1. IceCube Institutional Memorandum Of Understanding (MOU)
    2. Scope of Work
  1. University of Delaware
    1. David Seckel
    2. Ph.D Scientists (Faculty Scientist/Post Doc Grads): 8 (5 3 5)
    3. Ph.D. Students:
    4. Computing resources:

Last updated: June 17, 2020



IceCube Institutional Memorandum Of Understanding (MOU)


Scope of Work

 

 

 

Back to top


University of Delaware


David Seckel


Ph.D Scientists (Faculty Scientist/Post Doc Grads): 8 (5 3 5)

 

 

 

 

 

 

 

 

 

Maintenance and Operations
Labor Cat.
Names
WBS L3
Tasks
Funds Source
WBS 2.1
WBS 2.2
WBS 2.3
WBS 2.4
WBS 2.5
WBS 2.6
Grand Total
         
Program Coordination
Detector Maintenance & Operations
Computing & Data Management
Data Processing & Simulation
Software
Calibration
 
 KE
Seckel, David
Administration
Institutional lead
Base Grant, Inst In-Kind
0.10
 
 
 
 
 
0.10
   
InIce calibration
Ice model, DOM noise
           
0.05
0.05
 
SECKEL, DAVID Total    
0.10
       
0.05
0.15
 
Schroeder, Frank
Surface Detectors
Surface detector enhancements
Inst In-Kind
 
0.15
       
0.15
   
Administration
TFT Board
Inst In-Kind
 
0.05
       
0.05
 
SCHROEDER, FRANK Total      
0.20
       
0.20
 
Stanev, Todor
NON-M&O
Atmospheric leptons
Base Grant
             
STANEV, TODOR Total
                 
 
Holder, Jamie
NON-M&O
Coordination with VERITAS/CTA
Inst In-Kind
             
HOLDER, JAMIE Total
                 
 
Evenson, Paul
NON-M&O
Coordinating use of heliospheric dataset
Inst In-Kind
             
 
EVENSON, PAUL Total
 
 
             
 
Gaisser, Tom
NON-M&O
Atmospheric leptons
Emeritus, No cost
             
 
GAISSER, TOM Total
 
 
             
SC
Tilav, Serap
Surface Detectors
Coordinate IceTop Operations
NSF M&O Core
 
0.30
 
 
 
 
0.30
   
Detector Monitoring
Data monitoring
NSF M&O Core
 
0.20
       
0.20
   
Administration
ICC member
NSF M&O Core
0.05
         
0.05
   
Administration
M&O management
NSF M&O

Core

0.05
         
0.05
 
TILAV, SERAP Total
 
 
0.10
0.50
 
 
   
0.60
PO
Soldin, Dennis
Simulation Production
IceCube/IceTop

simulation production

NSF M&O Core
 
 
 
0.15
   
0.15
   
Reconstruction
IceTop reco, Corsika reader
Base Grant
 
 
 
 
0.15
 
0.15
   
Administration
ICC member
Base Grant
0.05
         
0.05
   
Administration
CR-WG co-lead
Base Grant
0.20
         
0.20
   
Online Filter (Pnf)
IceTop Filter
Base Grant
 
0.05
       
0.05
 
SOLDIN, DENNIS Total
 
 
0.25
 0.05
 
0.15
0.15
 
0.60
 
Coleman, Alan
Simulation Software
Simulation of surface enhancements
Inst In-Kind
     
0.20
   
0.20
   
Core Software
Strike team member
Inst In-Kind
       
0.10
 
0.10
COLEMAN, ALAN Total
         
0.20
0.10
 
0.30
GR
Rehman, Abdul
Core Software
Visualization software

(Steamshovel)

Base Grant
 
 
 
 
0.15
 
0.15
   
Simulation Production
Surface radio
Base Grant
     
0.15
   
0.15
 
Binta Amin, Moureen
Online Filter (Pnf)
Including IceTop in ROC consideration
Base Grant
 
0.10
 
     
0.10
   
Surface Detectors
IceTop simulation
Base Grant
     
0.20
   
0.20
 
Paudel, Ek Narayan
Detector Monitoring
Monitoring
Inst In-Kind
 
0.10
 
     
0.10
   
Simulation Production
Surface radio
Inst In-Kind
     
0.10
   
0.10
 
Punsuebsay, Noppodal
Detector Monitoring
Monitoring
Inst In-Kind
 
0.10
 
     
0.10
 
Pan, Yue
Surface Detectors
Radio operations, data management
Inst In-kind
 
0.25
       
0.25
   
Surface Detectors
Radio monitoring
Inst In-kind
 
0.10
       
0.10
   
Surface Detectors
Radio simulations
Inst In-kind
 
0.05
       
0.05
 
UD GR Total
 
 
 
0.70
 
0.45
0.15
 
1.30
UD Total
     
0.45
1.45
 
0.80
0.40
0.05
3.15
 

 

 

 

 

 

 

 

 

 

Upgrade
Labor Cat.
Names
WBS L3
Tasks
Funds Source
WBS 1.1
WBS 1.2
WBS 1.3
WBS 1.4
WBS 1.5
WBS 1.6
Grand Total
         
Project Management
Drilling
Sensors
Comms, Power, Timing
Calibration
Data Systems
 
KE
Seckel, David
Administration
Institutional lead
Inst In-Kind
0.05
 
 
 
 
 
0.05
 
SECKEL, DAVID Total
 
 
0.05
 
 
 
 
 
0.05
EN
Roth, James
Field Season
Equipment survey
NSF
 
0.20
 
 
 
 
0.20
 
ROTH, JAMES Total
 
 
 
0.20
 
 
   
0.20
GR
Punsuebsay, Noppodal
Noise reduction
 
Inst In-Kind
 
 
0.20
     
0.20
 
UD GR Total
 
 
 
 
0.20
     
0.20
UD Total
     
0.05
0.20
0.20
     
0.45
 


 

Faculty:  

David Seckel –   Institutional lead

  Gen-2 R&D Radio, Calibration (80% :: 20% ANITA)

Frank Schroeder –   Development of new surface instrumentation

  (75% :: 25% Auger)

Todor Stanev –   Atmospheric leptons (background calibration) (50%)

Jamie Holder –   Coord. with VERITAS (5% :: 95% CTA/VERITAS)

Paul Evenson –   Solar and heliospheric coordination w/IceTop (20%)

Tom Gaisser –   Atmospheric leptons (background calibration) (Emeritus)

Scientist:  

Serap Tilav -  IceTop data quality, operations; scintillators (100%)

Post-docs:  

Dennis Soldin –  Air shower reconstruction and simulation code. Coordination of IceTop simulations. IceTop filter maintenance. CR-WG co-lead. (100%)

Alan Coleman –   Simulation, surface layout optimization, r econstruction with radio and scintillator surface enhancements (100%)

 


Ph.D. Students:

Abdul Rehman –    Surface radio simulations, visualization  

Moureen Binte Amin –  IceTop simulation, IceTop real time data

Ek Narayan Paudel –  Data monitoring shift; surface radio simulations

Noppodal Punsuebsay –  Data monitoring shift; TBD

Yue Pan -    In-Ice Radio: operations, data management, simulation


Computing resources:


The Bartol Research Institute maintains a modest cluster (272 cores, 800 GB RAM, 90TB storage) for particle astrophysics, which is used primarily for simulation (CORSIKA) production of air showers and development of simulations for the enhanced surface instrumentation (scintillators, radio). This year, the UD IceCube group is investing in three nodes in the UD central computing cluster, with 20 cores and 192 GB per node.

Back to top


Page 1 of 3