1. IceCube Institutional Memorandum Of Understanding (MOU)
    2. Scope of Work
    3. Scientists and Post Docs:
    4. Students:
    5. General:

Last updated: September 14, 2012

 



IceCube Institutional Memorandum Of Understanding (MOU)


Scope of Work

 

Labor Cat.
Names
WBS L3
Tasks
WBS 2.1
WBS 2.2
WBS 2.3
WBS 2.4
WBS 2.5
Grand Total

       
Program Management
Detector Maintenance & Operations
Computing & Data Management
Triggering & Filtering
Data Quality, Reconstruction & Simulation Tools
 
 

PO OSU PO Detector Monitoring Monitoring shifts    
0.02
           
0.02

        Education & Outreach Outreach
0.05
               
0.05

    OSU PO Total    
0.05
0.02
         
0.07

  ROTT, CARSTEN Physics Filters WIMP WG Co-Lead      
0.25
 
0.25

      Detector Monitoring Maintain good run list    
0.10
           
0.10

    ROTT, CARSTEN Total      
0.10
   
0.25
   
0.35

    PFENDNER, CARL Detector Monitoring Maintain good run list    
0.10
           
0.10

                     

    PFENDNER, CARL Total        
0.10
         
0.10

OSU Total        
0.05
0.22
   
0.25
 
0.52

Faculty:

Jim Beatty – 10% IceCube


Scientists and Post Docs:

Carsten Rott – WIMP-wg co-lead, Good Run List, data quality, outreach

Carl Pfendner - Good Run List, data quality

Mike Stamatikos – GRB analysis tools, outreach – 10% IceCube (Swift, Fermi, ISS)


Students:

 

 

 


General:

Procedures and descriptions for the IceCube good run list have been developed by C.Rott. We are maintaining the good run list and perform associated long-term data-quality and stability tasks. We support integration of the good run list into i3live (C. Pfendner). We develop science analysis tools for correlated neutrino searches based upon electromagnetic parameters for each burst (M. Stamatikos).

Our analysis efforts are focused on Dark Matter searches and ultra-high energy neutrinos.

We use the Ohio Supercomputer Center (OSC) for data processing and to production of Monte Carlo event samples.

 

Note: The activities and staffing levels in this MoU are appropriate for the year beginning October 1, 2012.

 