1. Computing Resources:

September 13, 2019


IceCube Institutional Memorandum Of Understanding (MOU)

 

Michigan State University

Tyce DeYoung

Ph.D Scientists (Faculty Scientist/Post Doc Grads): 8 (5 3 9)

Scope of Work

Maintenance and Operations
 
Labor Cat.
Names
WBS L3
Tasks
Funds Source
WBS 2.1
WBS 2.2
WBS 2.3
WBS 2.4
WBS 2.5
WBS 2.6
Grand Total
 
         
Program Coordination
Detector Maintenance & Operations
Computing & Data Management
Data Processing & Simulation
Software
Calibration
   
KE
DeYOUNG, TYCE
Education & Outreach
Outreach
Base Grants
0.05
         
0.05
 
   
Administration
Executive committee
Inst. In-Kind
0.05
         
0.05
 
 
DeYOUNG, TYCE Total  
 
0.10
         
0.10
 
 
GRANT, DARREN
Administration
Collaboration Spokesperson
Inst. In-Kind
0.50
         
0.50
 
   
Administration
Executive committee
Inst. In-Kind
0.20
         
0.20
 
   
Education & Outreach
Outreach
Inst. In-Kind
0.05
         
0.05
 
GRANT, DARREN Total
0.75
         
0.75
 
 
KOPPER, CLAUDIO
Reconstruction
IceTray framework maintenance
Inst. In-Kind
       
0.05
 
0.05
 
   
Reconstruction
Maintenance of clsim photon propagation tool
Inst. In-Kind
       
0.10
 
0.10
 
   
Online Filter (P&F)
Diffuse WG co-chair
Inst. In-Kind
 
0.25
       
0.25
 
   
Offline Data Production
Offline Processing Support / pass2
Inst. In-Kind
     
0.10
   
0.10
 
   
Simulation Production
GPU computing resources
Inst. In-Kind
     
0.05
   
0.05
 
   
Education & Outreach
IceCube MasterClass
Inst. In-Kind
0.10
         
0.10
 
KOPPER, CLAUDIO Total
0.10
0.25
 
0.15
0.15
 
0.65
 
 
TOLLEFSON, KIRSTEN
                     
TOLLEFSON, KIRSTEN Total
           
0.00
 
 
MAHN, KENDALL
Simulation Software
Integration/development of GENIE for low energy systematics
Inst. In-Kind
       
0.05
 
0.05
 
 
MAHN, KENDALL Total  
 
       
0.05
 
0.05
 
PO
NISA, MEHR
Detector calibration
In-situ DOM sensitivity / angular response calibration from muon neutrinos
Inst. In-Kind
         
0.10

 

0.10
 
   
Detector monitoring
Monitoring shift
Inst. In-Kind
 
0.03
       
0.03
 
NISA, MEHR Total
 
0.03
     
0.10
0.13
 
 
CLARK, BRIAN
Distributed Computing Resources
IceProd site manager at MSU HPCC
NSF AAPF Fellowship
   
0.10
     
0.10
 
CLARK, BRIAN Total
   
0.10

 

     
0.10
 
 
HALLIDAY, ROBERT
Distributed Computing Resources
IceProd site manager at MSU HPCC
NSF M&O Core
   
0.25
     
0.25
 
 
HALLIDAY, ROBERT Total  
 
   
0.25
     
0.25
 
GR 
NEER, GARRETT
Detector calibration
In-situ DOM sensitivity / angular response calibration from muon neutrinos
Inst. In-Kind
         
0.10
0.10
 
NEER, GARRETT Total
         
0.10
0.10
 
 
NOWICKI, SARAH
                     
NOWICKI, SARAH Total
 
 
           
0.00
 
 
RYSEWYCK CANTU, DEVYN
Education & Outreach
IceCube Masterclass
Inst. In-Kind
0.05
         
0.05
 
RYSEWYCK CANTU, DEVYN Total

 

 
0.05
         
0.05
 
 
SANCHEZ HERRERA, SEBASTIAN
                     
SANCHEZ HERRERA, SEBASTIAN Total
           
0.00
 
 
MICALLEF, JESSIE
Education & Outreach
IceCube Masterclass
NSF Grad Fellowship
0.05
         
0.05
 
   
Core Software
Software strike team / CLSim development and maintenance
NSF Grad Fellowship
       
0.20
 
0.20
 
MICALLEF, JESSIE Total
 
 
0.05
     
0.20
 
0.25
 
 
PEISKER, ALISON
                   
PEISKER, ALISON Total
               
 
HARNISCH, ALEXANDER
                   
HARNISCH, ALEXANDER Total
                 
 
TWAGIRAYEZU, JEAN PIERRE
                   
TWAGIRAYEZU, JEAN PIERRE
                 
 
LE, HIEU
Detector calibration
In-situ DOM sensitivity / angular response calibration from muon neutrinos
Inst. In-Kind
         
0.20
0.20
 
LE, HIEU
           
0.20
0.20
MSU Total
 
 
1.05
0.28
0.35
0.15
0.40
0.40
2.63
 

 

 

 

 

 

 

 

IceCube Upgrade
 
Labor Cat.
Names
WBS L3
Tasks
Funds Source
WBS 1.1
WBS 1.2
WBS 1.3
WBS 1.4
WBS 1.5
WBS 1.6
Grand Total
 
         
Project Management
Drilling
Sensors
Comms, Power, Timing
Calibration
Data Systems
   
KE
DeYOUNG, TYCE
CPT Management
Management
NSF / Inst. In-Kind
     
0.50
   
0.50
 
 
DeYOUNG, TYCE Total
 
 
     
0.50
   
0.50
 
 
GRANT, DARREN
mDOMs
MSU mDOM production facility
Inst. In-Kind
   
0.25
     
0.25
 
 
GRANT, DARREN Total
 
 
   
0.25
     
0.25
 
EN
NG, CHRISTOPHER
Downhole Cable Assemblies
Penetrator Cable Assemblies, Main cable mechanical/ string hardware
NSF
     
0.75
   
0.75
 
   
Northern Test System
Design, set up and maintain NTS
NSF
     
0.25
   
0.25
 
NG, CHRISTOPHER Total
     
1.00
   
1.00
 
 
FERGUSON, BRIAN
Downhole Cable Assemblies
Main cable electrical, procurement support
NSF
     
0.25
   
0.25
 
 
FERGUSON, BRIAN Total
 
 
     
0.25
   
0.25
 
PO 
HALLIDAY, ROBERT
Downhole cable assemblies
Engineering support
Inst. In-kind
     
0.25
   
0.25
 
HALLIDAY, ROBERT Total
 
 
     
0.25
   
0.25
MSU Total
 
 
 
   
0.25
2.00
   
2.25
 

 

Faculty:

Tyce DeYoung (IL) – ExecCom, outreach, Upgrade L2 for CPT, 100% IceCube

Darren Grant – Spokesperson, outreach, Upgrade DOM production 100% IceCube

Claudio Kopper – Diffuse WG co-convener, software development, offline processing support, outreach, 100% IceCube

Kirsten Tollefson – 50% IceCube (50% HAWC)

Kendall Mahn – low energy systematics/GENIE, 5% IceCube (95% DUNE, T2K)

Scientists and Engineers:

Chris Ng – engineering support for Upgrade WBS 1.3, 1.4, 100% IceCube

         Brian Ferguson – engineering support for Upgrade WBS 1.4, 25% IceCube

Post Docs:

Mehr Nisa   DOM response/simulation calibration using neutrino-induced muons, monitoring shifts, 50% IceCube (50% HAWC)

  Thesis/Analysis topics: galaxy cluster search, Galactic sources search

Robert Halliday  IceProd and distributed computing support, Upgrade cable design/engineering support, NTS timing support, 100% IceCube

  Thesis/Analysis topics: multi-flavor source searches

Brian Clark  (funded by NSF AAPF) IceProd and distributed computing support, 75% IceCube (25% ARA)

 Thesis/Analysis topics: diffuse spectrum measurement, EHE neutrino searches

Ph.D. Students:

Garrett Neer  DOM response/simulation calibration using neutrino-induced muons, 100% IceCube

  Thesis/Analysis topics: dark matter search using LE contained events

Sarah Nowicki  100% IceCube

  Thesis/Analysis topics: DirectReco event reconstruction, atmospheric muon neutrino measurements

Devyn Rysewyk Cantu

  Thesis/Analysis topics: Extended Galactic source search, IceACT R&D

Sebastian Sanchez Herrera

  Thesis/Analysis topics: Anti-neutrino tagging at low energy using Michel electrons

Jessie Micallef  (funded by NSF Grad Fellowship) Core Software: Software strike team / CLSim development and maintenance, IceCube Masterclass

  Thesis/Analysis topics: Next-generation oscillation analysis

Alison Peisker  (funded by NSF Grad Fellowship) 30% IceCube (70% HAWC)

  Thesis/Analysis topics: HAWC/IceCube transient searches

Alexander Harnisch 100% IceCube

  Thesis/Analysis topics: TBD

Jean Pierre Twagirayezu 100% IceCube

  Thesis/Analysis topics: TBD

Hieu Le  DOM response/simulation calibration using neutrino-induced muons, 100% IceCube

  Thesis/Analysis topics: TBD

 

 

 

Computing Resources:
 

2019
  CPU Cores GPU Cards
IceCube 750 100  

 
 

The Michigan State IceCube group provides the collaboration access to several large computing clusters maintained and administered by the Michigan State High Performance Computing Cluster in the Institute for Cyber-Enabled Research. The HPCC includes more 21,716 computing cores and 478 GPUs (mix of Tesla V100, K80, and K20). The IceCube group has purchased 750 cores and 8 GPUs in the cluster.

Cluster scheduling policy allows opportunistic use of all compute resources by campus users with job lengths <4 hours. Jobs making use of specialized resources, such as GPUs, have priority over all other jobs queued for those nodes. When appropriate jobs are available from IceProd servers, average (peak) resource allocations of 1000 (3000) CPU cores and 150 (300) GPUs have been obtained.

A new compute environment was rolled out on HPCC in 2018 and we have not yet completed the process of adapting our local scripts to the new environment. The pledge represents a conservative estimate of resource allocation available to IceProd jobs of less than 4 hours duration once that process is complete.


 

 