1. IceCube Institutional Memorandum Of Understanding (MOU)
    2. Scope of Work

Last updated: April 20, 2011

 



IceCube Institutional Memorandum Of Understanding (MOU)


Scope of Work

 

Labor Cat.
Names
WBS L3
Tasks
WBS 2.1
WBS 2.2
WBS 2.3
WBS 2.4
WBS 2.5
Grand Total

       
Program Management
Detector Maintenance & Operations
Computing & Data Management
Triggering & Filtering
Data Quality, Reconstruction & Simulation Tools
 
 

KE KöPKE, LUTZ Administration ExecCom member
0.20
       
0.20

    KöPKE, LUTZ Total    
0.20
       
0.20

SC AHRENS, JENS
 
Simulation Production Simulation Production    
0.15
   
0.15

    AHRENS, JENS Total        
0.15
   
0.15

GR KROLL, GöSTA SuperNova Operations SuperNova Operations  
0.50
     
0.50

    KROLL, GöSTA Total      
0.50
     
0.50

  SCHATTO, KAI Reconstruction tools PPC based tables        
0.30
0.30

      Detector Monitoring Monitoring IceCube Live integration  
0.10
     
0.10

    SCHATTO, KAI Total      
0.10
   
0.30
0.40

  WIEBE, KlAUS Data Quality Checking the low energy level 2 filter        
0.20
0.20

    Simulation Production Simulation Production    
0.20
   
0.20

    WIEBE, KLAUS Total        
0.20
 
0.20
0.40

    UM GR Detector Monitoring Detector Monitoring  
0.05
     
0.05

    UM GR Total      
0.05
     
0.05

UM Total        
0.20
0.65
0.35
 
0.50
1.70

Faculty:    Lutz Köpke    – ExecCom member

Students:    Gösta Kroll    – SN DAQ

Jan Lünemann  – reconstruction tools

Kai Schatto    – Monitoring integration IceCube Live, PPC tables

Klaus Wiebe    – simulation production, Filtering

(Florian Rothmaier - close to PHD submission)

Volker Baum (from Aug. 11) – SN DAQ

Central Computing: Jens Ahrens – maintenance of Grid-Cluster

Back to top


Page 1 of 1

Document-57694_Version-86650_application-msword_0