222 1.5 Installation Dust logging device Green Logging device - sensitive equipment - Do Not Freeze 48 17 17 1 9 9 60 60 actual DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15.00 131.00 Yes D. Williams 10/14/2021 D. Tosi 9/19/2021 Used weights from last deployment season shipment data (could be combined)
223 1.5 Installation Dust logging device Electronics parts - sensitive equipment - Do Not Freeze 26 24 24 1 9 9 120 120 actual DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15.00 131.00 Yes D. Williams 10/14/2021 D. Tosi 9/20/2021 Used weights from last deployment season shipment data (could be combined)
224 1.5 Installation Dust logging device Electronics parts - sensitive equipment - Do Not Freeze 26 23 20 1 7 7 60 60 actual DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15.00 131.00 Yes D. Williams 10/14/2021 D. Tosi 9/21/2021 Used weights from last deployment season shipment data (could be combined)
225 1.5 Installation Logging winch Winch to be used for Dust Logging 86 60 68 1 204 204 3,500 3,500 preliminary 0 U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.50 11/1/2025 FY26 intra FY26 LC-130 - - - 0.50 11/25/2025 12/10/2025 15.00 131.00 Yes D. Tosi 10/8/2021 I. McEwen 10/8/2021 Used weights and cubes of IDP deep logging winch. Send back end of season
226 1.5 Installation Logging winch control box Control Box for winch for Dust Logging - sensitive equipment - Do Not Freeze 48 48 36 1 48 48 400 400 preliminary DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/25/2025 12/10/2025 15.00 131.00 Yes D. Tosi 10/8/2021 I. McEwen 10/8/2021 Used weights and cubes of IDP deep logging winch. Send back end of season
227 1.3 Installation String Sensors 89-93 (mDOMs MSU) Optical Sensors for 5 strings from MSU (mDOMs) - Do Not Deep Freeze 40 48 46 25 52 1,300 573 14,325 actual(**) DNDF [-40C] MSU 686 9/15/2023 8/1/2025 MSU - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 3.00 11/1/2025 FY26 intra FY26 LC-130 - - - 3.00 11/25/2025 12/10/2025 15.00 131.00 Yes T. Karg 9/20/2021 D. Tosi 4/11/2022 mDOM weight is 28 kg/boxed + 35kg pallet, assume 8 mDOMs/pallet (189 to be deployed + 11 spares)(*)Assumed to be shipped in 2x20' HC (5115 lbs, 238inx96inx114in) or a 40 ft HC, purchased by MSU or loaned in PTH (container weight not included)
228 1.3 Installation String Sensors 89-93 (mDOMs MSU) Optical Sensors for 5 strings from MSU (mDOMs) containers (TBD) - Do Not Deep Freeze 238 96 114 0 1508 0 5,115 0 actual(**) DNDF [-40C] MSU 686 9/15/2023 8/1/2025 MSU - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15.00 131.00 Yes T. Karg 9/20/2021 D. Tosi 4/11/2022 Assume 2x20HC containers for transport on COMSUR (TBC). Pallets could be loaded to 53 ft truck and loaded into a loaned container in PTH but this would increase touch points (and risk)
229 1.3 Installation DM-Ice DM-ice (two modules for string 89 and 90) - Do Not Deep Freeze 48 48 48 1 64 64 1,500 1,500 estimated DNDF [-40C] Yale 426 6/1/2024 8/1/2025 Yale - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/15/2025 12/5/2025 20.00 126.00 Yes M. Kauer 9/20/2021 D. Tosi 9/20/2021 -
230 1.3 Installation String Sensors 89-93 (mDOMs DESY) Optical sensors for 5 strings from Germany (mDOMs) - Do Not Deep Freeze 40 48 46 12 52 624 573 6,876 actual(**) DNDF [-40C] DESY 721 8/11/2023 8/1/2025 DESY - CHC ComSur DESY-CHC FY26 inter FY26 ComSur USAP Air - - - - 3.00 11/1/2025 FY26 intra FY26 LC-130 - - - 3.00 11/25/2025 12/10/2025 15.00 131.00 Yes T. Karg 9/20/2021 D. Tosi 4/11/2022 mDOM weight is (28kg/sensor boxed) + 35kg pallet, assume 8 mDOMs/pallet - 190 to be deployed + 10 spares. (**) shipped in 20 HC container. Container not included in weight as pallets will be taken out.
231 1.3 Installation Special Devices 89-93 (Europe) Special devices for 5 remaining strings from DESY/Germany/Sweden (6 WOMs, 3 Abalone Hubs or WOM Traps) no spares - Do Not Deep Freeze 32 31 89 1 52 52 1,035 1,035 preliminary DNDF [-40C] Mainz 578 1/1/2024 8/1/2025 DESY - CHC ComSur DESY-CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/25/2025 12/10/2025 15.00 131.00 Yes S. Boeser 10/13/2021 D. Tosi 10/13/2021 6 Special Devices from Germany 6 (WOM + 0 AH) including 0 spare for each. Assume 170 lbs crate.
232 1.5 Installation Calibration Devices 89-93 (Europe) Calibration for 5 strings from DESY/Germany/Sweden (17+2 POCAMs, 7+ 1 Acoustic sensors, 3+ 1 Swedish Cameras) including spares - Do Not Deep Freeze 62 48 44 1 76 76 1,694 1,694 preliminary DNDF [-40C] TUM/Aachen/Sweden 1157 6/1/2022 8/1/2025 DESY - CHC ComSur DESY-CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/25/2025 12/10/2025 15.00 131.00 Yes D. Williams 10/13/2021 D. Tosi 10/13/2021 Calibration devices for strings 89-93 = 3+1 Sweden Camera,7+1 + Acoustic Module,17 +1 POCAM, including spares, 200 lbs crate
233 1.3 Installation String Sensors 89-93 (D-Eggs-8x) Sensors (D-Eggs) pallets with 8 sensors - Do Not Deep Freeze 41 41 69 10 68 680 750 7,500 actual DNDF [-40C] Chiba 812 5/12/2023 8/1/2025 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY26 inter FY26 ComSur USAP Air - - - - 2.50 11/1/2025 FY26 intra FY26 LC-130 - - - 2.50 11/25/2025 12/10/2025 15.00 131.00 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 2x12-DEgg pallets combined with 2x8-DEgg pallets to form one 463L pallet
234 1.3 Installation String Sensors 89-93 (D-Eggs-12x) Sensors (D-Eggs) pallets with 12 sensors - Do Not Deep Freeze 60 41 69 10 99 990 1,102 11,020 actual DNDF [-40C] Chiba 812 5/12/2023 8/1/2025 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY26 inter FY26 ComSur USAP Air - - - - 2.50 11/1/2025 FY26 intra FY26 LC-130 - - - 2.50 11/25/2025 12/10/2025 15.00 131.00 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 2x12-DEgg pallets combined with 2x8-DEgg pallets to form one 463L pallet
235 1.2 Fuel Field Season 3 Fuel Fuel to support FY25 field season - Base fuel & deep drilling 0 0 0 62,694 0 8,381 7 426,319 preliminary - - - - - - - - FY26 inter - - - - - - 0.00 11/1/2025 FY26 intra FY26 LC-Tanker - - - 0.00 12/1/2025 12/1/2025 0.00 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -
236 1.2 Fuel Field Season 3 Fuel Contingency Fuel to support FY25 field season - Contingency 0 0 0 8,473 0 1,133 7 57,616 preliminary - - - - - - - - FY26 inter - - - - - - 0.00 11/1/2025 FY26 intra FY26 LC-Tanker - - - 0.00 12/1/2025 12/1/2025 0.00 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -
237          
238          
239          
240          
241 14471.65 546,485 0.00 0.00 0.00 0.00 0.00 16.56  
242 Total cu ft Total lbs TEU count 40F 40D 20D 20F 463L count  
243  
244  
245                                        
246
247 FY26 intra 3801 47,714
248 1.2 Drill Driller resupply/refit components - 8' Container FS3 8' Mini Milvan; Consumables/drill components 96 86 96 1 459 459 6,500 6,500 estimated - U. Wisc. Madison 31 7/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 1.00 11/1/2025 FY26 intra FY26 LC-130 - - - 1.00 11/15/2025 11/15/2025 0.00 106.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Items identifed in prior field season - 8' container moves with contents overland or by air
249 1.2 Drill Drill refit components FS3 Single crate. Consumables/drill refit components - Do Not Freeze 96 48 48 1 128 128 3,000 3,000 estimated DNF U. Wisc. Madison 31 7/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 Comsur USAP Air - - - - 0.50 11/1/2025 FY26 intra FY26 LC-130 - - - 0.50 11/15/2025 11/15/2025 0.00 106.00 Yes D. Gibson 10/8/2021 I. McEwen 10/8/2021 Items identifed in prior field season
250 1.2 Installation Misc. Science Equipment - FS3 (FY26) Scientific and test equipment - Do Not Freeze [science supplies for FS3] 48 48 48 1 64 64 1,500 1,500 estimated DNF U. Wisc. Madison 25 7/7/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/15/2025 12/1/2025 16.00 122.00 Yes D. Tosi 10/8/2021 D. Tosi 10/8/2021 -
251 1.3 Installation Special Devices 89-93 Special devices for 5 remaining strings from UW (4+1 FOM,2+1 Radio Receivers, 11+1 LOM + seismometer*) - Do Not Deep Freeze 81 56 51 1 134 134 1,797 1,797 estimated DNDF [-40C] UWM/Kansas 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 1.50 11/1/2025 FY26 intra FY26 LC-130 - - - 1.50 11/25/2025 12/10/2025 15.00 131.00 Yes S. Boeser 10/13/2021 D. Tosi 10/13/2021 21 Special Devices from USA (11+ 1 LOM, 4+1 FOM, 2+1 RR, FTS ? , seismometer), assume mDOM weight. 200 lbs wood crate. FTS not included. (*) Seismometer not yet in CMD
252 1.5 Installation Calibration/Special Devices 89-93 8+1 PencilBeams, 12+1 pDOMs from UW - Do Not Deep Freeze 75 56 41 1 101 101 1,602 1,602 preliminary DNDF [-40C] U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.50 11/1/2025 FY26 intra FY26 LC-130 - - - 0.50 11/25/2025 12/10/2025 15.00 131.00 Yes D. Williams 10/13/2021 D. Tosi 10/5/2021 8+1 PencilBeams for strings 89-93, 12+1 pDOMs, assume mDOM weight. 244 lbs crate.
253 1.5 Installation Dust logging device Blue Logging device - sensitive equipment - Do Not Freeze 48 17 17 1 9 9 60 60 actual DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15.00 131.00 Yes D. Williams 10/14/2021 D. Tosi 9/18/2021 Used weights from last deployment season shipment data (could be combined)
254 1.5 Installation Dust logging device Green Logging device - sensitive equipment - Do Not Freeze 48 17 17 1 9 9 60 60 actual DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15.00 131.00 Yes D. Williams 10/14/2021 D. Tosi 9/19/2021 Used weights from last deployment season shipment data (could be combined)
255 1.5 Installation Dust logging device Electronics parts - sensitive equipment - Do Not Freeze 26 24 24 1 9 9 120 120 actual DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15.00 131.00 Yes D. Williams 10/14/2021 D. Tosi 9/20/2021 Used weights from last deployment season shipment data (could be combined)
256 1.5 Installation Dust logging device Electronics parts - sensitive equipment - Do Not Freeze 26 23 20 1 7 7 60 60 actual DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15.00 131.00 Yes D. Williams 10/14/2021 D. Tosi 9/21/2021 Used weights from last deployment season shipment data (could be combined)
257 1.5 Installation Logging winch Winch to be used for Dust Logging 86 60 68 1 204 204 3,500 3,500 preliminary 0 U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.50 11/1/2025 FY26 intra FY26 LC-130 - - - 0.50 11/25/2025 12/10/2025 15.00 131.00 Yes D. Tosi 10/8/2021 I. McEwen 10/8/2021 Used weights and cubes of IDP deep logging winch. Send back end of season
258 1.5 Installation Logging winch control box Control Box for winch for Dust Logging - sensitive equipment - Do Not Freeze 48 48 36 1 48 48 400 400 preliminary DNF U. Wisc. Madison 61 6/1/2025 8/1/2025 UWM - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/25/2025 12/10/2025 15.00 131.00 Yes D. Tosi 10/8/2021 I. McEwen 10/8/2021 Used weights and cubes of IDP deep logging winch. Send back end of season
259 1.4 Installation Breakout cables for strings 89-93 Stored in McMurdo FY24. 5 wooden crates containing spooled breakout cable assemblies - 96 cf/ 1,000 lbs each (preliminary) - Do Not Deep Freeze 72 48 48 5 96 480 1,000 5,000 estimated DNDF[-40C](*) MSU 379 10/2/2023 10/15/2024 MSU - PTH Truck PTH - MCM FY25 inter FY25 Vessel USAP Vessel - - 2.00 - - 2/6/2025 FY26 intra FY26 LC-130 - - - 1.00 11/25/2025 12/10/2025 15.00 421.00 Yes T. DeYoung 9/20/2021 D. Tosi 4/11/2022 Float in PTH due to storage limitation in MSU.
(*) storage in McMurdo pending low temperature test
260 1.4 Installation Main (downhole) load members 87-93 [placeholder, may not be required] May be possible to store in McMurdo until drill season - Do Not Deep Freeze 47 47 39 7 50 350 766 5,362 preliminary DNDF[-40C](*) MSU 563 4/1/2023 10/15/2024 MSU - PTH Truck PTH - MCM FY25 inter FY25 Vessel USAP Vessel - - 1.00 - - 2/6/2025 FY26 intra FY26 SPOT 1 1.00 - - - 12/1/2025 12/2/2025 1.00 413.00 Yes T. DeYoung 9/20/2021 D. Tosi 10/11/2021 Shipping date synched with main (downhole) cables due to storage limitation in MSU. Float in PTH.
261 1.4 Installation Main (downhole) cables 87-93 May be possible to store in McMurdo until drill season - Do Not Deep Freeze 96 96 96 7 512 3,584 15,000 105,000 preliminary DNDF[-40C](*) MSU 31 9/14/2023 10/15/2023 MSU - PTH Truck PTH - MCM FY24 inter FY24 Vessel USAP Vessel - - 2.00 - - 2/6/2025 FY26 intra FY26 SPOT 1 1.50 - - - 12/1/2025 12/2/2025 1.00 779.00 Yes T. DeYoung 9/20/2021 D. Tosi 4/11/2022 Shipping date chosen to be 2 weeks after scheduled ready to ship date because of storage limitations at MSU. additional 7 months of float at Port Hueneme assuming USAP vessel departure. (*) storage in McMurdo pending low temperature test.
262 1.3 Installation String Sensors 89-93 (mDOMs MSU) Optical Sensors for 5 strings from MSU (mDOMs) - Do Not Deep Freeze 40 48 46 25 52 1,300 573 14,325 actual(**) DNDF [-40C] MSU 686 9/15/2023 8/1/2025 MSU - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 3.00 11/1/2025 FY26 intra FY26 LC-130 - - - 3.00 11/25/2025 12/10/2025 15.00 131.00 Yes T. Karg 9/20/2021 D. Tosi 4/11/2022 mDOM weight is 28 kg/boxed + 35kg pallet, assume 8 mDOMs/pallet (189 to be deployed + 11 spares)(*)Assumed to be shipped in 2x20' HC (5115 lbs, 238inx96inx114in) or a 40 ft HC, purchased by MSU or loaned in PTH (container weight not included)
263 1.3 Installation String Sensors 89-93 (mDOMs MSU) Optical Sensors for 5 strings from MSU (mDOMs) containers (TBD) - Do Not Deep Freeze 238 96 114 0 1508 0 5,115 0 actual(**) DNDF [-40C] MSU 686 9/15/2023 8/1/2025 MSU - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.06 11/1/2025 FY26 intra FY26 LC-130 - - - 0.06 11/25/2025 12/10/2025 15.00 131.00 Yes T. Karg 9/20/2021 D. Tosi 4/11/2022 Assume 2x20HC containers for transport on COMSUR (TBC). Pallets could be loaded to 53 ft truck and loaded into a loaned container in PTH but this would increase touch points (and risk)
264 1.3 Installation DM-Ice DM-ice (two modules for string 89 and 90) - Do Not Deep Freeze 48 48 48 1 64 64 1,500 1,500 estimated DNDF [-40C] Yale 426 6/1/2024 8/1/2025 Yale - PTH Truck PTH - CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/15/2025 12/5/2025 20.00 126.00 Yes M. Kauer 9/20/2021 D. Tosi 9/20/2021 -
265 1.3 Installation String Sensors 89-93 (mDOMs DESY) Optical sensors for 5 strings from Germany (mDOMs) - Do Not Deep Freeze 40 48 46 12 52 624 573 6,876 actual(**) DNDF [-40C] DESY 721 8/11/2023 8/1/2025 DESY - CHC ComSur DESY-CHC FY26 inter FY26 ComSur USAP Air - - - - 3.00 11/1/2025 FY26 intra FY26 LC-130 - - - 3.00 11/25/2025 12/10/2025 15.00 131.00 Yes T. Karg 9/20/2021 D. Tosi 4/11/2022 mDOM weight is (28kg/sensor boxed) + 35kg pallet, assume 8 mDOMs/pallet - 190 to be deployed + 10 spares. (**) shipped in 20 HC container. Container not included in weight as pallets will be taken out.
266 1.3 Installation Special Devices 89-93 (Europe) Special devices for 5 remaining strings from DESY/Germany/Sweden (6 WOMs, 3 Abalone Hubs or WOM Traps) no spares - Do Not Deep Freeze 32 31 89 1 52 52 1,035 1,035 preliminary DNDF [-40C] Mainz 578 1/1/2024 8/1/2025 DESY - CHC ComSur DESY-CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/25/2025 12/10/2025 15.00 131.00 Yes S. Boeser 10/13/2021 D. Tosi 10/13/2021 6 Special Devices from Germany 6 (WOM + 0 AH) including 0 spare for each. Assume 170 lbs crate.
267 1.5 Installation Calibration Devices 89-93 (Europe) Calibration for 5 strings from DESY/Germany/Sweden (17+2 POCAMs, 7+ 1 Acoustic sensors, 3+ 1 Swedish Cameras) including spares - Do Not Deep Freeze 62 48 44 1 76 76 1,694 1,694 preliminary DNDF [-40C] TUM/Aachen/Sweden 1157 6/1/2022 8/1/2025 DESY - CHC ComSur DESY-CHC FY26 inter FY26 ComSur USAP Air - - - - 0.25 11/1/2025 FY26 intra FY26 LC-130 - - - 0.25 11/25/2025 12/10/2025 15.00 131.00 Yes D. Williams 10/13/2021 D. Tosi 10/13/2021 Calibration devices for strings 89-93 = 3+1 Sweden Camera,7+1 + Acoustic Module,17 +1 POCAM, including spares, 200 lbs crate
268 1.3 Installation String Sensors 89-93 (D-Eggs-8x) Sensors (D-Eggs) pallets with 8 sensors - Do Not Deep Freeze 41 41 69 10 68 680 750 7,500 actual DNDF [-40C] Chiba 812 5/12/2023 8/1/2025 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY26 inter FY26 ComSur USAP Air - - - - 2.50 11/1/2025 FY26 intra FY26 LC-130 - - - 2.50 11/25/2025 12/10/2025 15.00 131.00 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 2x12-DEgg pallets combined with 2x8-DEgg pallets to form one 463L pallet
269 1.3 Installation String Sensors 89-93 (D-Eggs-12x) Sensors (D-Eggs) pallets with 12 sensors - Do Not Deep Freeze 60 41 69 10 99 990 1,102 11,020 actual DNDF [-40C] Chiba 812 5/12/2023 8/1/2025 ChibaU - CHC Cargo shipment by CHU ChibaU - CHC FY26 inter FY26 ComSur USAP Air - - - - 2.50 11/1/2025 FY26 intra FY26 LC-130 - - - 2.50 11/25/2025 12/10/2025 15.00 131.00 Yes S. Yoshida 9/22/2021 D. Tosi 4/11/2022 2x12-DEgg pallets combined with 2x8-DEgg pallets to form one 463L pallet
270 1.2 Fuel Field Season 3 Fuel Fuel to support FY25 field season - Base fuel & deep drilling 0 0 0 62,694 0 8,381 7 426,319 preliminary - - - - - - - - FY26 inter - - - - - - 0.00 11/1/2025 FY26 intra FY26 LC-Tanker - - - 0.00 12/1/2025 12/1/2025 0.00 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -
271 1.2 Fuel Field Season 3 Fuel Contingency Fuel to support FY25 field season - Contingency 0 0 0 8,473 0 1,133 7 57,616 preliminary - - - - - - - - FY26 inter - - - - - - 0.00 11/1/2025 FY26 intra FY26 LC-Tanker - - - 0.00 12/1/2025 12/1/2025 0.00 - Yes T. Benson 10/14/2021 I. McEwen 10/14/2021 -
272          
273          
274          
275          
276 18885.65 661846.60 2.50 2.50 0.00 0.00 17.56
277 Total cu ft Total lbs Sled count SPOT 1 SPOT 2 SPOT 3 463L count
278    
279                    
280 At South Pole 733 12,241    
281 In McMurdo 20,513 205,787    
282 INTER TO GO 31,985 958,863    
283 INTRA TO GO 52,498 1,164,650 total inter cargo equal to total project cargo in master input sheet 1    
284 INTER PROJECT TOTAL (Includes Fuel) 53,231 1,176,891 total intra cargo equal to total project cargo in master input sheet 1    
285 INTRA PROJECT TOTAL (Includes Fuel) 53,231 1,176,891    
286    
287    
288    
289      
290      
291      
292      
293      
294      
295      
296      
297      
298      
299      
300      
301      
302      
303      
304      
305                                                                                          
306                                                                                          
307                                                                                          

Back to top


  A B C D E F G H I J L M N O P R S T U V W X Y Z AA AB AC AF AG AH AI AJ AK AL AM AN AO AP
1                                                                          
2                                                                            
3 Intercontinental leg volume
[cu ft]
fraction of volume weight
[lbs]
fraction of weight         Intracontinental leg volume
[cu ft]
fraction of volume weight
[lbs]
fraction of weight                                              
4 FY23 intercontinental 5,472 17% 73,642 8%         FY23 intracontinental 16,363 40% 159,006 30%                                              
5 FY24 intercontinental 5,319 17% 149,074 16%         FY24 intracontinental 4,695 12% 67,280 13%                                              
6 FY25 intercontinental 6,722 21% 189,662 20%         FY25 intracontinental 9,320 23% 111,998 21%                                              
7 FY26 intercontinental 14,472 45% 546,485 57%         FY25 intracontinental 9,372 23% 177,911 34%                                              
8   Total 31,985 100% 958,863 100%         At the South Pole 733 2% 12,241 2%                                              
9   In McMurdo 20,513   205,787           Total project cargo 40,483 100% 528,436 100%                                              
10   At South Pole 733   12,241                                                                  
11   Total project cargo 53,231   1,176,891           cross check 40,483   528,436                                                
12                                                       AN-8 lbs/gal 6.8                  
13                                                                            
14 Intercontinental leg volume
[cu ft]
weight
[lbs]
Vessel Container Allocation 40F Vessel Container Allocation 40D Vessel Container Allocation 20D Vessel Container Allocation 20F TEU Count C-17 Pallet Allocation Intracontinental leg volume
[cu ft]
weight
[lbs]
# SPOT
Sleds
# 263
Pallets
Fiscal Year Intracontinental leg Needed
Fuel [Gallons]
# 263 Pallets
(ROUND UP)
Cargo Weight
including Pallets and TDE [lbs]
Available
LC Flights
Available ACLs
[lbs]
1 flight = 23800 lbs
LC Cargo Available Capacity for fuel
[lbs]
Fuel delivered by
LC -130 for ICU [Gallons] using 6.8 lbs/gallon for AN-8
Available LC Flight for Tanker Missions Fuel Delivered by
LC -130 for ICU [Gallons]
                     
15   In McMurdo 20,513 205,787 0.00 0.00 0.00 0.00 0.00 0.00 At South Pole 733 12,241 0.00 0.00                         ACL [lbs] 22600                  
16   At South Pole 733 12,241 0.00 0.00 0.00 0.00 0.00 0.00 FY23 LC-130 0 0 0.00 0.00 FY23 FY23 LC-Tanker 0 0 0 2 45,200 0.0 45,200 6,647 2.0 6,000 gallons/LC-130 3000                  
17   FY23 Vessel 5,470 73,632 0.00 0.00 5.75 0.50 6.25 0.75 FY23 SPOT 1 5,654 21,601 3.00                           # pallets/LC-130 5                  
18   FY23 ComSur 2 10 0.00 0.00 0.00 0.00 0.00 0.02 FY23 SPOT 2 7,989 109,405 3.00                           LC-130 flight hours 5.9                  
19   FY24 Vessel 4,704 121,302 0.00 0.00 5.00 0.25 5.25 0.00 FY23 SPOT 3 2,720 28,000 1.00                                                
20   FY24 ComSur 128 3,000 0.00 0.00 0.00 0.00 0.00 0.50 FY24 LC-130 576 10,380 0.00 2.15 FY24 FY24 LC-Tanker 3,643 3 11,445 19 429,400 0.6 417,955 61,464 18.4 55,200 Year FY23 Capacity FY23 Planned FY24 Capacity FY24 Planned FY25 Capacity FY25 Planned FY26 Capacity FY26 Planned FY27 Capacity FY27 Planned
21   FY25 Vessel 1,022 12,362 0.00 0.25 3.00 0.00 3.25 0.00 FY24 SPOT 1 4,119 56,900 2.00                           Vessel South (TEU) 18 6.25 as needed 5.25 as needed 3.25 n/a n/a n/a n/a
22   FY25 ComSur 2,953 37,553 0.00 0.00 0.00 0.00 0.00 8.75 FY24 SPOT 2 0 0 0.00                           Vessel North (TEU) n/a - 17 0.5 (EST) 50 0.5 (EST) 17 - 50 TBD
23   FY26 Vessel 0 0 0.00 0.00 0.00 0.00 0.00 0.00 FY24 SPOT 3 0 0 0.00                           LC-130: Hours/Flights - Cargo [lbs] 12/2 0/0-0 114/19 3.54/0.6-11,445 60/10 11.8/2-43,103 42/7 21.24/3.6-73,939 36/6 TBD
24   FY26 ComSur 4,958 62,549 0.00 0.00 0.00 0.00 0.00 16.56 FY25 LC-130 3,145 39,553 0.00 9.25 FY25 FY25 LC-Tanker 20,551 10 43,103 10 226,000 2.0 182,897 26,897 8.0 24,000 LC-130: Hours/Flights - Fuel [gallons] 11.8/2-6,000 0/18.4-55,200 47.2/8-24,000   20.06/3.4-10,200   TBD
25   Total 40,483 528,436 0.00 0.25 13.75 0.75 14.75 26.58 FY25 SPOT 1 5,055 56,143 2.90                           SPOT-1 (Sleds/Weights, lbs) 3/180,000 3/21,601 3/180,000 2/56,900 3/180,000 2.9/56,143 3/180,000 2.5/110,362 3/180,000 TBD
26                     FY25 SPOT 2 1,120 16,302 0.45                           SPOT-2 (Sleds/Weights, lbs) 3/180,000 3/109,405 3/180,000 0/0 3/180,000 0.45/16,302 3/180,000 0/0 3/180,000 TBD
27                     FY25 SPOT 3 0 0 0.00                           SPOT-3 (Sleds/Weights, lbs) 3/180,000 1/28,000 3/180,000 0/0 3/180,000 0/0 3/180,000 3/46,791 R 3/180,000 TBD
28   Total Vessel 11,196 207,296             FY26 LC-130 5,438 67,549 0.00 17.56 FY26 FY26 LC-Tanker 71,167 18 73,939 7 158,200 3.6 84,261 353 3.4 10,161 Pole Population (Nov-Jan) 0 0 11 11 21 21 46 46 4 TBD
29   Total ComSur 8,041 103,112             FY26 SPOT 1 3,934 110,362 2.50                                                
30                     FY26 SPOT 2 0 0 0.00                           without flight hours                    
31                     FY26 SPOT 3 0 0 0.00                           Year FY23 Capacity FY23 Planned FY24 Capacity FY24 Planned FY25 Capacity FY25 Planned FY26 Capacity FY26 Planned FY27 Capacity FY27 Planned
32                     Total 40,483 528,436 14.85 28.96 Total Total 95,361 31 128,487 38   6 730,313 95,361 32 95,361 Vessel South (TEU) 18 6.25 as needed 5.25 as needed 3.25 n/a n/a n/a n/a
33                                                       Vessel North (TEU) n/a - 17 0.5 (EST) 50 0.5 (EST) 17 - 50 TBD
34                                                       LC-130: Flights / Cargo [lbs] 2 missions 0/0 19 missions 0.6/11,445 10 missions 2/43,103 7 missions 3.6/73,939 6 missions TBD
35                                                       LC-130: Flights / Fuel [gallons]   2/6,000   18.4/55,200   8/24,000   3.4/10,200   TBD
36                                                       SPOT-1 (Sleds/lbs) 3/180,000 3/21,601 3/180,000 2/56,900 3/180,000 2.9/56,143 3/180,000 2.5/110,362 3/180,000 TBD
37                                                       SPOT-2 (Sleds/lbs) 3/180,000 3/109,405 3/180,000 0/0 3/180,000 0.45/16,302 3/180,000 0/0 3/180,000 TBD
38                                                       SPOT-3 (Sleds/lbs) 3/180,000 1/28,000 3/180,000 0/0 3/180,000 0/0 3/180,000 3/46,791 R 3/180,000 TBD
39                                                       Pole Population (Nov-Jan) 0 0 11 11 21 21 46 46 4 TBD

Back to top


  B C D E F G H I J M N
1 FY23 Intercontinental    
2 Vessel Container Allocation 40F Vessel Container Allocation 40D Vessel Container Allocation 20D Vessel Container Allocation 20F TEU Count C-17 Pallet Allocation COMAIR Pounds COMSUR Pounds TDE + Pallet /463L 355
3 0.00 0.00 5.75 0.50 6.25 0.77 10 gallons/LC-130
4 FY23 Intracontinental    
5 Vessel Container Allocation 40F Vessel Container Allocation 40D Vessel Container Allocation 20D Vessel Container Allocation 20F TEU Count LC-130 Pallet Allocation LC-130 Missions LC-130 Flight Hours SPOT Sled Allocation LC-130 flight hours 5.9
6 n/a n/a n/a n/a n/a 0.00 2 12 7.00    
7 FY24 Intercontinental    
8 Vessel Container Allocation 40F Vessel Container Allocation 40D Vessel Container Allocation 20D Vessel Container Allocation 20F TEU Count C-17 Pallet Allocation COMAIR Pounds COMSUR Pounds    
9 0.00 0.00 5.00 0.25 5.25 0.50 3,000    
10 FY24 Intracontinental    
11 Vessel Container Allocation 40F Vessel Container Allocation 40D Vessel Container Allocation 20D Vessel Container Allocation 20F TEU Count LC-130 Pallet Allocation LC-130 Missions LC-130 Flight Hours SPOT Sled Allocation    
12 n/a n/a n/a n/a n/a 2.15 19 112 2.00    
13 FY25 Intercontinental    
14 Vessel Container Allocation 40F Vessel Container Allocation 40D Vessel Container Allocation 20D Vessel Container Allocation 20F TEU Count C-17 Pallet Allocation COMAIR Pounds COMSUR Pounds    
15 0.00 0.25 3.00 0.00 3.25 8.75 37,553    
16 FY25 Intracontinental    
17 Vessel Container Allocation 40F Vessel Container Allocation 40D Vessel Container Allocation 20D Vessel Container Allocation 20F TEU Count LC-130 Pallet Allocation LC-130 Missions LC-130 Flight Hours SPOT Sled Allocation    
18 n/a n/a n/a n/a n/a 9.25 10 59 3.35    
19 FY26 Intercontinental    
20 Vessel Container Allocation 40F Vessel Container Allocation 40D Vessel Container Allocation 20D Vessel Container Allocation 20F TEU Count C-17 Pallet Allocation COMAIR Pounds COMSUR Pounds    
21 0.00 0.00 0.00 0.00 0.00 16.56 62,549    
22 FY26 Intracontinental    
23 Vessel Container Allocation 40F Vessel Container Allocation 40D Vessel Container Allocation 20D Vessel Container Allocation 20F TEU Count LC-130 Pallet Allocation LC-130 Missions LC-130 Flight Hours SPOT Sled Allocation    
24 n/a n/a n/a n/a n/a 17.56 7 41 2.50    
25    
26 Total Intercontinental Movements for project- vessel/air    
27 Total 40F Total 40D Total 20D Total 20F Total TEU Total 463L COMAIR Pounds COMSUR Pounds    
28 0.00 0.25 13.75 0.75 14.75 26.58 103,112    
29 Total Intracontinental Movements for project- LC-130    
30 Total 40F Total 40D Total 20D Total 20F Total TEU Total 463L Total LC-130 Missions Total LC-130 Flight Hours Total SPOT Sleds    
31 n/a n/a n/a n/a n/a 29.0 38 224 14.9    
32                      
33                    

Back to top


  A B C D E F G H I J
1 WBS Retrograde Conveyance Details Contents Outyear Pole Retro On A2 Critical Path? Cube [cf] Weight [lbs]  
2 1.2 Gen2 USAP Air to CHC Gen2 Ship north by station close FY22 Yes 1360 22000  
3 TOTAL       1360 22000
4  
5 WBS Retrograde Conveyance Details Contents Outyear Pole Retro On A2 Critical Path? Cube [cf] Weight [lbs]  
6 1.2 8' container USAP Air + COMSUR Multiple crates - DNF Retrograde components and equipment Ship north by station close FY23 Yes 384 7500  
7 1.2 Misc. science equipment USAP Air + COMSUR Multiple crates - DNF Scientific and test equipment Ship north by station close FY23 Yes 256 4000  
8 TOTAL       640 11500
9                    
10 WBS Retrograde Conveyance Details Contents Outyear Pole Retro On A2 Critical Path? Cube [cf] Weight [lbs]  
11 1.2 8' container USAP Air + COMSUR Multiple crates - DNF Retrograde components and equipment Ship north by station close FY24 Yes 384 7200  
12 1.3-1.6 Misc. science equipment USAP Air + COMSUR Multiple crates - DNF Scientific and test equipment Ship north by station close FY24 Yes 256 4000  
13 TOTAL     640 11200  
14                    
15                    
16 WBS Retrograde Conveyance Details Contents Outyear Pole Retro On A2 Critical Path? Cube [cf] Weight [lbs]  
17 1.2 Drill hose USAP Air + COMSUR Must overwinter in McM - DNDF 13 hose spools: 352 cf / 4800 lbs each Ship north by station close FY25 Yes 4585 62400  
18 1.2 Tools and equipment USAP Air + COMSUR Multiple crates - DNF Retrograde tools and equipment Ship north by station close FY25 No 1360 17000  
19 1.5 Logging winch USAP Air + COMSUR Loan for one season only - Expedite return to IDP IDP supplied logging winch Ship north by station close FY25 with CONUS arrival by April 1, 2025 No 203 3500  
20 1.5 Logging winch control box USAP Air + COMSUR Loan for one season only - Expedite return to IDP - DNF IDP supplied logging winch control box Ship north by station close FY25 with CONUS arrival by April 1, 2025 No 48 400  
21 1.2 Drill heads USAP Air + COMSUR DNF 3 Drill heads Ship north by station close FY25 No 192 1800  
22 1.3-1.6 Misc. science equipment USAP Air + COMSUR Multiple crates - DNF Scientific and test equipment Ship north by station close FY25 No 256 4000  
23 1.3 Spare mDOMs USAP Air + COMSUR 3 pallets 21 mDOMs (3 pallets) No 153 1719  
24 1.3 Spare D-Eggs pallet 1 USAP Air + COMSUR 1 pallet 8 Spare D-Eggs No 84 794  
25 1.3 Spare D-Eggs pallet 2 USAP Air + COMSUR 1 pallet 12 Spare D-Eggs No 117 1169  
26 TOTAL         6998 92782  

Back to top