1. IceCube Institutional Memorandum Of Understanding (MOU)
    2. Scope Of Work
  1. Universität Dortmund
    1. Wolfgang Rhode
    2. Faculty:
    3. Scientists and Postdocs:
    4. PhD Students (100% IceCube):
    5. General:
    6. Computing Resources:

Last updated: May 4, 2018



IceCube Institutional Memorandum Of Understanding (MOU)


Scope Of Work

  

Back to top


Universität Dortmund


Wolfgang Rhode

Ph.D Scientists (Faculty Scientist/Post Doc Grads) : 2 (1 1 5)

 

 

Labor Cat.
Names
WBS L3
Tasks
WBS 2.1
WBS 2.2
WBS 2.3
WBS 2.4
WBS 2.5
WBS 2.6
Grand Total
       
Program Coordination
Detector Maintenance & Operations
Computing & Data Management
Data Processing & Simulation
Software
Calibration
 
SC RUHE, TIM Online Filter (Pnf) Physics filters  
 0.20
       
0.20
  RUHE, TIM Total    
 0.20
       
0.20
GR DTMD GR Detector Monitoring Detector Monitoring  
0.03
       
0.03
  WERTHEBACH, JOHANNES Simulation Software PROPOSAL-IceProd integration and maintenance/support  
 
   
0.50
 
0.50
  HOINKA, TOBIAS Simulation Production Simulation production site manager at Dortmund      
0.30
   
0.30
  SOEDINGREKSO,
JAN
Simulation Software PROPOSAL-IceProd
Integration and optimization
       
0.50
 
0.50
  MEIER,
MAXIMILIAN
Online Filter (Pnf) Physics Filters  
0.20
       
0.20
  HÜNNEFELD,
MIRKO
Online Filter Reconstruction  
0.30
       
0.30
  Ph.D. Students Total    
0.53
 
0.30
1.00
 
1.83
DTMND Total      
0.73
 
 0.30
1.00
 
2.03
 


Faculty:

Wolfgang Rhode


Scientists and Postdocs:

Tim Ruhe Filtering WBS 2.4 with 0.2 FTE

Analysis topics: Machine learning and two dimensional unfolding of various signals

 


PhD Students (100% IceCube):


 

Mirco Hünnefeld à Online Reconstruction WBS 2.4 with 0.3 FTE

Thesis/Analysis topics: Energy and direction reconstruction with deep neural networks.


 
          Tobias Hoinka à Local MC Production WBS 2.3 with 0.3 FTE

Thesis/Analysis topics: Measurement of Pi/K-ratio, maintenance of an atm. neutrino sample.
 
Johannes Werthebach à 2.5 PROPOSAL integration with 0.5 FTE
Thesis/Analysis topics: Unfolding of HE atm. muon spectrum.

 

Jan Soedingrekso à PROPOSAL Optimization and integration WBS 2.4 with 0.5 FTE
Thesis/Analysis Topic: Cross Section Measurements for HE muons

 

Maximilian Meier à Filtering WBS 2.4 with 0.2 FTE
Thesis/Analysis Topics: Machine Learning and high quality sample definition for tau neutrino searches.

 


General:
The Dortmund group uses local resources (LiDO, PhiDO, DGRZR) for IceCube Monte Carlo production.
 


Computing Resources:

2018 2019
  CPU Cores GPU Cards CPU Cores GPU Cards
IceCube 400 (+900) (40) 400 (+900) (40)
PINGU --- --- --- ---
Gen2 --- --- --- ---  

Note: The numbers correspond to the number of CPUs/GPUs that should be available for IceCube simulation on average. The total number of CPUs is larger by a factor of 10 but has to be shared with other experiments and departments. The numbers in parenthesis correspond to the number of cores, which is available but cannot yet be used for IceCube due to delays in the account administration, but will be available very soon.

Back to top


Dortmund_MoU_SOW_2018.0504