1. ChangeLog
  2. Contingencies
  3. Info
  4. ByWBS
  5. CostDatabase
  6. PY5 1030 - UW
  7. PY6 1030 - UW
  8. PY7 1030 - UW
  9. PY8 1030 - UW

  A B C D
1 Rev Date Author(s) Comments
2 - 5/24/2022 VO Initial version from Smartsheet
3 1 5/24/2022 VO
4 2 6/23/2022 VO
5 3 7/11/2022 KH Significant reformat of Master Database for readability and programmatic manipulation; Change budget: Finance -> L. Mercier; Remove PMCS; Add Dash360; Escalate M&S, Travel, Equipment; Add this ChangeLog; Update discrete risk 80%CL amount.
6 4 7/15/2022 KH Dash360 indirect; correct salaries; update discrete risk 80%CL.
7 4.1 7/18/2022 KH Fix discrete risk 80% CL and round to 2 sig figures
8 4.2 7/21/2022 KH Change discrete risk to 90% CL based on NSF comments; update BCA costs based on PDR 7/18/22; update PDOM FAT generic labor -> Wendt; update IDP winch generic labor -> Tosi
9 4.3 7/22/2022 KH Risk CL is 80% to agree with final risk evaluation document as submitted and frozen for ICER
10
11
12
13
14

Back to top


  A B C D
1 Code RangeL RangeH Midpoint
2 C1 3.0% 15.0% 9.0%
3 C2 5.0% 20.0% 12.5%
4 C3 10.0% 30.0% 20.0%
5 C4 20.0% 50.0% 35.0%
6 C5 40.0% 60.0% 50.0%
7 C6 60.0% 80.0% 70.0%

Back to top


  A B C D E F H I J K L M N
1 Escalation Table Contingency Table    
2 Type PY4 PY5 PY6 PY7 PY8 Contingency Category PY5 PY6 PY7 PY8 Total  
3 Labor Hours 100% 102% 104% 107% 109% EU Direct $ 623,794 $ 432,550 $ 379,729 $ 250,231 $ 1,686,304  
4 Travel 100% 102% 104% 107% 109% EU Indirect $ 121,254 $ 99,909 $ 88,596 $ 45,120 $ 354,879  
5 M & S 100% 102% 104% 107% 109% EU Direct % 83.7% 81.2% 81.1% 84.7%  
6 CapEx 100% 102% 104% 107% 109% EU Indirect % 16.3% 18.8% 18.9% 15.3% Total Discrete
7 Services 100% 100% 100% 100% 100% Discrete Risk Total $ 340,000 $ 1,360,000 $ 680,000 $ 340,000 $ 2,720,000 $ 2,720,000
8             Discrete Risk Direct $ 284,666 $ 1,104,813 $ 551,360 $ 288,059 $ 2,228,899  
9             Discrete Risk Indirect $ 55,334 $ 255,187 $ 128,640 $ 51,941 $ 491,101  
10             Contingency Direct $ 908,460 $ 1,537,363 $ 931,089 $ 538,290 $ 3,915,203  
11             Contingency Indirect $ 176,588 $ 355,096 $ 217,235 $ 97,060 $ 845,980  
12                          
13             Project Cost Overview
14               PY5 PY6 PY7 PY8 TOTAL  
15             Base $ 5,309,870 $ 4,295,967 $ 4,336,434 $ 2,777,675 $ 16,719,946  
16             Base + Contingency $ 6,394,918 $ 6,188,426 $ 5,484,758 $ 3,413,026 $ 21,481,128  
17             EU Fraction 14.0% 12.4% 10.8% 10.6% 12.2%  
18             Discrete Fraction 6.4% 31.7% 15.7% 12.2% 16.3%  
19           Total Contingency Fraction 20.4% 44.1% 26.5% 22.9% 28.5%  

Back to top


  A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
1 WBS TOTAL UW MSU PSU UA UMD
2 L2 L3 PY5 PY6 PY7 PY8 PY5 PY6 PY7 PY8 PY5 PY6 PY7 PY8 PY5 PY6 PY7 PY8 PY5 PY6 PY7 PY8 PY5 PY6 PY7 PY8
3 1.1 1.1.1 $ 696,990 $ 504,741 $ 450,113 $ 221,965 $ 661,293 $ 468,277 $ 412,865 $ 196,600 $ - 0 $ - 0 $ - 0 $ - 0 $ 16,274 $ 16,624 $ 16,981 $ 11,564 $ - 0 $ - 0 $ - 0 $ - 0 $ 19,422 $ 19,840 $ 20,267 $ 13,802
4 1.1 1.1.2 $ 579,901 $ 594,466 $ 619,947 $ 476,873 $ 579,901 $ 594,466 $ 619,947 $ 476,873 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
5 1.1 1.1.3 $ 173,636 $ 139,567 $ 142,568 $ 30,846 $ 173,636 $ 139,567 $ 142,568 $ 30,846 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
6 1.1 1.1.4 $ 35,874 $ 18,323 $ 14,454 $ 2,868 $ 35,874 $ 18,323 $ 14,454 $ 2,868 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
7 1.1 1.1.5 $ 260,930 $ 266,540 $ 229,907 $ 24,717 $ 260,930 $ 266,540 $ 229,907 $ 24,717 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
8 1.1 Total $ 1,747,332 $ 1,523,638 $ 1,456,989 $ 757,270 $ 1,711,635 $ 1,487,174 $ 1,419,741 $ 731,904 $ - 0 $ - 0 $ - 0 $ - 0 $ 16,274 $ 16,624 $ 16,981 $ 11,564 $ - 0 $ - 0 $ - 0 $ - 0 $ 19,422 $ 19,840 $ 20,267 $ 13,802
9 1.2 1.2.1 $ 771,099 $ 648,720 $ 660,174 $ 280,370 $ 771,099 $ 648,720 $ 660,174 $ 280,370 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
10 1.2 1.2.2 $ 18,074 $ 78,878 $ - 0 $ - 0 $ 18,074 $ 78,878 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
11 1.2 1.2.3 $ 60,291 $ 42,847 $ 28,430 $ - 0 $ 60,291 $ 42,847 $ 28,430 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
12 1.2 1.2.4 $ 869,385 $ 152,886 $ 90,439 $ 4,007 $ 869,385 $ 152,886 $ 90,439 $ 4,007 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
13 1.2 1.2.5 $ 35,573 $ 19,625 $ 10,241 $ - 0 $ 35,573 $ 19,625 $ 10,241 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
14 1.2 1.2.6 $ 11,441 $ 47,703 $ - 0 $ - 0 $ 11,441 $ 47,703 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
15 1.2 1.2.7 $ 73,444 $ 43,898 $ 38,127 $ 10,540 $ 73,444 $ 43,898 $ 38,127 $ 10,540 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
16 1.2 1.2.8 $ 144,475 $ 806,810 $ 1,333,606 $ 1,323,376 $ 144,475 $ 806,810 $ 1,333,606 $ 1,323,376 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
17 1.2 1.2.9 $ 148,073 $ 133,847 $ - 0 $ - 0 $ 148,073 $ 133,847 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
18 1.2 1.2.10 $ - 0 $ 1,517 $ 58,628 $ 46,908 $ - 0 $ 1,517 $ 58,628 $ 46,908 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
19 1.2 Total $ 2,131,854 $ 1,976,731 $ 2,219,645 $ 1,665,200 $ 2,131,854 $ 1,976,731 $ 2,219,645 $ 1,665,200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
20 1.3 1.3.1 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
21 1.3 1.3.2 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
22 1.3 1.3.3 $ 156,913 $ 1,596 $ - 0 $ - 0 $ 156,913 $ 1,596 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
23 1.3 1.3.4 $ 54,144 $ 61,994 $ 63,327 $ 37,735 $ 54,144 $ 61,994 $ 63,327 $ 37,735 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
24 1.3 1.3.5 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
25 1.3 Total $ 211,057 $ 63,591 $ 63,327 $ 37,735 $ 211,057 $ 63,591 $ 63,327 $ 37,735 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
26 1.4 1.4.1 $ 511,309 $ 69,749 $ 9,087 $ 57,347 $ - 0 $ - 0 $ - 0 $ - 0 $ 511,309 $ 69,749 $ 9,087 $ 57,347 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
27 1.4 1.4.2 $ 108,992 $ 13,808 $ 36,386 $ 416 $ 70,695 $ 6,022 $ 815 $ 416 $ 38,296 $ 7,786 $ 35,571 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
28 1.4 1.4.3 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
29 1.4 1.4.4 $ 111,280 $ 70,340 $ 23,124 $ 28,026 $ 111,280 $ 67,267 $ 2,569 $ 24,988 $ - 0 $ 3,073 $ 20,555 $ 3,038 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
30 1.4 1.4.5 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
31 1.4 1.4.6 $ 43,812 $ 44,754 $ 45,716 $ 3,460 $ - 0 $ - 0 $ - 0 $ - 0 $ 43,812 $ 44,754 $ 45,716 $ 3,460 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
32 1.4 Total $ 775,393 $ 198,651 $ 114,313 $ 89,249 $ 181,975 $ 73,289 $ 3,384 $ 25,405 $ 593,417 $ 125,362 $ 110,929 $ 63,844 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
33 1.5 1.5.1 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
34 1.5 1.5.2 $ 61,715 $ 57,788 $ - 0 $ - 0 $ 61,715 $ 57,788 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
35 1.5 1.5.3 $ - 0 $ 116,593 $ 194,436 $ 95,976 $ - 0 $ 24,614 $ 6,523 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 91,979 $ 187,913 $ 95,976 $ - 0 $ - 0 $ - 0 $ - 0
36 1.5 1.5.4 $ 31,520 $ 27,533 $ 28,125 $ 2,920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 31,520 $ 27,533 $ 28,125 $ 2,920 $ - 0 $ - 0 $ - 0 $ - 0
37 1.5 Total $ 93,234 $ 201,914 $ 222,561 $ 98,897 $ 61,715 $ 82,402 $ 6,523 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 31,520 $ 119,512 $ 216,038 $ 98,897 $ - 0 $ - 0 $ - 0 $ - 0
38 1.6 1.6.0 $ 50,983 $ 53,568 $ 56,284 $ 22,629 $ - 0 $ 4,390 $ 4,485 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 50,983 $ 49,177 $ 51,799 $ 22,629
39 1.6 1.6.1 $ 246,235 $ 277,076 $ 166,644 $ 94,802 $ 220,196 $ 262,890 $ 152,153 $ 87,401 $ - 0 $ - 0 $ - 0 $ - 0 $ 26,038 $ 14,186 $ 14,491 $ 7,401 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
40 1.6 1.6.2 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
41 1.6 1.6.3 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
42 1.6 1.6.4 $ 781 $ 798 $ 28,717 $ 6,477 $ 781 $ 798 $ 28,717 $ 6,477 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
43 1.6 1.6.5 $ - 0 $ - 0 $ 7,954 $ 5,416 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,954 $ 5,416
44 1.6 Total $ 297,999 $ 331,442 $ 259,599 $ 129,325 $ 220,978 $ 268,079 $ 185,355 $ 93,878 $ - 0 $ - 0 $ - 0 $ - 0 $ 26,038 $ 14,186 $ 14,491 $ 7,401 $ - 0 $ - 0 $ - 0 $ - 0 $ 50,983 $ 49,177 $ 59,753 $ 28,046
45 Total Base $ 5,309,870 $ 4,295,967 $ 4,336,434 $ 2,777,675 $ 4,519,215 $ 3,951,266 $ 3,897,976 $ 2,554,122 $ 593,417 $ 125,362 $ 110,929 $ 63,844 $ 42,312 $ 30,810 $ 31,472 $ 18,965 $ 31,520 $ 119,512 $ 216,038 $ 98,897 $ 70,406 $ 69,017 $ 80,020 $ 41,847
46 Contingency $ 1,085,049 $ 1,892,459 $ 1,148,325 $ 635,351
47 Total NSF $ 6,394,918 $ 6,188,426 $ 5,484,758 $ 3,413,026 $ 21,481,128                                      
48                                                    
49   Rev2 Budget                                        
50 PY5 PY6 PY7 PY8                                        
51 Total Base $ 4,806,291 $ 3,876,967 $ 3,792,746 $ 2,355,621                                        
52 Contingency $ 1,300,998 $ 1,000,079 $ 1,038,379 $ 256,871                                        
53 Total NSF $ 6,107,288 $ 4,877,046 $ 4,831,125 $ 2,612,492 $ 18,427,951                                      
54                                                    
55     Δ                                        
56     PY5 PY6 PY7 PY8                                        
57 Total Base $ 503,579 $ 419,000 $ 543,688 $ 422,054                                        
58 Contingency $ (215,949) $ 892,380 $ 109,946 $ 378,480                                        
59 Total NSF $ 287,630 $ 1,311,380 $ 653,633 $ 800,534 $ 3,053,177                                      
60                                                    
61                                                    
62                                                    

Back to top


  A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS AT AU AV AW AX AY AZ BA BB BC BD BE BF BG BH BI BJ BK BL BM BN BO BP BQ BR BS BT BU BV BW BX BY BZ CA CB CC CD CE CF CG CH CI CJ CK CL CM CN CO CP CQ CR CS CT CU CV CW CX CY CZ DA DB DC DD DE DF DG DH DI DJ DK DL DM DN DO DP DQ DR DS DT DU DV DW DX DY DZ EA EB EC ED EE EF EG EH EI EJ EK EL EM EN EO EP EQ ER
1 WBS L2 L3 Inst Center Schedule Task Name Cost Activity Resource Name Type Subtype Resource ID Estimating Technique Labor Rate Fringe Indirect On/Off Ice ContCode Estimate Uncertainty (EU) Notes PY5 PY6 PY7 PY8 Complete Total PY5-PY8
2 Actual Table % Amount Indirect 1022 1122 1222 0123 0223 0323 0423 0523 0623 0723 0823 0923 PY5HR S1022 S1122 S1222 S0123 S0223 S0323 S0423 S0523 S0623 S0723 S0823 S0923 PY5 Direct PY5 Fringe PY5 Indirect PY5 Total PY5 EU Direct PY5 EU Indirect 1023 1123 1223 0124 0224 0324 0424 0524 0624 0724 0824 0924 PY6HR S1023 S1123 S1223 S0124 S0224 S0324 S0424 S0524 S0624 S0724 S0824 S0924 PY6 Direct PY6 Fringe PY6 Indirect PY6 Total PY6 EU Direct PY6 EU Indirect 1024 1124 1224 0125 0225 0325 0425 0525 0625 0725 0825 0925 PY7HR S1024 S1124 S1224 S0125 S0225 S0325 S0425 S0525 S0625 S0725 S0825 S0925 PY7 Direct PY7 Fringe PY7 Indirect PY7 Total PY7 EU Direct PY7 EU Indirect 1025 1125 1225 0126 0226 0326 0426 0526 0626 0726 0826 0926 PY8HR S1025 S1125 S1225 S0126 S0226 S0326 S0426 S0526 S0626 S0726 S0826 S0926 PY8 Direct PY8 Fringe PY8 Indirect PY8 Total PY8 EU Direct PY8 EU Indirect
3 1.1.1.1 1.1 1.1.1 UW WIPAC Project Administration (B) Project admin - principal investigator Hanson Labor Hours Labor - LoE KE A - Analogy $125 $121 35.00% 53.00% Off Ice C1 9.0% $12,943.26 $4,483.61 12 12 12 12 12 12 12 12 12 12 12 12 144 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 18,441 $ 6,454 $ 13,195 $ 38,091 $ 2,241 $ 1,188 12 12 12 12 12 12 12 12 12 12 12 12 144 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 18,838 $ 6,593 $ 13,479 $ 38,910 $ 2,289 $ 1,213 12 12 12 12 12 12 12 12 12 12 12 12 144 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 19,243 $ 6,735 $ 13,768 $ 39,746 $ 2,338 $ 1,239 12 12 12 12 12 12 12 12 96 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ 1,504 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,104 $ 4,587 $ 9,376 $ 27,067 $ 1,592 $ 844 $143,813.97
4 1.1.1.1 1.1 1.1.1 PSU Project Administration (B) Project admin - Doug Cowen Cowen Labor Hours Labor - LoE KE A - Analogy $120 $116 40.00% 58.05% Off Ice C1 9.0% $5,529.90 $2,031.07 5 5 5 5 5 5 5 5 5 5 5 5 60 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 7,355 $ 2,942 $ 5,977 $ 16,274 $ 927 $ 538 5 5 5 5 5 5 5 5 5 5 5 5 60 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 7,513 $ 3,005 $ 6,106 $ 16,624 $ 947 $ 550 5 5 5 5 5 5 5 5 5 5 5 5 60 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 7,674 $ 3,070 $ 6,237 $ 16,981 $ 967 $ 561 5 5 5 5 5 5 5 5 40 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,226 $ 2,091 $ 4,247 $ 11,564 $ 659 $ 382 $61,443.34
5 1.1.1.1 1.1 1.1.1 UMD Project Administration (B) Project admin - Greg Sullivan Sullivan Labor Hours Labor - LoE KE A - Analogy $159 $116 29.00% 54.50% Off Ice C1 9.0% $6,599.77 $2,328.07 Added by Erik B from UMD 5 5 5 5 5 5 5 5 5 5 5 5 60 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 9,745 $ 2,826 $ 6,851 $ 19,422 $ 1,131 $ 617 5 5 5 5 5 5 5 5 5 5 5 5 60 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 9,955 $ 2,887 $ 6,999 $ 19,840 $ 1,156 $ 630 5 5 5 5 5 5 5 5 5 5 5 5 60 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 10,169 $ 2,949 $ 7,149 $ 20,267 $ 1,181 $ 643 5 5 5 5 5 5 5 5 40 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ 795 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,925 $ 2,008 $ 4,869 $ 13,802 $ 804 $ 438 $73,330.78
6 1.1.1.1 1.1 1.1.1 UW WIPAC Project Administration (B) Project Director-ODell ODell Labor Hours Labor - LoE KE A - Analogy $112 $121 35.00% 53.00% Off Ice C1 9.0% $45,631.82 $15,807.10 60 60 60 60 60 60 60 60 60 60 60 60 720 $ 6,732 $ 6,732 $ 6,732 $ 6,732 $ 6,732 $ 6,732 $ 6,732 $ 6,732 $ 6,732 $ 6,732 $ 6,732 $ 6,732 $ 82,521 $ 28,882 $ 59,044 $ 170,447 $ 10,026 $ 5,314 50 50 50 50 50 50 50 50 50 50 50 50 600 $ 5,610 $ 5,610 $ 5,610 $ 5,610 $ 5,610 $ 5,610 $ 5,610 $ 5,610 $ 5,610 $ 5,610 $ 5,610 $ 5,610 $ 70,246 $ 24,586 $ 50,261 $ 145,093 $ 8,535 $ 4,523 50 50 50 50 50 40 40 40 40 40 40 40 530 $ 5,610 $ 5,610 $ 5,610 $ 5,610 $ 5,610 $ 4,488 $ 4,488 $ 4,488 $ 4,488 $ 4,488 $ 4,488 $ 4,488 $ 63,385 $ 22,185 $ 45,352 $ 130,921 $ 7,701 $ 4,082 30 30 30 30 30 30 30 30 240 $ 3,366 $ 3,366 $ 3,366 $ 3,366 $ 3,366 $ 3,366 $ 3,366 $ 3,366 $ - 0 $ - 0 $ - 0 $ - 0 $ 29,320 $ 10,262 $ 20,978 $ 60,560 $ 3,562 $ 1,888 $507,020.18
7 1.1.1.1 1.1 1.1.1 UW WIPAC Project Administration (B) Project manager-Feyzi Feyzi Labor Hours Labor - LoE KE A - Analogy $97 $121 35.00% 53.00% Off Ice C1 9.0% $73,520.14 $25,467.76 150 150 150 150 150 150 150 150 150 150 150 150 1800 $ 14,592 $ 14,592 $ 14,592 $ 14,592 $ 14,592 $ 14,592 $ 14,592 $ 14,592 $ 14,592 $ 14,592 $ 14,592 $ 14,592 $ 178,869 $ 62,604 $ 127,981 $ 369,453 $ 21,733 $ 11,518 100 100 0 0 50 100 100 100 100 100 100 100 950 $ 9,728 $ 9,728 $ - 0 $ - 0 $ 4,864 $ 9,728 $ 9,728 $ 9,728 $ 9,728 $ 9,728 $ 9,728 $ 9,728 $ 96,433 $ 33,751 $ 68,998 $ 199,182 $ 11,717 $ 6,210 75 75 0 0 50 75 75 75 75 75 75 75 725 $ 7,296 $ 7,296 $ - 0 $ - 0 $ 4,864 $ 7,296 $ 7,296 $ 7,296 $ 7,296 $ 7,296 $ 7,296 $ 7,296 $ 75,176 $ 26,311 $ 53,788 $ 155,275 $ 9,134 $ 4,841 75 75 0 0 50 75 75 75 425 $ 7,296 $ 7,296 $ - 0 $ - 0 $ 4,864 $ 7,296 $ 7,296 $ 7,296 $ - 0 $ - 0 $ - 0 $ - 0 $ 45,016 $ 15,756 $ 32,209 $ 92,980 $ 5,469 $ 2,899 $816,890.40
8 1.1.1.1 1.1 1.1.1 UW WIPAC Project Administration (B) Project Office M&S M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $7,851.80 $2,719.90 1300 1300 1300 1300 1300 1300 1300 1300 1300 1300 1300 1200 0 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,200 $ 15,833 $ - 0 $ 8,392 $ 24,225 $ 1,425 $ 755 1300 1300 1300 1300 1300 1300 1300 1300 1300 1300 1300 1200 0 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,200 $ 16,174 $ - 0 $ 8,572 $ 24,746 $ 1,456 $ 771 1300 1300 1300 1300 1300 1300 1300 1300 1300 1300 1300 1200 0 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,200 $ 16,521 $ - 0 $ 8,756 $ 25,278 $ 1,487 $ 788 1300 1300 1300 1300 1300 1300 0 0 0 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ 1,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 8,493 $ - 0 $ 4,501 $ 12,994 $ 764 $ 405 $87,242.22
9 1.1.1.1 1.1 1.1.1 UW WIPAC Project Administration (B) Project Advisory Panel Reviews - Panel Members Compensation Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $5,949.45 $2,060.92 6-panel members (domestic travel), 3 require some form of payment ~$1,000 each 13800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,097 $ - 0 $ 7,471 $ 21,568 $ 1,269 $ 672 13800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,400 $ - 0 $ 7,632 $ 22,032 $ 1,296 $ 687 13800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,709 $ - 0 $ 7,796 $ 22,505 $ 1,324 $ 702 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $66,104.96
10 1.1.1.1 1.1 1.1.1 UW WIPAC Project Administration (B) PO-Travel Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $6,477.99 $2,244.01 14400 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,400 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,710 $ - 0 $ 7,796 $ 22,506 $ 1,324 $ 702 14400 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,400 $ - 0 $ - 0 $ - 0 $ - 0 $ 15,026 $ - 0 $ 7,964 $ 22,990 $ 1,352 $ 717 14400 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,400 $ - 0 $ - 0 $ - 0 $ - 0 $ 15,349 $ - 0 $ 8,135 $ 23,484 $ 1,381 $ 732 1800 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,960 $ - 0 $ 1,039 $ 2,999 $ 176 $ 93 $71,977.68
11 1.1.1.1 1.1 1.1.1 UW WIPAC Project Administration (B) PO-Travel Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $4,138.75 $1,433.68 9600 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,600 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,806 $ - 0 $ 5,197 $ 15,004 $ 883 $ 468 9600 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,600 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,017 $ - 0 $ 5,309 $ 15,326 $ 902 $ 478 9600 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,600 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,233 $ - 0 $ 5,423 $ 15,656 $ 921 $ 488 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $45,986.06
12 1.1.2.1 1.1 1.1.2 UW WIPAC Project Controls and Finance (B) Financial management - L. Mercier Mercier Labor Hours Labor - LoE MA A - Analogy $44 $46 35.00% 53.00% Off Ice C1 9.0% $22,940.03 $7,946.55 60 60 60 60 60 60 60 60 60 60 60 60 720 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 32,685 $ 11,440 $ 23,386 $ 67,510 $ 3,971 $ 2,105 60 60 60 60 60 60 60 60 60 60 60 60 720 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 33,387 $ 11,686 $ 23,889 $ 68,962 $ 4,057 $ 2,150 60 60 60 60 60 60 60 60 60 60 60 60 720 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 34,105 $ 11,937 $ 24,402 $ 70,444 $ 4,144 $ 2,196 60 60 60 60 60 60 60 60 480 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ 2,666 $ - 0 $ - 0 $ - 0 $ - 0 $ 23,226 $ 8,129 $ 16,618 $ 47,973 $ 2,822 $ 1,496 $254,889.24
13 1.1.2.1 1.1 1.1.2 UW WIPAC Project Controls and Finance (B) Project Controls - Dash360 consultants PMCS Consulting Services Services E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $181,466.84 $62,861.06 Dash360 service agreement (quotation McVeigh 6/23/2022) 27908 27908 27908 27908 27908 27908 27908 27908 27908 27908 27908 27908 0 $ 27,908 $ 27,908 $ 27,908 $ 27,908 $ 27,908 $ 27,908 $ 27,908 $ 27,908 $ 27,908 $ 27,908 $ 27,908 $ 27,908 $ 334,896 $ - 0 $ 177,495 $ 512,391 $ 30,141 $ 15,975 28622.25 28622.25 28622.25 28622.25 28622.25 28622.25 28622.25 28622.25 28622.25 28622.25 28622.25 28622.25 0 $ 28,622 $ 28,622 $ 28,622 $ 28,622 $ 28,622 $ 28,622 $ 28,622 $ 28,622 $ 28,622 $ 28,622 $ 28,622 $ 28,622 $ 343,467 $ - 0 $ 182,038 $ 525,505 $ 30,912 $ 16,383 29929 29929 29929 29929 29929 29929 29929 29929 29929 29929 29929 29929 0 $ 29,929 $ 29,929 $ 29,929 $ 29,929 $ 29,929 $ 29,929 $ 29,929 $ 29,929 $ 29,929 $ 29,929 $ 29,929 $ 29,929 $ 359,152 $ - 0 $ 190,351 $ 549,503 $ 32,324 $ 17,132 40047 40047 40047 40047 40047 40047 40047 0 $ 40,047 $ 40,047 $ 40,047 $ 40,047 $ 40,047 $ 40,047 $ 40,047 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 280,327 $ - 0 $ 148,573 $ 428,900 $ 25,229 $ 13,372 $2,016,298.26
14 1.1.3.1 1.1 1.1.3 UW WIPAC Quality, Safety Management, Document Control Systems (B) Q&A / Safety - Zernick Zernick Labor Hours Labor - LoE MA A - Analogy $61 $46 35.00% 53.00% Off Ice C1 9.0% $43,795.60 $15,171.03 113 113 113 113 113 113 113 113 113 113 113 113 1356 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 84,065 $ 29,423 $ 60,149 $ 173,636 $ 10,214 $ 5,413 113 113 0 0 50 113 113 113 113 113 113 113 1067 $ 6,858 $ 6,858 $ - 0 $ - 0 $ 3,035 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 67,571 $ 23,650 $ 48,347 $ 139,567 $ 8,210 $ 4,351 113 113 0 0 50 113 113 113 113 113 113 113 1067 $ 6,858 $ 6,858 $ - 0 $ - 0 $ 3,035 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 6,858 $ 69,023 $ 24,158 $ 49,386 $ 142,568 $ 8,386 $ 4,445 113 113 0 0 0 0 0 0 226 $ 6,858 $ 6,858 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,934 $ 5,227 $ 10,685 $ 30,846 $ 1,814 $ 962 $486,617.81
15 1.1.4.1 1.1 1.1.4 UW WIPAC Logistics (B) Logistics-Tosi Tosi Labor Hours Labor - LoE SC A - Analogy $47 $52 35.00% 53.00% Off Ice C1 9.0% $6,436.67 $2,229.70 Tosi - 25% 30 30 30 30 30 30 30 30 30 30 30 30 360 $ 1,417 $ 1,417 $ 1,417 $ 1,417 $ 1,417 $ 1,417 $ 1,417 $ 1,417 $ 1,417 $ 1,417 $ 1,417 $ 1,417 $ 17,368 $ 6,079 $ 12,427 $ 35,874 $ 2,110 $ 1,118 15 15 15 15 15 15 15 15 15 15 15 15 180 $ 708 $ 708 $ 708 $ 708 $ 708 $ 708 $ 708 $ 708 $ 708 $ 708 $ 708 $ 708 $ 8,871 $ 3,105 $ 6,347 $ 18,323 $ 1,078 $ 571 14 14 5 0 8 14 14 14 14 14 14 14 139 $ 661 $ 661 $ 236 $ - 0 $ 378 $ 661 $ 661 $ 661 $ 661 $ 661 $ 661 $ 661 $ 6,998 $ 2,449 $ 5,007 $ 14,454 $ 850 $ 451 9 9 0 0 0 9 0 0 27 $ 425 $ 425 $ - 0 $ - 0 $ - 0 $ 425 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,388 $ 486 $ 993 $ 2,868 $ 169 $ 89 $71,518.55
16 1.1.5.1 1.1 1.1.5 UW WIPAC Systems Engineering (B) System Engineering-Sandstrom Sandstrom Labor Hours Labor - LoE SE A - Analogy $64 $55 35.00% 53.00% Off Ice C1 9.0% $29,784.46 $10,317.49 75 75 75 75 75 75 75 75 75 75 75 75 900 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 58,967 $ 20,638 $ 42,191 $ 121,797 $ 7,165 $ 3,797 75 75 75 75 75 75 75 75 75 75 75 75 900 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 4,811 $ 60,235 $ 21,082 $ 43,098 $ 124,415 $ 7,319 $ 3,879 50 50 50 50 50 50 50 50 50 50 50 50 600 $ 3,207 $ 3,207 $ 3,207 $ 3,207 $ 3,207 $ 3,207 $ 3,207 $ 3,207 $ 3,207 $ 3,207 $ 3,207 $ 3,207 $ 41,020 $ 14,357 $ 29,350 $ 84,727 $ 4,984 $ 2,641 0 0 0 0 0 0 0 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $330,938.50
17 1.1.5.1 1.1 1.1.5 UW WIPAC Systems Engineering (B) Technical Coordination-DuVernois DuVernois Labor Hours Labor - LoE SS A - Analogy $73 $66 35.00% 53.00% Off Ice C1 9.0% $40,604.08 $14,065.47 75 75 75 75 75 75 75 75 75 75 75 75 900 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 67,361 $ 23,576 $ 48,197 $ 139,134 $ 8,184 $ 4,338 75 75 75 75 75 75 75 75 75 75 75 75 900 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 68,809 $ 24,083 $ 49,233 $ 142,125 $ 8,360 $ 4,431 75 75 75 75 75 75 75 75 75 75 75 75 900 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 5,495 $ 70,288 $ 24,601 $ 50,291 $ 145,181 $ 8,540 $ 4,526 75 75 0 0 0 0 0 0 150 $ 5,495 $ 5,495 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 11,967 $ 4,188 $ 8,562 $ 24,717 $ 1,454 $ 771 $451,156.50
18 1.2.1.1 1.2 1.2.1 UW WIPAC Implementation Management and Controls EHWD Project Management and Controls (WIPAC_Implementation_Manager) McEwen Labor Hours Labor - LoE SE D - Expert Opinion $61 $55 35.00% 53.00% Off Ice C1 9.0% $76,478.20 $26,492.45 150 150 150 150 150 150 150 150 150 150 150 150 1800 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 111,591 $ 39,057 $ 79,843 $ 230,491 $ 13,558 $ 7,186 150 150 150 150 150 150 150 150 150 150 150 150 1800 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 113,990 $ 39,896 $ 81,560 $ 235,446 $ 13,850 $ 7,340 150 150 150 150 150 150 150 150 150 150 150 150 1800 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 116,441 $ 40,754 $ 83,313 $ 240,508 $ 14,148 $ 7,498 150 150 150 150 150 150 150 1050 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ 9,104 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 69,384 $ 24,284 $ 49,644 $ 143,313 $ 8,430 $ 4,468 $849,757.82
19 1.2.1.2.5.1 1.2 1.2.1 UW PSL 2022-23 Management & Systems Engineering 2022-23 Systems Engineering (Terry Benson) Benson Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $9,515.27 $0.00 Engineering oversight and systems development - coordination and planning, season planning, ASC interface, SIP, logistics coordination, drill procedures, EVMS, seasonal reports 75 75 75 75 75 75 75 75 75 75 75 75 900 $ 8,625 $ 8,625 $ 8,625 $ 8,625 $ 8,625 $ 8,625 $ 8,625 $ 8,625 $ 8,625 $ 8,625 $ 8,625 $ 8,625 $ 105,725 $ - 0 $ - 0 $ 105,725 $ 9,515 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $105,725.25
20 1.2.1.2.5.1 1.2 1.2.1 UW PSL 2022-23 Management & Systems Engineering 2022-23 Management Gibson Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $15,224.44 $0.00 Drill Manager LOE: 0.8 FTE = 1440 hr/yr 120 120 120 120 120 120 120 120 120 120 120 120 1440 $ 13,800 $ 13,800 $ 13,800 $ 13,800 $ 13,800 $ 13,800 $ 13,800 $ 13,800 $ 13,800 $ 13,800 $ 13,800 $ 13,800 $ 169,160 $ - 0 $ - 0 $ 169,160 $ 15,224 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $169,160.40
21 1.2.1.2.5.1 1.2 1.2.1 UW PSL 2022-23 Management & Systems Engineering 2022-23 Systems Engineering Support Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $4,859.13 $0.00 Team meetings - weekly status, reviews, collaboration mtgs, ASC weekly and annual Weekly status mtgs: 35 wks * 1 hr * 12 people = 420 hr
ASC coord: 18 wks * 1 hr * 3 people = 78 hr
Total = 558 hr
38.3 38.3 38.3 38.3 38.3 38.3 38.3 38.3 38.3 38.3 38.3 38.3 459.6 $ 4,405 $ 4,405 $ 4,405 $ 4,405 $ 4,405 $ 4,405 $ 4,405 $ 4,405 $ 4,405 $ 4,405 $ 4,405 $ 4,405 $ 53,990 $ - 0 $ - 0 $ 53,990 $ 4,859 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $53,990.36
22 1.2.1.2.5.2 1.2 1.2.1 UW PSL Drill Procedure Review Drill Procedure Review Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $4,111.54 $0.00 1 hr session/wk * 35 wks each year
8 people = 280 hr/yr
46 47 47 47 47 46 280 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,290 $ 5,405 $ 5,405 $ 5,405 $ 5,405 $ 5,290 $ 32,892 $ - 0 $ - 0 $ 32,892 $ 4,112 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $32,892.30
23 1.2.1.2.5.3 1.2 1.2.1 UW PSL Drill Hole Modeling Drill Hole Modeling Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $1,174.73 $0.00 Hole modeling = 120 hr/yr 40 40 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ 4,600 $ - 0 $ - 0 $ 9,398 $ - 0 $ - 0 $ 9,398 $ 1,175 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,397.80
24 1.2.1.2.6.1 1.2 1.2.1 UW PSL 2023-24 Management & Systems Engineering 2023-24 Management & Systems Engineering Benson Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $6,473.42 $0.00 Engineering oversight and systems development 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 66.6 66.6 66.6 66.6 66.6 66.6 66.6 66.6 66.6 599.4 $ 7,659 $ - 0 $ - 0 $ - 0 $ 7,659 $ 7,659 $ 7,659 $ 7,659 $ 7,659 $ 7,659 $ 7,659 $ 7,659 $ 71,927 $ - 0 $ - 0 $ 71,927 $ 6,473 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $71,926.90
25 1.2.1.2.6.1 1.2 1.2.1 UW PSL 2023-24 Management & Systems Engineering 2023-24 Management Gibson Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $10,361.36 $0.00 Drill Manager LOE: 0.8 FTE = 1440 hr/yr 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 106.6 106.6 106.6 106.6 106.6 106.6 106.6 106.6 106.6 959.4 $ 12,259 $ - 0 $ - 0 $ - 0 $ 12,259 $ 12,259 $ 12,259 $ 12,259 $ 12,259 $ 12,259 $ 12,259 $ 12,259 $ 115,126 $ - 0 $ - 0 $ 115,126 $ 10,361 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $115,126.23
26 1.2.1.2.6.1 1.2 1.2.1 UW PSL 2023-24 Management & Systems Engineering 2023-24 Systems Engineering Support Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $3,974.34 $0.00 Team meetings - weekly status, reviews, collaboration mtgs, ASC weekly and annual
Weekly status mtgs: 35 wks * 1 hr * 12 people = 420 hr
ASC coord: 18 wks * 1 hr * 3 people = 54 hr
Total = 1914 hr
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 41 41 41 41 41 41 41 41 368 $ 4,600 $ - 0 $ - 0 $ - 0 $ 4,715 $ 4,715 $ 4,715 $ 4,715 $ 4,715 $ 4,715 $ 4,715 $ 4,715 $ 44,159 $ - 0 $ - 0 $ 44,159 $ 3,974 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $44,159.32
27 1.2.1.2.6.2 1.2 1.2.1 UW PSL PY6 Season Debrief PY6 Season Debrief Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $1,799.97 $0.00 Season Debrief - 30 people, hybrid, 4 hr = 120 hr 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 120 120 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,400 $ - 0 $ - 0 $ 14,400 $ 1,800 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,399.78
28 1.2.1.2.6.3 1.2 1.2.1 UW PSL Drill Procedure Review Drill Procedure Review Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $3,359.95 $0.00 1 hr session/wk * 35 wks each year
8 people = 280 hr/yr
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 37 37 38 38 37 37 224 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,255 $ 4,255 $ 4,370 $ 4,370 $ 4,255 $ 4,255 $ 26,880 $ - 0 $ - 0 $ 26,880 $ 3,360 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $26,879.59
29 1.2.1.2.6.5 1.2 1.2.1 UW PSL Drill Hole Modeling Drill Hole Modeling Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $1,199.98 $0.00 Hole modeling = 120 hr/yr 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 40 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ 4,600 $ - 0 $ - 0 $ 9,600 $ - 0 $ - 0 $ 9,600 $ 1,200 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,599.85
30 1.2.1.2.7.1 1.2 1.2.1 UW PSL 2024-25 Management & Systems Engineering 2024-25 Management & Systems Engineering Benson Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $6,612.60 $0.00 System engineering oversight and systems development 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 66.6 66.6 66.6 66.6 66.6 66.6 66.6 66.6 66.6 599.4 $ 7,659 $ - 0 $ - 0 $ - 0 $ 7,659 $ 7,659 $ 7,659 $ 7,659 $ 7,659 $ 7,659 $ 7,659 $ 7,659 $ 73,473 $ - 0 $ - 0 $ 73,473 $ 6,613 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $73,473.32
31 1.2.1.2.7.1 1.2 1.2.1 UW PSL 2024-25 Management & Systems Engineering 2024-25 Management Gibson Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $10,584.13 $0.00 Drill Manager LOE: 0.8 FTE = 1440 hr/yr 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 106.6 106.6 106.6 106.6 106.6 106.6 106.6 106.6 106.6 959.4 $ 12,259 $ - 0 $ - 0 $ - 0 $ 12,259 $ 12,259 $ 12,259 $ 12,259 $ 12,259 $ 12,259 $ 12,259 $ 12,259 $ 117,601 $ - 0 $ - 0 $ 117,601 $ 10,584 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $117,601.45
32 1.2.1.2.7.1 1.2 1.2.1 UW PSL 2024-25 Management & Systems Engineering 2024-25 Systems Engineering Support Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $4,059.79 $0.00 Team meetings - weekly status, reviews, collaboration mtgs, ASC weekly and annual Weekly status mtgs: 35 wks * 1 hr * 12 people = 420 hr
ASC coord: 18 wks * 1 hr * 3 people = 54 hr
Total = 1914 hr
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 41 41 41 41 41 41 41 41 368 $ 4,600 $ - 0 $ - 0 $ - 0 $ 4,715 $ 4,715 $ 4,715 $ 4,715 $ 4,715 $ 4,715 $ 4,715 $ 4,715 $ 45,109 $ - 0 $ - 0 $ 45,109 $ 4,060 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $45,108.75
33 1.2.1.2.7.2 1.2 1.2.1 UW PSL PY7 Season Debrief PY7 Season Debrief Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $1,838.67 $0.00 Season Debrief - 30 people, hybrid, 4 hr = 120 hr 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 120 120 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,709 $ - 0 $ - 0 $ 14,709 $ 1,839 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,709.37
34 1.2.1.2.7.3 1.2 1.2.1 UW PSL Drill Procedure Review Drill Procedure Review Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $3,432.19 $0.00 1 hr session/wk * 35 wks each year
8 people = 280 hr/yr
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 37 37 38 38 37 37 224 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,255 $ 4,255 $ 4,370 $ 4,370 $ 4,255 $ 4,255 $ 27,457 $ - 0 $ - 0 $ 27,457 $ 3,432 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $27,457.50
35 1.2.1.2.7.5 1.2 1.2.1 UW PSL Drill Hole Modeling Drill Hole Modeling Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $1,225.78 $0.00 Hole modeling = 120 hr/yr 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 40 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ 4,600 $ - 0 $ - 0 $ 9,806 $ - 0 $ - 0 $ 9,806 $ 1,226 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,806.25
36 1.2.1.2.7.6 1.2 1.2.1 UW PSL Drill Readiness Review (PSL) Drill Readiness Review (PSL) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $2,941.87 $0.00 12 Engineers 2 days @ 8 hrs = 192 hr 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 192 192 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 22,080 $ - 0 $ - 0 $ 23,535 $ - 0 $ - 0 $ 23,535 $ 2,942 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $23,535.00
37 1.2.1.2.8.1 1.2 1.2.1 UW PSL 2025-26 Management & Systems Engineering 2025-26 Systems Engineering Benson Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $3,042.69 $0.00 System Engineer - Oct (pre-deployment) & March/April for closeout. On-ice hours captured in Field Seasons. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 67.5 67.5 67.5 67.5 270 $ 7,763 $ - 0 $ - 0 $ - 0 $ 7,763 $ 7,763 $ 7,763 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 33,808 $ - 0 $ - 0 $ 33,808 $ 3,043 $ - 0 $33,807.66
38 1.2.1.2.8.1 1.2 1.2.1 UW PSL 2025-26 Management & Systems Engineering 2025-26 Management Gibson Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $4,056.92 $0.00 Drill Manager LOE: Oct (pre-deployment) & March/April for closeout. On-ice hours captured in Field Seasons. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 120 120 120 360 $ 13,800 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,800 $ 13,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 45,077 $ - 0 $ - 0 $ 45,077 $ 4,057 $ - 0 $45,076.88
39 1.2.1.2.8.1 1.2 1.2.1 UW PSL 2025-26 Management & Systems Engineering 2025-26 Systems Engineering Support Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $2,704.61 $0.00 Engineering support hours for weekly status meeting & off-ice engineering support 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 100 100 240 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ 11,500 $ 11,500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 30,051 $ - 0 $ - 0 $ 30,051 $ 2,705 $ - 0 $30,051.25
40 1.2.1.2.8.2 1.2 1.2.1 UW PSL PY8 Season Debrief PY8 Season Debrief Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $1,878.20 $0.00 Season Debrief - 30 people, hybrid, 4 hr = 120 hr 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 120 120 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 15,026 $ - 0 $ - 0 $ 15,026 $ 1,878 $ - 0 $15,025.63
41 1.2.1.3.2.1 1.2 1.2.1 UW WIPAC String Management and Controls (2022-2023) String Management and Controls (2022-2023) Tosi Labor Hours Labor - LoE SC D - Expert Opinion $47 $52 35.00% 53.00% Off Ice C1 9.0% $2,421.52 $838.83 Tosi - 15% 22 22 22 22 23 23 23 23 22 22 23 23 270 $ 1,039 $ 1,039 $ 1,039 $ 1,039 $ 1,086 $ 1,086 $ 1,086 $ 1,086 $ 1,039 $ 1,039 $ 1,086 $ 1,086 $ 13,026 $ 4,559 $ 9,320 $ 26,906 $ 1,583 $ 839 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $26,905.76
42 1.2.1.3.2.2 1.2 1.2.1 UW WIPAC Installation Engineering (2022-2023) Installation Engineering (2022-2023) Tosi Labor Hours Labor - LoE SC D - Expert Opinion $47 $52 35.00% 53.00% Off Ice C1 9.0% $4,035.86 $1,398.04 Tosi - 25% 38 38 38 38 38 36 36 36 38 38 38 38 450 $ 1,795 $ 1,795 $ 1,795 $ 1,795 $ 1,795 $ 1,700 $ 1,700 $ 1,700 $ 1,795 $ 1,795 $ 1,795 $ 1,795 $ 21,710 $ 7,599 $ 15,534 $ 44,843 $ 2,638 $ 1,398 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $44,842.93
43 1.2.1.3.2.3 1.2 1.2.1 UW PSL Installation Engineering Support (2022-2023) Installation Engineering Support (2022-2023) Labor Hours Labor - LoE EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $704.84 $0.00 4 4 4 4 4 4 4 4 4 4 4 4 48 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 5,639 $ - 0 $ - 0 $ 5,639 $ 705 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,638.68
44 1.2.1.3.3.1 1.2 1.2.1 UW WIPAC String Management and Controls (2023-2024) String Management and Controls (2023-2024) Tosi Labor Hours Labor - LoE SC D - Expert Opinion $47 $52 35.00% 53.00% Off Ice C1 9.0% $1,649.05 $571.24 Tosi - 10% 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 15 15 15 15 15 15 15 15 15 15 15 15 180 $ 708 $ 708 $ 708 $ 708 $ 708 $ 708 $ 708 $ 708 $ 708 $ 708 $ 708 $ 708 $ 8,871 $ 3,105 $ 6,347 $ 18,323 $ 1,078 $ 571 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $18,322.82
45 1.2.1.3.3.2 1.2 1.2.1 UW WIPAC Installation Engineering (2023-2024) Installation Engineering (2023-2024) Tosi Labor Hours Labor - LoE SC D - Expert Opinion $47 $52 35.00% 53.00% Off Ice C1 9.0% $4,947.16 $1,713.72 Tosi - 30% 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 45 45 45 45 45 45 45 45 45 45 45 45 540 $ 2,125 $ 2,125 $ 2,125 $ 2,125 $ 2,125 $ 2,125 $ 2,125 $ 2,125 $ 2,125 $ 2,125 $ 2,125 $ 2,125 $ 26,613 $ 9,314 $ 19,041 $ 54,968 $ 3,233 $ 1,714 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $54,968.47
46 1.2.1.3.3.3 1.2 1.2.1 UW PSL Installation Engineering Support (2023-2024) Installation Engineering Support (2023-2024) Labor Hours Labor - LoE EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $719.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 4 4 4 4 4 4 4 4 4 4 4 4 48 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 5,760 $ - 0 $ - 0 $ 5,760 $ 720 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,759.91
47 1.2.1.3.4.1 1.2 1.2.1 UW WIPAC String Management and Controls (2024-2025) String Management and Controls (2024-2025) Tosi Labor Hours Labor - LoE SC D - Expert Opinion $47 $52 35.00% 53.00% Off Ice C1 9.0% $842.25 $291.76 Tosi - 5% 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 0 0 8 9 9 9 9 10 10 10 90 $ 378 $ 378 $ - 0 $ - 0 $ 378 $ 425 $ 425 $ 425 $ 425 $ 472 $ 472 $ 472 $ 4,531 $ 1,586 $ 3,242 $ 9,358 $ 550 $ 292 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,358.38
48 1.2.1.3.4.2 1.2 1.2.1 UW WIPAC Installation Engineering (2024-2025) Installation Engineering (2024-2025) Tosi Labor Hours Labor - LoE SC D - Expert Opinion $47 $52 35.00% 53.00% Off Ice C1 9.0% $4,211.27 $1,458.81 Tosi - 25% 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 45 45 0 0 45 45 45 45 45 45 45 45 450 $ 2,125 $ 2,125 $ - 0 $ - 0 $ 2,125 $ 2,125 $ 2,125 $ 2,125 $ 2,125 $ 2,125 $ 2,125 $ 2,125 $ 22,654 $ 7,929 $ 16,209 $ 46,792 $ 2,752 $ 1,459 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $46,791.91
49 1.2.1.3.4.3 1.2 1.2.1 UW PSL Installation Engineering Support (2024-2025) Installation Engineering Support (2024-2025) Labor Hours Labor - LoE EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $674.18 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 4 4 4 0 4 4 4 4 4 4 4 4 44 $ 460 $ 460 $ 460 $ - 0 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 460 $ 5,393 $ - 0 $ - 0 $ 5,393 $ 674 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,393.44
50 1.2.1.3.5.1 1.2 1.2.1 UW WIPAC String Management and Controls (2025-2026) String Management and Controls (2025-2026) Tosi Labor Hours Labor - LoE SC D - Expert Opinion $47 $52 35.00% 53.00% Off Ice C1 9.0% $172.07 $59.61 Tosi - 5% 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 6 12 18 $ 283 $ - 0 $ - 0 $ - 0 $ 567 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 926 $ 324 $ 662 $ 1,912 $ 112 $ 60 $1,911.92
51 1.2.1.3.5.2 1.2 1.2.1 UW WIPAC Installation Engineering (2025-2026) Installation Engineering (2025-2026) Tosi Labor Hours Labor - LoE SC D - Expert Opinion $47 $52 35.00% 53.00% Off Ice C1 9.0% $736.09 $254.98 Tosi - 20% 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 15 30 16 16 77 $ 708 $ - 0 $ - 0 $ - 0 $ 1,417 $ 756 $ 756 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,960 $ 1,386 $ 2,833 $ 8,179 $ 481 $ 255 $8,178.76
52 1.2.1.4.5 1.2 1.2.1 UW PSL 2022-23 Quality & Safety 2022-23 Quality & Safety HA Review Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $2,114.51 $0.00 12 sessions * 2 hr/session each year
6 people = 144 hr/yr
12 12 12 12 12 12 12 12 12 12 12 12 144 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 16,916 $ - 0 $ - 0 $ 16,916 $ 2,115 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $16,916.04
53 1.2.1.4.6 1.2 1.2.1 UW PSL 2023-24 Quality & Safety 2023-24 Quality & Safety HA Review Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $2,159.97 $0.00 12 sessions * 2 hr/session each year
6 people = 144 hr/yr
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 12 12 12 12 12 12 12 12 12 12 12 12 144 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 17,280 $ - 0 $ - 0 $ 17,280 $ 2,160 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $17,279.73
54 1.2.1.4.7 1.2 1.2.1 UW PSL 2024-25 Quality & Safety 2025-25 Quality & Safety HA Review Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $2,206.41 $0.00 12 sessions * 2 hr/session each year
6 people = 144 hr/yr
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 12 12 12 12 12 12 12 12 12 12 12 12 144 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 1,380 $ 17,651 $ - 0 $ - 0 $ 17,651 $ 2,206 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $17,651.25
55 1.2.1.4.8 1.2 1.2.1 UW PSL 2025-26 Quality & Safety 2025-26 Quality & Safety HA Review Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $375.64 $0.00 2 sessions * 2 hr/session each year
6 people = 24 hr/yr October & November
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 12 12 24 $ 1,380 $ 1,380 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,005 $ - 0 $ - 0 $ 3,005 $ 376 $ - 0 $3,005.13
56 1.2.1.5.5 1.2 1.2.1 UW PSL 2022-23 Travel (non-deployment) 2022-23 Travel (non-deployment) Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $1,772.32 $613.94 Collab Mtg (international): 1x $3600
ASC/Denver (domestic): 5x $1800 = $9k
Total = 3.6k+9k = 12.6k
9000 3600 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,000 $ 3,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 12,871 $ - 0 $ 6,822 $ 19,692 $ 1,158 $ 614 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $19,692.48
57 1.2.1.5.6 1.2 1.2.1 UW PSL 2023-24 Travel (non-deployment) 2023-24 Travel (non-deployment) Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $1,810.43 $627.14 Collab Mtg (international): 1x $3600
ASC/Denver (domestic): 5x $1800 = $9k
Total = 3.6k+9k = 12.6k
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 9000 3600 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,000 $ 3,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,148 $ - 0 $ 6,968 $ 20,116 $ 1,183 $ 627 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $20,115.87
58 1.2.1.5.7 1.2 1.2.1 UW PSL 2024-25 Travel (non-deployment) 2024-25 Travel (non-deployment) Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $1,849.35 $640.63 Collab Mtg (international): 1x $3600
ASC/Denver (domestic): 5x $1800 = $9k
Total = 3.6k+9k = 12.6k
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 9000 3600 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,000 $ 3,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,430 $ - 0 $ 7,118 $ 20,548 $ 1,209 $ 641 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $20,548.36
59 1.2.1.6.2.11 1.2 1.2.1 UW PSL Crate Control Systems Components Shipment 1 - DNF (Vessel) Crate Control Systems Components Shipment 1 - DNF (Vessel) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $234.95 $0.00 16 16 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 235 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
60 1.2.1.6.2.11 1.2 1.2.1 UW PSL Crate Control Systems Components Shipment 1 - DNF (Vessel) Crate Control Systems Components Shipment 1 - DNF (Vessel) M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C2 12.5% $163.71 $56.71 Collapsible Bulk Container, Black, 48 inH x 45 inL x 41 inW, 1EA w/ lid $838 W.W. Grainger Item #36XE25 & #1XGG9 838 0 $ 838 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 856 $ - 0 $ 454 $ 1,310 $ 107 $ 57 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,309.71
61 1.2.1.6.2.20 1.2 1.2.1 UW PSL Load Container C (Main/Combo Cables, Bull Wheel, Hose Heating Components, ARA Drill Components - Crate 2) (Vessel) Load Container C (Main/Combo Cables, Bull Wheel, Hose Heating Components, ARA Drill Components - Crate 2) (Vessel) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C2 12.5% $294.96 $0.00 30 30 $ 2,310 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,360 $ - 0 $ - 0 $ 2,360 $ 295 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,359.67
62 1.2.1.6.2.20 1.2 1.2.1 UW PSL Load Container C (Main/Combo Cables, Bull Wheel, Hose Heating Components, ARA Drill Components - Crate 2) (Vessel) Load Container C (Main/Combo Cables, Bull Wheel, Hose Heating Components, ARA Drill Components - Crate 2) (Vessel) M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C2 12.5% $1,172.17 $406.05 $6000 estimated for 20' container purchase with delivery. PY3 container procurement was 6k. 6000 0 $ 6,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,129 $ - 0 $ 3,248 $ 9,377 $ 766 $ 406 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,377.37
63 1.2.1.6.2.21 1.2 1.2.1 UW PSL Crate Drill Heads, Spare Parts to PTH (Vessel) Store in ICL - DNF Crate Drill Heads, Spare Parts to PTH (Vessel) Store in ICL - DNF Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C2 12.5% $0.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $0.00
64 1.2.1.6.2.22 1.2 1.2.1 UW PSL Crate Control Systems Components Shipment 2 - DNF (Comsur) Crate Control Systems Components Shipment 2 - DNF (Comsur) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C2 12.5% $235.97 $0.00 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,848 $ - 0 $ - 0 $ - 0 $ 1,888 $ - 0 $ - 0 $ 1,888 $ 236 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,887.73
65 1.2.1.6.2.22 1.2 1.2.1 UW PSL Crate Control Systems Components Shipment 2 - DNF (Comsur) Crate Control Systems Components Shipment 2 - DNF (Comsur) M & S M & S C - Engineering Buildup $1 0.00% 53.00% Off Ice C2 12.5% $327.43 $113.42 Collapsible Bulk Container, Black, 48 inH x 45 inL x 41 inW, 1EA w/ lid $838 W.W. Grainger Item #36XE25 & #1XGG9 1676 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,676 $ - 0 $ - 0 $ - 0 $ 1,712 $ - 0 $ 907 $ 2,619 $ 214 $ 113 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,619.41
66 1.2.1.6.2.23 1.2 1.2.1 UW PSL Crate Elect. Distribution System Components (ComSur) Crate Elect. Distribution System Components (ComSur) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $117.47 $0.00 4 4 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 460 $ 460 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 117 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
67 1.2.1.6.2.24 1.2 1.2.1 UW PSL Crate MDS Internal Hoses & Spares Resupply (FS2 Resupply Container - Comsur) Crate MDS Internal Hoses & Spares Resupply (FS2 Resupply Container - Comsur) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C2 12.5% $80.35 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 616 $ - 0 $ - 0 $ - 0 $ 643 $ - 0 $ - 0 $ 643 $ 80 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $642.77
68 1.2.1.6.2.25 1.2 1.2.1 UW PSL Crate Drill Filtration Resupply (FS2 Resupply Container - Comsur) Crate Drill Filtration Resupply (FS2 Resupply Container - Comsur) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C2 12.5% $80.35 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 616 $ - 0 $ - 0 $ - 0 $ 643 $ - 0 $ - 0 $ 643 $ 80 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $642.77
69 1.2.1.6.2.26 1.2 1.2.1 UW PSL Crate FS2 SES Interconnect Resupply (FS2 Resupply Container - Comsur) Crate FS2 SES Interconnect Resupply (FS2 Resupply Container - Comsur) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C2 12.5% $80.35 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 616 $ - 0 $ - 0 $ - 0 $ 643 $ - 0 $ - 0 $ 643 $ 80 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $642.77
70 1.2.1.6.2.28 1.2 1.2.1 UW PSL Load FS2 Resupply Container (FS2 Comsur) Load FS2 Resupply Container (Comsur) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C2 12.5% $160.69 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,232 $ - 0 $ - 0 $ 1,286 $ - 0 $ - 0 $ 1,286 $ 161 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,285.55
71 1.2.1.6.2.29 1.2 1.2.1 UW PSL Crate Repair/Replacement Components Resupply (FS2 Resupply Container - Comsur) Crate Repair/Replacement Components Resupply (FS2 Resupply Container - Comsur) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C2 12.5% $80.35 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 616 $ - 0 $ - 0 $ 643 $ - 0 $ - 0 $ 643 $ 80 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $642.77
72 1.2.1.6.2.30 1.2 1.2.1 UW PSL Crate Control Systems Components Shipment 3 - DNF (Comsur) Crate Control Systems Components Shipment 3 - DNF (Vessel) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C2 12.5% $164.15 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,232 $ - 0 $ - 0 $ 1,313 $ - 0 $ - 0 $ 1,313 $ 164 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,313.18
73 1.2.1.6.3.1 1.2 1.2.1 UW PSL FS0 - Ship Control Systems Components Shipment 1, ARA System DNF, Drill Heads, & Container C (Vessel) FS0 - Ship Control Systems Components Shipment 1, ARA System Parts, Drill Heads, & Container C (Vessel) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C2 12.5% $781.45 $270.70 Estimated based on November 2021 trucking invoice (SEKO) - October '22 is a full 53' trailer load 4000 0 $ 4,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,086 $ - 0 $ 2,166 $ 6,252 $ 511 $ 271 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $6,251.58
74 1.2.1.6.3.1 1.2 1.2.1 UW PSL FS0 - Ship Control Systems Components Shipment 1, ARA System DNF, Drill Heads, & Container C (Vessel) FS0 - Ship Control Systems Components Shipment 1, ARA System Parts, Drill Heads, & Container C (Vessel) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C2 12.5% $195.36 $67.67 Estimated based on 2021 Reynolds & Reynolds loading support invoice 1000 0 $ 1,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,022 $ - 0 $ 541 $ 1,563 $ 128 $ 68 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,562.90
75 1.2.1.6.3.2 1.2 1.2.1 UW PSL FS1 - Ship Control Systems Components Shipment 2 - DNF (Comsur) FS1 - Ship Control Systems Components Shipment 2 - DNF (Comsur) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C2 12.5% $683.77 $236.86 Estimated based on November 2021 trucking invoice (SEKO) - August '23 is a partial truck load 3500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,500 $ - 0 $ 3,575 $ - 0 $ 1,895 $ 5,470 $ 447 $ 237 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,470.13
76 1.2.1.6.3.3 1.2 1.2.1 UW PSL FS2 - Ship Control Systems Components Shipment 3, Refit Resupply Container (Comsur) FS2 - Ship Control Systems Components Shipment 3, Resupply Container (Comsur) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C2 12.5% $498.91 $172.82 Estimated based on November 2021 trucking invoice (SEKO) - August '24 is a quarter truck load 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ - 0 $ 2,609 $ - 0 $ 1,383 $ 3,991 $ 326 $ 173 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,991.24
77 1.2.1.6.3.4 1.2 1.2.1 UW PSL FS3 - Ship Resupply Container (Comsur) FS3 - Ship Resupply Container (Comsur) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C2 12.5% $509.63 $176.54 Estimated based on November 2021 trucking invoice (SEKO) - August '25 is a quarter truck load 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ - 0 $ 2,665 $ - 0 $ 1,412 $ 4,077 $ 333 $ 177 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,077.05
78 1.2.1.6.4.1 1.2 1.2.1 UW PSL Crate Sensor Handling Structure Crate (Installation): Sensor Handling Structure (Vessel) M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C2 12.5% $586.09 $203.02 3000 0 $ 3,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,065 $ - 0 $ 1,624 $ 4,689 $ 383 $ 203 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,688.69
79 1.2.1.6.4.2 1.2 1.2.1 UW PSL Crate Installation Kits Crate (Installation): Installation Kits (Vessel) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C2 12.5% $314.62 $0.00 16 16 32 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,232 $ 1,232 $ - 0 $ - 0 $ 2,517 $ - 0 $ - 0 $ 2,517 $ 315 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,516.98
80 1.2.1.6.4.2 1.2 1.2.1 UW PSL Crate Installation Kits Crate (Installation): Installation Kits (Vessel) M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C2 12.5% $956.10 $331.20 7x 34"H x 48"L x 40"Wx 7crates at $699/each Grainger 1XGG6 2447 2447 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,447 $ 2,447 $ - 0 $ - 0 $ 4,999 $ - 0 $ 2,650 $ 7,649 $ 625 $ 331 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,648.81
81 1.2.1.6.4.3 1.2 1.2.1 UW PSL Crate String Weights Crate (Installation): String Weights (Vessel) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C2 12.5% $78.66 $0.00 2x $517/each Collapsible Bulk Container, Black, 34 inH x 48 inL x 45 inW, 1EA
Item # 39H823
8 8 $ - 0 $ - 0 $ - 0 $ 616 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 629 $ - 0 $ - 0 $ 629 $ 79 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $629.24
82 1.2.1.6.4.3 1.2 1.2.1 UW PSL Crate String Weights Crate (Installation): String Weights (Vessel) M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C2 12.5% $202.00 $69.98 $1317 estimated for three 40" x 48" x 25" bulk containers with lids to package hardware for shipping 1034 0 $ - 0 $ - 0 $ - 0 $ 1,034 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,056 $ - 0 $ 560 $ 1,616 $ 132 $ 70 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,616.03
83 1.2.1.6.4.4 1.2 1.2.1 UW PSL Crate Science Equipment FS2 (SPAT, IME, Pressure Sensors, Laser Rangers) Crate (Installation): Science Equipment FS2 (SPAT, IME, Laser Rangers, Pressure Sensors)(Comsur) M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C2 12.5% $148.08 $51.29 $371/each estimated for two 45" x 48" x 44" bulk containers with lids to package hardware for shipping 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 742 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 742 $ - 0 $ - 0 $ - 0 $ 774 $ - 0 $ 410 $ 1,185 $ 97 $ 51 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,184.60
84 1.2.1.6.4.5 1.2 1.2.1 UW PSL Crate Science Equipment FS3 Crate (Installation): Science Equipment FS3 (Comsur) M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C2 12.5% $151.26 $52.40 $371/each estimated for two 45" x 48" x 44" bulk containers with lids to package hardware for shipping 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 742 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 742 $ - 0 $ - 0 $ 791 $ - 0 $ 419 $ 1,210 $ 99 $ 52 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,210.07
85 1.2.1.6.5.1 1.2 1.2.1 UW PSL Ship Sensor Handling Structure Ship (Installation): Sensor Handling Structure (Vessel) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C2 12.5% $586.09 $203.02 DHF ships on truck with Container C 3000 0 $ 3,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,065 $ - 0 $ 1,624 $ 4,689 $ 383 $ 203 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,688.69
86 1.2.1.6.5.2 1.2 1.2.1 UW PSL Ship Installation Kits Ship (Installation): Installation Kits (Vessel) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C2 12.5% $409.50 $141.85 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2052 0 $ 2,052 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,141 $ - 0 $ 1,135 $ 3,276 $ 268 $ 142 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,276.01
87 1.2.1.6.5.3 1.2 1.2.1 UW PSL Ship String Weights Ship (Installation): String Weights (Vessel) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C2 12.5% $103.77 $35.95 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 520 0 $ 520 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 543 $ - 0 $ 288 $ 830 $ 68 $ 36 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $830.18
88 1.2.1.6.5.4 1.2 1.2.1 UW PSL Ship Science Crate FS2 (SPAT, IME, Pressure Sensors, Laser Rangers) Ship (Installation): Science Equipment FS2 (SPAT, IME, Laser Rangers, Pressure Sensors) (Comsur) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C2 12.5% $199.56 $69.13 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,000 $ - 0 $ 1,043 $ - 0 $ 553 $ 1,596 $ 130 $ 69 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,596.50
89 1.2.1.6.5.5 1.2 1.2.1 UW PSL Ship Science Crate FS3 Ship (Installation): Science Equipment FS3 (Comsur) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C2 12.5% $203.85 $70.62 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,000 $ - 0 $ 1,066 $ - 0 $ 565 $ 1,631 $ 133 $ 71 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,630.82
90 1.2.2.1.6 1.2 1.2.2 UW PSL Procure MHP Upgrade, Sub-Components, Spares (PY5) MHP: Procure MHP Upgrade, Sub-Components, Spares (PY5) Gibson Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 12 12 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ 1,380 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
91 1.2.2.1.6 1.2 1.2.2 UW PSL Procure MHP Upgrade, Sub-Components, Spares (PY5) MHP: Procure MHP Upgrade, Sub-Components, Spares (PY5) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $1,021.50 $0.00 2500 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ 2,500 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,108 $ - 0 $ - 0 $ 5,108 $ 1,022 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,107.50
92 1.2.2.1.7 1.2 1.2.2 UW PSL Develop HPU2 Integrate Plan MHP: Develop HPU2 Integrate Plan Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $2,099.97 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 25 25 50 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,875 $ 2,875 $ - 0 $ - 0 $ - 0 $ 6,000 $ - 0 $ - 0 $ 6,000 $ 2,100 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,999.91
93 1.2.2.1.8 1.2 1.2.2 UW PSL Procure and Assemble HPU2 Integration Components MHP: Procure and Assemble HPU2 Integration Components Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $959.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ - 0 $ - 0 $ 4,800 $ - 0 $ - 0 $ 4,800 $ 960 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,799.93
94 1.2.2.1.8 1.2 1.2.2 UW PSL Procure and Assemble HPU2 Integration Components MHP: Procure and Assemble HPU2 Integration Components Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $642.77 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,540 $ 1,540 $ - 0 $ - 0 $ 3,214 $ - 0 $ - 0 $ 3,214 $ 643 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,213.86
95 1.2.2.1.8 1.2 1.2.2 UW PSL Procure and Assemble HPU2 Integration Components MHP: Procure and Assemble HPU2 Integration Components CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $2,086.92 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 5000 5000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,000 $ 5,000 $ - 0 $ - 0 $ 10,435 $ - 0 $ - 0 $ 10,435 $ 2,087 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $10,434.62
96 1.2.2.1.10 1.2 1.2.2 UW PSL Procure MHP Upgrade, Sub-Components, Spares (PY6) MHP: Procure Upgrade, Sub-Components, Spares (PY6) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $575.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 12 12 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ 1,380 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,880 $ - 0 $ - 0 $ 2,880 $ 576 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,879.96
97 1.2.2.1.10 1.2 1.2.2 UW PSL Procure MHP Upgrade, Sub-Components, Spares (PY6) MHP: Procure Upgrade, Sub-Components, Spares (PY6) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $1,043.46 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2500 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ 2,500 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,217 $ - 0 $ - 0 $ 5,217 $ 1,043 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,217.31
98 1.2.2.2.4 1.2 1.2.2 UW PSL Procure and Upgrade Control Boxes (PY6) PHS: Procure and Upgrade Control Boxes (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,919.97 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 40 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,600 $ - 0 $ - 0 $ 9,600 $ 1,920 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,599.85
99 1.2.2.2.4 1.2 1.2.2 UW PSL Procure and Upgrade Control Boxes (PY6) PHS: Procure and Upgrade Control Boxes (PY6) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $1,285.55 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 40 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,080 $ 3,080 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,428 $ - 0 $ - 0 $ 6,428 $ 1,286 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $6,427.73
100 1.2.2.2.4 1.2 1.2.2 UW PSL Procure and Upgrade Control Boxes (PY6) PHS: Procure and Upgrade Control Boxes (PY6) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $834.77 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2000 2000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,000 $ 2,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,174 $ - 0 $ - 0 $ 4,174 $ 835 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,173.85
101 1.2.2.2.5 1.2 1.2.2 UW PSL Procure Upgrade, Sub-Components, Spares (PY6) PHS: Procure Upgrade, Sub-Components, Spares (PY6) Labor Hours Labor Hours EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $575.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 12 12 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ 1,380 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,880 $ - 0 $ - 0 $ 2,880 $ 576 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,879.96
102 1.2.2.2.5 1.2 1.2.2 UW PSL Procure Upgrade, Sub-Components, Spares (PY6) PHS: Procure Upgrade, Sub-Components, Spares (PY6) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $1,043.46 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2500 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ 2,500 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,217 $ - 0 $ - 0 $ 5,217 $ 1,043 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,217.31
103 1.2.2.3.8 1.2 1.2.2 UW PSL Procure ARA Fueling Hose & Nozzle (PY5) Fuel Tower: Procure ARA Fueling Hose & Nozzle (PY5) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
104 1.2.2.3.8 1.2 1.2.2 UW PSL Procure ARA Fueling Hose & Nozzle (PY5) Fuel Tower: Procure ARA Fueling Hose & Nozzle (PY5) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C3 20.0% $907.50 $0.00 4442 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,442 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,538 $ - 0 $ - 0 $ 4,538 $ 908 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,537.50
105 1.2.2.3.9 1.2 1.2.2 UW PSL Procure Racor Fuel Filter Elements and Gauges Replacements (PY5) Fuel Tower: Procure Racor Fuel Filter Elements and Gauges Replacements (PY5) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
106 1.2.2.3.9 1.2 1.2.2 UW PSL Procure Racor Fuel Filter Elements and Gauges Replacements (PY5) Fuel Tower: Procure Racor Fuel Filter Elements and Gauges Replacements (PY5) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $251.70 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,232 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,258 $ - 0 $ - 0 $ 1,258 $ 252 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,258.49
107 1.2.2.3.9 1.2 1.2.2 UW PSL Procure Racor Fuel Filter Elements and Gauges Replacements (PY5) Fuel Tower: Procure Racor Fuel Filter Elements and Gauges Replacements (PY5) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $306.45 $0.00 1500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,532 $ - 0 $ - 0 $ 1,532 $ 306 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,532.25
108 1.2.2.3.10 1.2 1.2.2 UW PSL Procure Fuel system Upgrade/Maintenance Subcomponents (PY6) Fuel Tower: Procure Fuel system Upgrade/Maintenance Subcomponents (PY6) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $575.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 12 12 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ 1,380 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,880 $ - 0 $ - 0 $ 2,880 $ 576 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,879.96
109 1.2.2.3.10 1.2 1.2.2 UW PSL Procure Fuel system Upgrade/Maintenance Subcomponents (PY6) Fuel Tower: Procure Fuel system Upgrade/Maintenance Subcomponents (PY6) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $500.86 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1200 1200 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,200 $ 1,200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,504 $ - 0 $ - 0 $ 2,504 $ 501 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,504.31
110 1.2.2.3.11 1.2 1.2.2 UW PSL Procure MHP Fuel Heat Exchangers Replacements (PY6) Fuel Tower: Procure MHP Fuel Heat Exchangers Replacements (PY6) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $383.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,920 $ - 0 $ - 0 $ 1,920 $ 384 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,919.97
111 1.2.2.3.11 1.2 1.2.2 UW PSL Procure MHP Fuel Heat Exchangers Replacements (PY6) Fuel Tower: Procure MHP Fuel Heat Exchangers Replacements (PY6) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C3 20.0% $2,145.98 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 10283 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,283 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,730 $ - 0 $ - 0 $ 10,730 $ 2,146 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $10,729.92
112 1.2.3.1.5 1.2 1.2.3 UW PSL Crescent Emergency Repair Kit Assembly (PY6) Tower Ops: Crescent Emergency Repair Kit Assembly Lemery Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $959.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,800 $ - 0 $ - 0 $ 4,800 $ 960 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,799.93
113 1.2.3.1.5 1.2 1.2.3 UW PSL Crescent Emergency Repair Kit Assembly (PY6) Tower Ops: Crescent Emergency Repair Kit Assembly Lemry CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $521.73 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,609 $ - 0 $ - 0 $ 2,609 $ 522 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,608.66
114 1.2.3.1.6 1.2 1.2.3 UW PSL Examine Interface between Dust Logger and Tower & Address as Needed Tower Ops: Examine Interface between Dust Logger and Tower & Address as Needed Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,644.62 $0.00 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 1,645 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
115 1.2.3.1.6 1.2 1.2.3 UW PSL Examine Interface between Dust Logger and Tower & Address as Needed Tower Ops: Examine Interface between Dust Logger and Tower & Address as Needed CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $858.06 $0.00 1200 1200 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,200 $ 1,200 $ - 0 $ 2,452 $ - 0 $ - 0 $ 2,452 $ 858 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,451.60
116 1.2.3.1.7.2 1.2 1.2.3 UW PSL Calibration Load Cell Tower Ops: Load Cell Calibration Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $117.47 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 117 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
117 1.2.3.1.7.2 1.2 1.2.3 UW PSL Calibration Load Cell Tower Ops: Load Cell Calibration CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $228.43 $0.00 1789 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,789 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,827 $ - 0 $ - 0 $ 1,827 $ 228 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,827.46
118 1.2.3.1.7.3 1.2 1.2.3 UW PSL Calibration Load Cell Rigging Tower Ops: Identify/Procure: Load Cell Rigging Calibration Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $117.47 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 117 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
119 1.2.3.1.7.3 1.2 1.2.3 UW PSL Calibration Load Cell Rigging Tower Ops: Identify/Procure: Load Cell Rigging Calibration CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $155.78 $0.00 1220 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,220 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,246 $ - 0 $ - 0 $ 1,246 $ 156 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,246.23
120 1.2.3.1.8 1.2 1.2.3 UW PSL Identify/Procure: TOS & Tower Hardware, Repair Parts (PY5) Tower Ops: Identify/Procure: TOS & Tower Hardware, Repair Parts (PY5) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
121 1.2.3.1.8 1.2 1.2.3 UW PSL Identify/Procure: TOS & Tower Hardware, Repair Parts (PY5) Tower Ops: Identify/Procure: TOS & Tower Hardware, Repair Parts (PY5) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 8 8 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ 920 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
122 1.2.3.1.8 1.2 1.2.3 UW PSL Identify/Procure: TOS & Tower Hardware, Repair Parts (PY5) Tower Ops: Identify/Procure: TOS & Tower Hardware, Repair Parts (PY5) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C3 20.0% $2,090.40 $0.00 Driller tape: 4 cases @ 30 rolls/case = 120 rolls
$50/roll -> $6k
5232 5000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,232 $ - 0 $ 5,000 $ - 0 $ 10,452 $ - 0 $ - 0 $ 10,452 $ 2,090 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $10,451.99
123 1.2.3.1.9 1.2 1.2.3 UW PSL Identify/Procure: TOS & Tower Hardware, Repair Parts (PY6) Tower Ops: Identify/Procure: TOS & Tower Hardware, Repair Parts (PY6) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $383.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ 1,920 $ - 0 $ - 0 $ 1,920 $ 384 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,919.97
124 1.2.3.1.9 1.2 1.2.3 UW PSL Identify/Procure: TOS & Tower Hardware, Repair Parts (PY6) Tower Ops: Identify/Procure: TOS & Tower Hardware, Repair Parts (PY6) Labor Hours Labor Hours EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $383.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ 1,920 $ - 0 $ - 0 $ 1,920 $ 384 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,919.97
125 1.2.3.1.9 1.2 1.2.3 UW PSL Identify/Procure: TOS & Tower Hardware, Repair Parts (PY6) Tower Ops: Identify/Procure: TOS & Tower Hardware, Repair Parts (PY6) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C3 20.0% $1,926.65 $0.00 Driller tape: 4 cases @ 30 rolls/case = 120 rolls
$50/roll -> $6k
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 5232 4000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,232 $ 4,000 $ - 0 $ - 0 $ 9,633 $ - 0 $ - 0 $ 9,633 $ 1,927 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,633.24
126 1.2.3.1.10 1.2 1.2.3 UW PSL Identify/Procure: TOS & Tower Hardware, Repair Parts (PY7) Tower Ops: Identify/Procure: TOS & Tower Hardware, Repair Parts (PY7) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $392.25 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,961 $ - 0 $ - 0 $ 1,961 $ 392 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,961.25
127 1.2.3.1.10 1.2 1.2.3 UW PSL Identify/Procure: TOS & Tower Hardware, Repair Parts (PY7) Tower Ops: Identify/Procure: TOS & Tower Hardware, Repair Parts (PY7) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $392.25 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ 1,961 $ - 0 $ - 0 $ 1,961 $ 392 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,961.25
128 1.2.3.1.10 1.2 1.2.3 UW PSL Identify/Procure: TOS & Tower Hardware, Repair Parts (PY7) Tower Ops: Identify/Procure: TOS & Tower Hardware, Repair Parts (PY7) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C3 20.0% $4,901.42 $0.00 Driller tape: 50 rolls/hole x 7 holes = 350 rolls
Plus 3 cases @ 30 rolls/case = 440 rolls
$50/roll -> $22k
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20492 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 20,492 $ 2,500 $ - 0 $ - 0 $ - 0 $ 24,507 $ - 0 $ - 0 $ 24,507 $ 4,901 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $24,507.10
129 1.2.3.2.10 1.2 1.2.3 UW PSL Drillheads: Prepare Crates, Spares, Tools, & Docs x3 Drillheads: Prepare Crates, Spares, Tools, & Docs x3 Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 24 24 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
130 1.2.3.2.10 1.2 1.2.3 UW PSL Drillheads: Prepare Crates, Spares, Tools, & Docs x3 Drillheads: Prepare Crates, Spares, Tools, & Docs x3 Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $377.55 $0.00 24 24 $ 1,848 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,888 $ - 0 $ - 0 $ 1,888 $ 378 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,887.73
131 1.2.3.3.9 1.2 1.2.3 UW PSL Reels & Winches: Drill Reels Sliprings - Final Testing & Prep Reels & Winches: Drill Reels Sliprings - final testing and prep Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
132 1.2.3.3.10 1.2 1.2.3 UW PSL Reels & Winches: TU20 Sliprings - Spec, Procure, Test Reels & Winches: TU20 Sliprings - spec, procure, test Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $3,759.12 $0.00 80 80 160 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,200 $ 9,200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 18,796 $ - 0 $ - 0 $ 18,796 $ 3,759 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $18,795.60
133 1.2.3.3.10 1.2 1.2.3 UW PSL Reels & Winches: TU20 Sliprings - Spec, Procure, Test Reels & Winches: TU20 Sliprings - spec, procure, test CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $1,718.78 $0.00 8413 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 8,413 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 8,594 $ - 0 $ - 0 $ 8,594 $ 1,719 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $8,593.88
134 1.2.3.3.11 1.2 1.2.3 UW PSL Reels & Winches: Reel Components & Spares (PY6). TU20 brakes Reels & Winches: Reel Components & Spares (PY6). TU20 brakes) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,919.97 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 80 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,600 $ - 0 $ - 0 $ 9,600 $ 1,920 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,599.85
135 1.2.3.3.11 1.2 1.2.3 UW PSL Reels & Winches: Reel Components & Spares (PY6). TU20 brakes Reels & Winches: Reel Components & Spares (PY6). TU20 brakes) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $642.77 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,080 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,214 $ - 0 $ - 0 $ 3,214 $ 643 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,213.86
136 1.2.3.3.11 1.2 1.2.3 UW PSL Reels & Winches: Reel Components & Spares (PY6). TU20 brakes Reels & Winches: Reel Components & Spares (PY6). TU20 brakes) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $1,830.23 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8770 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 8,770 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,151 $ - 0 $ - 0 $ 9,151 $ 1,830 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,151.16
137 1.2.4.1.8 1.2 1.2.4 UW PSL Coordination with USAP IT (PY5) Architecture: Coordination with USAP IT (PY5) (station connectivity, internet, phone) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $469.89 $0.00 20 20 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ - 0 $ - 0 $ - 0 $ 2,349 $ - 0 $ - 0 $ 2,349 $ 470 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,349.45
138 1.2.4.1.9 1.2 1.2.4 UW PSL CS Drawings & Documentation (PY5) Architecture: CS Drawings & Documentation (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $751.82 $0.00 8 16 8 32 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ 1,840 $ 920 $ 3,759 $ - 0 $ - 0 $ 3,759 $ 752 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,759.12
139 1.2.4.1.10 1.2 1.2.4 UW PSL CS Drawings & Documentation (PY6) Architecture: CS Drawings & Documentation (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $767.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 16 16 32 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ 1,840 $ 3,840 $ - 0 $ - 0 $ 3,840 $ 768 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,839.94
140 1.2.4.1.11 1.2 1.2.4 UW PSL CS Drawings & Documentation (PY7) Architecture: CS Drawings & Documentation (PY7) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $784.50 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 16 16 32 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ 1,840 $ 3,922 $ - 0 $ - 0 $ 3,922 $ 784 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,922.50
141 1.2.4.1.12 1.2 1.2.4 UW PSL CS Drawings & Documentation (PY8) Architecture: CS Drawings & Documentation (PY8) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $801.37 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 32 32 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,680 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,007 $ - 0 $ - 0 $ 4,007 $ 801 $ - 0 $4,006.83
142 1.2.4.2.2.5 1.2 1.2.4 UW PSL Procure System Sensors (PY5) Controls Hardware: Procure System Sensors (PY5) Labor Hours Labor Hours EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $751.82 $0.00 32 32 $ 3,680 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,759 $ - 0 $ - 0 $ 3,759 $ 752 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,759.12
143 1.2.4.2.2.5 1.2 1.2.4 UW PSL Procure System Sensors (PY5) Controls Hardware: Procure System Sensors (PY5) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $3,546.65 $0.00 27776 0 $ 27,776 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 28,373 $ - 0 $ - 0 $ 28,373 $ 3,547 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $28,373.18
144 1.2.4.2.11.1 1.2 1.2.4 UW PSL CS HW Production Ignition Servers (3x: DCC, TOS1, TOS2) Network Controllers: CS HW Production Ignition Servers (3x: DCC, TOS1, TOS2) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $234.95 $0.00 2 4 4 10 $ - 0 $ - 0 $ - 0 $ - 0 $ 230 $ 460 $ 460 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,175 $ - 0 $ - 0 $ 1,175 $ 235 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,174.73
145 1.2.4.2.11.1 1.2 1.2.4 UW PSL CS HW Production Ignition Servers (3x: DCC, TOS1, TOS2) Network Controllers: CS HW Production Ignition Servers (3x: DCC, TOS1, TOS2) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $596.43 $0.00 4671 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,671 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,771 $ - 0 $ - 0 $ 4,771 $ 596 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,771.43
146 1.2.4.2.11.2 1.2 1.2.4 UW PSL CS HW Production Database Server (1x: DCC) Network Controllers: CS HW Production Database Server (1x: DCC) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $234.95 $0.00 2 4 4 10 $ - 0 $ - 0 $ - 0 $ - 0 $ 230 $ 460 $ 460 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,175 $ - 0 $ - 0 $ 1,175 $ 235 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,174.73
147 1.2.4.2.11.2 1.2 1.2.4 UW PSL CS HW Production Database Server (1x: DCC) Network Controllers: CS HW Production Database Server (1x: DCC) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $371.06 $0.00 2906 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,906 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,968 $ - 0 $ - 0 $ 2,968 $ 371 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,968.48
148 1.2.4.2.11.3 1.2 1.2.4 UW PSL CS HW Production Peripherals (3x sets: DCC, TOS1, TOS2) Network Controllers: CS HW Production Peripherals (3x sets: DCC, TOS1, TOS2) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
149 1.2.4.2.11.3 1.2 1.2.4 UW PSL CS HW Production Peripherals (3x sets: DCC, TOS1, TOS2) Network Controllers: CS HW Production Peripherals (3x sets: DCC, TOS1, TOS2) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $2,237.09 $0.00 17520 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 17,520 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 17,897 $ - 0 $ - 0 $ 17,897 $ 2,237 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $17,896.68
150 1.2.4.2.11.4 1.2 1.2.4 UW PSL CS HW DCC Core Switch & Security Appliance Network Controllers: CS HW DCC Core Switch & Security Appliance Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
151 1.2.4.2.11.4 1.2 1.2.4 UW PSL CS HW DCC Core Switch & Security Appliance Network Controllers: CS HW DCC Core Switch & Security Appliance CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $2,528.60 $0.00 19803 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 19,803 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 20,229 $ - 0 $ - 0 $ 20,229 $ 2,529 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $20,228.76
152 1.2.4.2.11.5 1.2 1.2.4 UW PSL CS HW Production Main PLC - PLC (redundant), I/O, network, UPS, in a box (3x: DCC, TOS1, TOS2) Network Controllers: CS HW Production Main PLC - PLC (redundant), I/O, network, UPS, in a box (3x: DCC, TOS1, TOS2) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $845.80 $0.00 16 10 10 36 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ 1,150 $ 1,150 $ - 0 $ - 0 $ - 0 $ 4,229 $ - 0 $ - 0 $ 4,229 $ 846 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,229.01
153 1.2.4.2.11.5 1.2 1.2.4 UW PSL CS HW Production Main PLC - PLC (redundant), I/O, network, UPS, in a box (3x: DCC, TOS1, TOS2) Network Controllers: CS HW Production Main PLC - PLC (redundant), I/O, network, UPS, in a box (3x: DCC, TOS1, TOS2) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $3,813.64 $0.00 29867 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 29,867 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 30,509 $ - 0 $ - 0 $ 30,509 $ 3,814 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $30,509.14
154 1.2.4.2.13 1.2 1.2.4 UW PSL CS HW PY6 Resupply Network Controllers: CS HW PY6 Resupply Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $3,359.95 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 40 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,600 $ - 0 $ - 0 $ 9,600 $ 3,360 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,599.85
155 1.2.4.2.13 1.2 1.2.4 UW PSL CS HW PY6 Resupply Network Controllers: CS HW PY6 Resupply CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,460.85 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2000 2000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,000 $ 2,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,174 $ - 0 $ - 0 $ 4,174 $ 1,461 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,173.85
156 1.2.4.2.14 1.2 1.2.4 UW PSL CS HW PY7 Resupply Network Controllers: CS HW PY7 Resupply Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $3,432.19 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 40 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,806 $ - 0 $ - 0 $ 9,806 $ 3,432 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,806.25
157 1.2.4.2.14 1.2 1.2.4 UW PSL CS HW PY7 Resupply Network Controllers: CS HW PY7 Resupply CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,492.26 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2000 2000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,000 $ 2,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,264 $ - 0 $ - 0 $ 4,264 $ 1,492 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,263.59
158 1.2.4.3.4 1.2 1.2.4 UW PSL PLC & Software Development (w/sub-tasks) Controls Software: PLC & Software Development (w/sub-tasks) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $2,849.65 $0.00 10 10 10 10 10 10 60 $ 1,150 $ - 0 $ 1,150 $ - 0 $ 1,150 $ - 0 $ 1,150 $ - 0 $ 1,150 $ - 0 $ 1,150 $ - 0 $ 7,048 $ - 0 $ - 0 $ 7,048 $ 1,410 $ - 0 10 10 10 10 10 10 60 $ 1,150 $ - 0 $ 1,150 $ - 0 $ 1,150 $ - 0 $ 1,150 $ - 0 $ 1,150 $ - 0 $ 1,150 $ - 0 $ 7,200 $ - 0 $ - 0 $ 7,200 $ 1,440 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,248.24
159 1.2.4.3.5 1.2 1.2.4 UW PSL SCADA Monitoring Software and Server Procurement Controls Software: SCADA Monitoring Software Procurement - Server Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $293.68 $0.00 20 20 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,349 $ - 0 $ - 0 $ 2,349 $ 294 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,349.45
160 1.2.4.3.5 1.2 1.2.4 UW PSL SCADA Monitoring Software and Server Procurement Controls Software: SCADA Monitoring Software - Server CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $293.30 $0.00 2297 0 $ 2,297 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,346 $ - 0 $ - 0 $ 2,346 $ 293 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,346.39
161 1.2.4.3.9.1.1 1.2 1.2.4 UW PSL Local-Panel MDS-specific HMI (PY5) Operator Screen MHP: Local-Panel MDS-specific HMI (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $469.89 $0.00 20 20 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,349 $ - 0 $ - 0 $ 2,349 $ 470 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,349.45
162 1.2.4.3.9.1.2 1.2 1.2.4 UW PSL Local-Panel MDS-specific HMI (PY6) Operator Screen MHP: Local-Panel MDS-specific HMI (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $479.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,400 $ - 0 $ - 0 $ 2,400 $ 480 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,399.96
163 1.2.4.3.9.1.3 1.2 1.2.4 UW PSL DCC-based SCADA UI (PY5) Operator Screen MHP: DCC-based SCADA UI (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,879.56 $0.00 80 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,398 $ - 0 $ - 0 $ 9,398 $ 1,880 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,397.80
164 1.2.4.3.9.1.4 1.2 1.2.4 UW PSL DCC-based SCADA UI (PY6) Operator Screen MHP: DCC-based SCADA UI (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,919.97 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 80 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,600 $ - 0 $ - 0 $ 9,600 $ 1,920 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,599.85
165 1.2.4.3.9.2.1 1.2 1.2.4 UW PSL Local-Panel MDS-specific HMI (PY5) Operator Screen Fuel System: Local-Panel MDS-specific HMI (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
166 1.2.4.3.9.2.2 1.2 1.2.4 UW PSL Local-Panel MDS-specific HMI (PY6) Operator Screen Fuel System: Local-Panel MDS-specific HMI (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $192.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ 960 $ - 0 $ - 0 $ 960 $ 192 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $959.99
167 1.2.4.3.9.2.3 1.2 1.2.4 UW PSL DCC-based SCADA (PY5) Operator Screen Fuel System: DCC-based SCADA (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
168 1.2.4.3.9.2.4 1.2 1.2.4 UW PSL DCC-based SCADA (PY6) Operator Screen Fuel System: DCC-based SCADA (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $192.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ 960 $ - 0 $ - 0 $ 960 $ 192 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $959.99
169 1.2.4.3.9.3.1 1.2 1.2.4 UW PSL Local-Panel MDS-specific HMI (PY5) Operator Screen Gensets: Local-Panel MDS-specific HMI (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
170 1.2.4.3.9.3.2 1.2 1.2.4 UW PSL Local-Panel MDS-specific HMI (PY6) Operator Screen Gensets: Local-Panel MDS-specific HMI (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $192.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ 960 $ - 0 $ - 0 $ 960 $ 192 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $959.99
171 1.2.4.3.9.3.3 1.2 1.2.4 UW PSL DCC-based SCADA (PY5) Operator Screen Gensets: DCC-based SCADA (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $281.93 $0.00 12 12 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ - 0 $ - 0 $ - 0 $ 1,410 $ - 0 $ - 0 $ 1,410 $ 282 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,409.67
172 1.2.4.3.9.3.4 1.2 1.2.4 UW PSL DCC-based SCADA (PY6) Operator Screen Gensets: DCC-based SCADA (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $288.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 12 12 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ - 0 $ - 0 $ - 0 $ 1,440 $ - 0 $ - 0 $ 1,440 $ 288 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,439.98
173 1.2.4.3.9.4.3 1.2 1.2.4 UW PSL DCC-based SCADA (PY5) Operator Screen Rodwell: DCC-based SCADA (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
174 1.2.4.3.9.4.4 1.2 1.2.4 UW PSL DCC-based SCADA (PY6) Operator Screen Rodwell: DCC-based SCADA (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $959.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ - 0 $ 4,800 $ - 0 $ - 0 $ 4,800 $ 960 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,799.93
175 1.2.4.3.9.5.1 1.2 1.2.4 UW PSL Local-Panel MDS-specific HMI (PY5) Operator Screen HPP: Local-Panel MDS-specific HMI (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $422.90 $0.00 18 18 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,070 $ - 0 $ 2,115 $ - 0 $ - 0 $ 2,115 $ 423 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,114.51
176 1.2.4.3.9.5.2 1.2 1.2.4 UW PSL Local-Panel MDS-specific HMI (PY6) Operator Screen HPP: Local-Panel MDS-specific HMI (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $431.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 18 18 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,070 $ - 0 $ 2,160 $ - 0 $ - 0 $ 2,160 $ 432 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,159.97
177 1.2.4.3.9.5.3 1.2 1.2.4 UW PSL DCC-based SCADA (PY5) Operator Screen HPP: DCC-based SCADA (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
178 1.2.4.3.9.5.4 1.2 1.2.4 UW PSL DCC-based SCADA (PY6) Operator Screen HPP: DCC-based SCADA (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $959.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ 4,800 $ - 0 $ - 0 $ 4,800 $ 960 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,799.93
179 1.2.4.3.9.6.1 1.2 1.2.4 UW PSL Local-Panel MDS-specific HMI (PY5) Operator Screen PHS: Local-Panel MDS-specific HMI (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
180 1.2.4.3.9.6.2 1.2 1.2.4 UW PSL Local-Panel MDS-specific HMI (PY6) Operator Screen PHS: Local-Panel MDS-specific HMI (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $383.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ 1,920 $ - 0 $ - 0 $ 1,920 $ 384 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,919.97
181 1.2.4.3.9.6.3 1.2 1.2.4 UW PSL DCC-based SCADA (PY5) Operator Screen PHS: DCC-based SCADA (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
182 1.2.4.3.9.6.4 1.2 1.2.4 UW PSL DCC-based SCADA (PY6) Operator Screen PHS: DCC-based SCADA (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $959.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ 4,800 $ - 0 $ - 0 $ 4,800 $ 960 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,799.93
183 1.2.4.3.10.1 1.2 1.2.4 UW PSL SCADA - DrillHead (PY5) TOS Operator Screen: SCADA - DrillHead (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
184 1.2.4.3.10.2 1.2 1.2.4 UW PSL SCADA - DrillHead (PY6) TOS Operator Screen: SCADA - DrillHead (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $192.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ 960 $ - 0 $ - 0 $ 960 $ 192 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $959.99
185 1.2.4.3.10.3 1.2 1.2.4 UW PSL SCADA - Drill_Settings (PY5) TOS Operator Screen: SCADA - Drill_Settings (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
186 1.2.4.3.10.4 1.2 1.2.4 UW PSL SCADA - Drill_Settings (PY6) TOS Operator Screen: SCADA - Drill_Settings (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $192.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ 960 $ - 0 $ - 0 $ 960 $ 192 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $959.99
187 1.2.4.3.10.5 1.2 1.2.4 UW PSL SCADA - Drilling_Drill Control (PY5) TOS Operator Screen: SCADA - SCADA - Drilling_Drill Control (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $281.93 $0.00 12 12 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ - 0 $ - 0 $ - 0 $ 1,410 $ - 0 $ - 0 $ 1,410 $ 282 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,409.67
188 1.2.4.3.10.6 1.2 1.2.4 UW PSL SCADA - Drilling_Drill Control (PY6) TOS Operator Screen: SCADA - Drilling_Drill Control (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $288.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 12 12 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ - 0 $ - 0 $ - 0 $ 1,440 $ - 0 $ - 0 $ 1,440 $ 288 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,439.98
189 1.2.4.3.10.7 1.2 1.2.4 UW PSL SCADA - Drilling_Cable Level Wind (PY5) TOS Operator Screen: SCADA - SCADA - Drilling_Cable Level Wind (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $281.93 $0.00 12 12 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ - 0 $ - 0 $ 1,410 $ - 0 $ - 0 $ 1,410 $ 282 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,409.67
190 1.2.4.3.10.8 1.2 1.2.4 UW PSL SCADA - Drilling_Cable Level Wind (PY6) TOS Operator Screen: SCADA - Drilling_Cable Level Wind (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $288.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 12 12 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ - 0 $ - 0 $ 1,440 $ - 0 $ - 0 $ 1,440 $ 288 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,439.98
191 1.2.4.3.10.9 1.2 1.2.4 UW PSL SCADA - Drilling_Hose Level Wind (PY5) TOS Operator Screen: SCADA - Drilling_Hose Level Wind (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $281.93 $0.00 12 12 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ - 0 $ - 0 $ 1,410 $ - 0 $ - 0 $ 1,410 $ 282 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,409.67
192 1.2.4.3.10.10 1.2 1.2.4 UW PSL SCADA - Drilling_Hose Level Wind (PY6) TOS Operator Screen: SCADA - Drilling_Hose Level Wind (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $288.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 12 12 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ - 0 $ - 0 $ 1,440 $ - 0 $ - 0 $ 1,440 $ 288 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,439.98
193 1.2.4.3.10.11 1.2 1.2.4 UW PSL SCADA - Return Water Pump (PY5) TOS Operator Screen: SCADA - Return Water Pump (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
194 1.2.4.3.10.12 1.2 1.2.4 UW PSL SCADA - Return Water Pump (PY6) TOS Operator Screen: SCADA - Return Water Pump (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $192.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ 960 $ - 0 $ - 0 $ 960 $ 192 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $959.99
195 1.2.4.3.10.13 1.2 1.2.4 UW PSL SCADA - Deployment - Cable (PY5) TOS Operator Screen: SCADA - Deployment - Cable (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
196 1.2.4.3.10.14 1.2 1.2.4 UW PSL SCADA - Deployment - Cable (PY6) TOS Operator Screen: SCADA - Deployment - Cable (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $192.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ 960 $ - 0 $ - 0 $ 960 $ 192 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $959.99
197 1.2.4.3.10.15 1.2 1.2.4 UW PSL SCADA - Deployment Settings (PY5) TOS Operator Screen: SCADA - Deployment Settings (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $234.95 $0.00 10 10 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,150 $ 1,175 $ - 0 $ - 0 $ 1,175 $ 235 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,174.73
198 1.2.4.3.10.16 1.2 1.2.4 UW PSL SCADA - Deployment Settings (PY6) TOS Operator Screen: SCADA - Deployment Settings (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $240.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 10 10 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,150 $ 1,200 $ - 0 $ - 0 $ 1,200 $ 240 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,199.98
199 1.2.4.3.11.1 1.2 1.2.4 UW PSL Build DCC dB schema (PY5) TOS Operator Screen: Build DCC dB schema (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,879.56 $0.00 40 40 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,398 $ - 0 $ - 0 $ 9,398 $ 1,880 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,397.80
200 1.2.4.3.11.2 1.2 1.2.4 UW PSL Build DCC dB schema (PY6) TOS Operator Screen: Build DCC dB schema (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,919.97 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 80 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,600 $ - 0 $ - 0 $ 9,600 $ 1,920 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,599.85
201 1.2.4.3.11.3 1.2 1.2.4 UW PSL Build Drill dB schema (PY5) TOS Operator Screen: Build Drill dB schema (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
202 1.2.4.3.11.4 1.2 1.2.4 UW PSL Build Drill dB schema (PY6) TOS Operator Screen: Build Drill dB schema (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $959.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,800 $ - 0 $ - 0 $ 4,800 $ 960 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,799.93
203 1.2.4.3.11.5 1.2 1.2.4 UW PSL Build Deploy dB schema (PY5) TOS Operator Screen: Build Deploy dB schema (PY5) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $704.84 $0.00 30 30 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,450 $ - 0 $ - 0 $ - 0 $ 3,524 $ - 0 $ - 0 $ 3,524 $ 705 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,524.18
204 1.2.4.3.11.6 1.2 1.2.4 UW PSL Build Deploy dB schema (PY6) TOS Operator Screen: Build Deploy dB schema (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $719.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 30 30 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,450 $ - 0 $ - 0 $ - 0 $ 3,600 $ - 0 $ - 0 $ 3,600 $ 720 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,599.94
205 1.2.4.3.12 1.2 1.2.4 UW PSL CS SW Standup Production Computing Hardware, Configure, Verify before Shipment (3x systems) (PY6) Controls Software: CS SW Standup Production Computing Hardware, Configure, Verify before Shipment (3x systems) (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $5,879.91 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 30 30 30 30 140 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 3,450 $ 3,450 $ 3,450 $ 3,450 $ - 0 $ - 0 $ 16,800 $ - 0 $ - 0 $ 16,800 $ 5,880 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $16,799.74
206 1.2.4.3.13 1.2 1.2.4 UW PSL CS SW MDS-specific HMI Refinement (PY7) Controls Software: CS SW MDS-specific HMI Refinement (PY7) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $3,432.19 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 20 20 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ 2,300 $ 2,300 $ - 0 $ - 0 $ 9,806 $ - 0 $ - 0 $ 9,806 $ 3,432 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,806.25
207 1.2.4.3.14 1.2 1.2.4 UW PSL CS SW DCC-based SCADA Refinement (PY7) Controls Software: CS SW DCC-based SCADA Refinement (PY7) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $5,148.28 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 30 30 30 30 120 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,450 $ 3,450 $ 3,450 $ 3,450 $ - 0 $ - 0 $ 14,709 $ - 0 $ - 0 $ 14,709 $ 5,148 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,709.37
208 1.2.4.3.15 1.2 1.2.4 UW PSL CS SW TOS-based SCADA Refinement (PY7) Controls Software: CS SW TOS-based SCADA Refinement (PY7) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $5,148.28 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 30 30 30 30 120 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,450 $ 3,450 $ 3,450 $ 3,450 $ - 0 $ - 0 $ 14,709 $ - 0 $ - 0 $ 14,709 $ 5,148 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,709.37
209 1.2.4.3.16 1.2 1.2.4 UW PSL CS SW dB Refinement (PY7) Controls Software: CS SW dB Refinement (PY7) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $5,148.28 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 30 30 30 30 120 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,450 $ 3,450 $ 3,450 $ 3,450 $ - 0 $ - 0 $ 14,709 $ - 0 $ - 0 $ 14,709 $ 5,148 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,709.37
210 1.2.4.4.4 1.2 1.2.4 UW PSL Programming and Testing at PSL Motor Drives: Programming and Testing at PSL (PSL_Engineer) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $3,171.76 $0.00 35 35 35 30 135 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,025 $ 4,025 $ - 0 $ 4,025 $ - 0 $ 3,450 $ - 0 $ 15,859 $ - 0 $ - 0 $ 15,859 $ 3,172 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $15,858.79
211 1.2.4.5.6 1.2 1.2.4 UW PSL E-Stop Resupply (PY6) E-stop: Estop PY6 Resupply Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,007.98 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,880 $ - 0 $ - 0 $ 2,880 $ 1,008 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,879.96
212 1.2.4.5.6 1.2 1.2.4 UW PSL E-Stop Resupply (PY6) E-stop: Estop PY6 Resupply Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C4 35.0% $674.91 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,848 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,928 $ - 0 $ - 0 $ 1,928 $ 675 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,928.32
213 1.2.4.5.6 1.2 1.2.4 UW PSL E-Stop Resupply (PY6) E-stop: Estop PY6 Resupply CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,826.06 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 5000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,000 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,217 $ - 0 $ - 0 $ 5,217 $ 1,826 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,217.31
214 1.2.4.5.7 1.2 1.2.4 UW PSL E-Stop Resupply (PY7) E-stop: Estop PY7 Resupply Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,029.66 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,942 $ - 0 $ - 0 $ 2,942 $ 1,030 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,941.87
215 1.2.4.5.7 1.2 1.2.4 UW PSL E-Stop Resupply (PY7) E-stop: Estop PY7 Resupply Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C4 35.0% $689.42 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,848 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,970 $ - 0 $ - 0 $ 1,970 $ 689 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,969.78
216 1.2.4.5.7 1.2 1.2.4 UW PSL E-Stop Resupply (PY7) E-stop: Estop PY7 Resupply CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,865.32 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 5000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,000 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,329 $ - 0 $ - 0 $ 5,329 $ 1,865 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,329.48
217 1.2.4.6.3 1.2 1.2.4 UW PSL Update Workspace (desk, chairs), Procure Printer & Accessories DCC: Update Workspace (desk, chairs), Procure Printer & Accessories Labor Hours Labor Hours EN-EE C - Engineering Buildup $115 $115 0.00% 0.00% Off Ice C3 20.0% $751.82 $0.00 8 24 32 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,759 $ - 0 $ - 0 $ 3,759 $ 752 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,759.12
218 1.2.4.6.3 1.2 1.2.4 UW PSL Update Workspace (desk, chairs), Procure Printer & Accessories DCC: Update Workspace (desk, chairs), Procure Printer & Accessories CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $1,375.19 $0.00 10770 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,770 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 11,002 $ - 0 $ - 0 $ 11,002 $ 1,375 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $11,001.56
219 1.2.4.7.3 1.2 1.2.4 UW PSL Fabricate and Test SES & SES to TOS Cables - Signal Outdoor Cables: Fabricate and Test SES & SES to TOS Cables - Signal Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 10 10 10 10 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,150 $ 1,150 $ 1,150 $ 1,150 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
220 1.2.4.7.4 1.2 1.2.4 UW PSL CS Cabling Resupply (PY6) Outdoor Cables: CS Cabling Resupply (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,007.98 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 12 12 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ 1,380 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,880 $ - 0 $ - 0 $ 2,880 $ 1,008 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,879.96
221 1.2.4.7.4 1.2 1.2.4 UW PSL CS Cabling Resupply (PY6) Outdoor Cables: CS Cabling Resupply (PY6) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,826.06 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2500 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ 2,500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,217 $ - 0 $ - 0 $ 5,217 $ 1,826 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,217.31
222 1.2.4.7.5 1.2 1.2.4 UW PSL CS Cabling Resupply (PY7) Outdoor Cables: CS Cabling Resupply (PY7) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,029.66 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 12 12 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ 1,380 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,942 $ - 0 $ - 0 $ 2,942 $ 1,030 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,941.87
223 1.2.4.7.5 1.2 1.2.4 UW PSL CS Cabling Resupply (PY7) Outdoor Cables: CS Cabling Resupply (PY7) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,865.32 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2500 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ 2,500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,329 $ - 0 $ - 0 $ 5,329 $ 1,865 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,329.48
224 1.2.4.8.1.2.1 1.2 1.2.4 UW PSL Procure sample temperature display and digital thermostat, install in test bed heater, test CS: Procure sample temperature display and digital thermostat, install in test bed heater, test Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
225 1.2.4.8.1.2.1 1.2 1.2.4 UW PSL Procure sample temperature display and digital thermostat, install in test bed heater, test CS: Procure sample temperature display and digital thermostat, install in test bed heater, test CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C2 12.5% $38.31 $0.00 300 0 $ 300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 306 $ - 0 $ - 0 $ 306 $ 38 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $306.45
226 1.2.4.8.1.2.2 1.2 1.2.4 UW PSL Select and procure temperature display units for heater controls, conversion hardware CS: Select and procure temperature display units for heater controls, conversion hardware Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
227 1.2.4.8.1.2.2 1.2 1.2.4 UW PSL Select and procure temperature display units for heater controls, conversion hardware CS: Select and procure temperature display units for heater controls, conversion hardware CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $574.59 $0.00 4500 0 $ - 0 $ 4,500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,597 $ - 0 $ - 0 $ 4,597 $ 575 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,596.75
228 1.2.4.8.1.2.3 1.2 1.2.4 UW PSL Replace temperature display units, remove RTD DGHs, transfer net connections, test CS: Replace temperature display units, remove RTD DGHs, transfer net connections, test Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 24 24 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
229 1.2.4.8.1.2.3 1.2 1.2.4 UW PSL Replace temperature display units, remove RTD DGHs, transfer net connections, test CS: Replace temperature display units, remove RTD DGHs, transfer net connections, test Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $1,573.11 $0.00 100 100 $ - 0 $ - 0 $ 7,700 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,866 $ - 0 $ - 0 $ 7,866 $ 1,573 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,865.55
230 1.2.4.8.1.2.4 1.2 1.2.4 UW PSL Select and procure digital thermostats for heater controls, conversion hardware CS: Select and procure digital thermostats for heater controls, conversion hardware Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
231 1.2.4.8.1.2.4 1.2 1.2.4 UW PSL Select and procure digital thermostats for heater controls, conversion hardware CS: Select and procure digital thermostats for heater controls, conversion hardware CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $633.59 $0.00 4962 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,962 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,069 $ - 0 $ - 0 $ 5,069 $ 634 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,068.68
232 1.2.4.8.1.2.5 1.2 1.2.4 UW PSL Write thermostat field replacement procedure CS: Write thermostat field replacement procedure Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
233 1.2.4.8.1.3.1 1.2 1.2.4 UW PSL Write rewiring and test instructions for MHP E-stop boxes (fixes switch contact selections made in Gen 1) CS: Write rewiring and test instructions for MHP E-stop boxes (fixes switch contact selections made in Gen 1) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 24 24 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
234 1.2.4.8.1.3.2 1.2 1.2.4 UW PSL Write test procedures for dry heater tests CS: Write test procedures for dry heater tests Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $751.82 $0.00 16 16 32 $ - 0 $ 1,840 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,759 $ - 0 $ - 0 $ 3,759 $ 752 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,759.12
235 1.2.4.8.1.3.3 1.2 1.2.4 UW PSL Assemble equipment to test flow meters (excitation coil and portable pulse generator) CS: Assemble equipment to test flow meters (excitation coil and portable pulse generator) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 12 12 24 $ - 0 $ - 0 $ 1,380 $ 1,380 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
236 1.2.4.8.1.3.3 1.2 1.2.4 UW PSL Assemble equipment to test flow meters (excitation coil and portable pulse generator) CS: Assemble equipment to test flow meters (excitation coil and portable pulse generator) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C3 20.0% $155.06 $0.00 759 0 $ - 0 $ - 0 $ 759 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 775 $ - 0 $ - 0 $ 775 $ 155 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $775.32
237 1.2.4.8.1.3.4 1.2 1.2.4 UW PSL Write flow meter test procedure and assemble test kit CS: Write flow meter test procedure and assemble test kit Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 12 12 24 $ - 0 $ - 0 $ - 0 $ 1,380 $ 1,380 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
238 1.2.4.8.1.5.1 1.2 1.2.4 UW PSL Develop heater-based sensor readout; (heater temp/flow manifold pressures CS: Develop heater-based sensor readout; (heater temp/flow manifold pressures Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $2,819.34 $0.00 120 120 $ - 0 $ - 0 $ - 0 $ 13,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,097 $ - 0 $ - 0 $ 14,097 $ 2,819 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,096.70
239 1.2.4.8.1.5.2 1.2 1.2.4 UW PSL Develop environmental sensor readout; (bldg temps, smoke, e-stop) CS: Develop environmental sensor readout; (bldg temps, smoke, e-stop) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $845.80 $0.00 36 36 $ - 0 $ - 0 $ - 0 $ 4,140 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,229 $ - 0 $ - 0 $ 4,229 $ 846 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,229.01
240 1.2.4.8.1.5.3 1.2 1.2.4 UW PSL Develop heater control; (ON/OFF, Thermostat setpoint) CS: Develop heater control; (ON/OFF, Thermostat setpoint) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
241 1.2.4.8.1.5.7 1.2 1.2.4 UW PSL Implement interlocks CS: Implement interlocks Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $469.89 $0.00 20 20 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,349 $ - 0 $ - 0 $ 2,349 $ 470 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,349.45
242 1.2.4.8.1.5.8 1.2 1.2.4 UW PSL Document Subsystem CS: Document Subsystem Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $211.45 $0.00 20 20 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,349 $ - 0 $ - 0 $ 2,349 $ 211 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,349.45
243 1.2.4.8.2.1.3 1.2 1.2.4 UW PSL Develop VFD installation strategy & document, procure materials CS: Develop VFD installation strategy & document, procure materials Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
244 1.2.4.8.2.1.3 1.2 1.2.4 UW PSL Develop VFD installation strategy & document, procure materials CS: Develop VFD installation strategy & document, procure materials Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $251.70 $0.00 16 16 $ 1,232 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,258 $ - 0 $ - 0 $ 1,258 $ 252 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,258.49
245 1.2.4.8.2.3.2 1.2 1.2.4 UW PSL Select and procure new power supplies for the network box, procure one RS-485 gateway CS: Select and procure new power supplies for the network box, procure one RS-485 gateway Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
246 1.2.4.8.2.3.2 1.2 1.2.4 UW PSL Select and procure new power supplies for the network box, procure one RS-485 gateway CS: Select and procure new power supplies for the network box, procure one RS-485 gateway CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $118.11 $0.00 925 0 $ 925 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 945 $ - 0 $ - 0 $ 945 $ 118 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $944.89
247 1.2.4.8.2.3.3 1.2 1.2.4 UW PSL Redesign and rebuild PHS network box with new I/O, document as-built configuration CS: Redesign and rebuild PHS network box with new I/O, document as-built configuration Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $3,383.21 $0.00 44 100 144 $ 5,060 $ 11,500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 16,916 $ - 0 $ - 0 $ 16,916 $ 3,383 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $16,916.04
248 1.2.4.8.2.3.3 1.2 1.2.4 UW PSL Redesign and rebuild PHS network box with new I/O, document as-built configuration CS: Redesign and rebuild PHS network box with new I/O, document as-built configuration Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $629.24 $0.00 20 20 40 $ 1,540 $ 1,540 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,146 $ - 0 $ - 0 $ 3,146 $ 629 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,146.22
249 1.2.4.8.2.3.3 1.2 1.2.4 UW PSL Redesign and rebuild PHS network box with new I/O, document as-built configuration CS: Redesign and rebuild PHS network box with new I/O, document as-built configuration CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C3 20.0% $786.56 $0.00 3850 0 $ 3,850 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,933 $ - 0 $ - 0 $ 3,933 $ 787 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,932.78
250 1.2.4.8.2.3.4 1.2 1.2.4 UW PSL Indicate where approximately 20 sensor and network cables terminate in PHS and document config. plans CS: Indicate where approximately 20 sensor and network cables terminate in PHS and document config. plans Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $2,537.41 $0.00 50 58 108 $ - 0 $ 5,750 $ 6,670 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 12,687 $ - 0 $ - 0 $ 12,687 $ 2,537 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $12,687.03
251 1.2.4.8.2.3.5 1.2 1.2.4 UW PSL Configure heater-mounted DGH modules, develop and document DGH installation and test plans CS: Configure heater-mounted DGH modules, develop and document DGH installation and test plans Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 12 12 24 $ - 0 $ - 0 $ 1,380 $ 1,380 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
252 1.2.4.8.2.3.5 1.2 1.2.4 UW PSL Configure heater-mounted DGH modules, develop and document DGH installation and test plans CS: Configure heater-mounted DGH modules, develop and document DGH installation and test plans Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $251.70 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ 1,232 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,258 $ - 0 $ - 0 $ 1,258 $ 252 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,258.49
253 1.2.4.8.2.4 1.2 1.2.4 UW PSL CS PHS HW4: New E-stop Slap Switch & Box for Outdoor Location CS PHS HW4: New estop slap switch and box for outdoor location Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
254 1.2.4.8.2.4 1.2 1.2.4 UW PSL CS PHS HW4: New E-stop Slap Switch & Box for Outdoor Location CS PHS HW4: New estop slap switch and box for outdoor location CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $40.86 $0.00 200 0 $ - 0 $ - 0 $ - 0 $ 200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 204 $ - 0 $ - 0 $ 204 $ 41 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $204.30
255 1.2.4.8.2.5 1.2 1.2.4 UW PSL CS PHS HW5: Develop heater test procedures, configure test tools, document test plans CS PHS HW5: Develop heater test procedures, configure test tools, document test plans Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $845.80 $0.00 18 18 36 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,070 $ 2,070 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,229 $ - 0 $ - 0 $ 4,229 $ 846 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,229.01
256 1.2.4.8.2.7.1 1.2 1.2.4 UW PSL Develop and document test plans for all PHS system components CS: Develop and document test plans for all PHS system components Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $845.80 $0.00 18 18 36 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,070 $ 2,070 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,229 $ - 0 $ - 0 $ 4,229 $ 846 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,229.01
257 1.2.4.8.2.7.2 1.2 1.2.4 UW PSL Review Gen-1 docs, identify where sensor connections terminated, plan for reconnection and test CS: Develop and document test plans for all PHS system components Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $845.80 $0.00 18 18 36 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,070 $ 2,070 $ - 0 $ - 0 $ - 0 $ 4,229 $ - 0 $ - 0 $ 4,229 $ 846 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,229.01
258 1.2.4.8.2.8.1 1.2 1.2.4 UW PSL Develop heater-based sensor readout; (heater temp/flow manifold pressures) CS: Develop heater-based sensor readout; (heater temp/flow manifold pressures) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 24 24 $ - 0 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
259 1.2.4.8.2.8.2 1.2 1.2.4 UW PSL Develop environmental sensor readout; (bldg temps, smoke, e-stop) CS: Develop environmental sensor readout; (bldg temps, smoke, e-stop) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
260 1.2.4.8.2.8.3 1.2 1.2.4 UW PSL Develop water tank sensors readout CS: Develop water tank sensors readout Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 12 12 24 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,380 $ 1,380 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
261 1.2.4.8.2.8.4 1.2 1.2.4 UW PSL Develop heater control; (ON/OFF, Thermostat setpoint) CS: Develop heater control; (ON/OFF, Thermostat setpoint) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
262 1.2.4.8.2.8.5 1.2 1.2.4 UW PSL Develop AB drive/pump control; (variable speed velocity drives) CS: Develop AB drive/pump control; (variable speed velocity drives) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
263 1.2.4.8.2.8.10 1.2 1.2.4 UW PSL Implement interlocks CS: Implement interlocks Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $469.89 $0.00 20 20 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,349 $ - 0 $ - 0 $ 2,349 $ 470 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,349.45
264 1.2.4.8.2.8.11 1.2 1.2.4 UW PSL Document Subsystem CS: Implement interlocks Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
265 1.2.4.8.3.1.3 1.2 1.2.4 UW PSL Configure VFDs with accessories, connection pigtails, document CS: Configure VFDs with accessories, connection pigtails, document Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 24 24 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
266 1.2.4.8.3.1.3 1.2 1.2.4 UW PSL Configure VFDs with accessories, connection pigtails, document CS: Configure VFDs with accessories, connection pigtails, document Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $629.24 $0.00 20 20 40 $ 1,540 $ 1,540 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,146 $ - 0 $ - 0 $ 3,146 $ 629 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,146.22
267 1.2.4.8.3.1.3 1.2 1.2.4 UW PSL Configure VFDs with accessories, connection pigtails, document CS: Configure VFDs with accessories, connection pigtails, document CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $1,021.50 $0.00 5000 0 $ 5,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,108 $ - 0 $ - 0 $ 5,108 $ 1,022 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,107.50
268 1.2.4.8.3.1.4 1.2 1.2.4 UW PSL Develop VFD mechanical and electrical installation strategies & document, procure materials CS: Develop VFD mechanical and electrical installation strategies & document, procure materials Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ - 0 $ - 0 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
269 1.2.4.8.3.1.4 1.2 1.2.4 UW PSL Develop VFD mechanical and electrical installation strategies & document, procure materials CS: Develop VFD mechanical and electrical installation strategies & document, procure materials Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $1,258.49 $0.00 80 80 $ - 0 $ - 0 $ 6,160 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,292 $ - 0 $ - 0 $ 6,292 $ 1,258 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $6,292.44
270 1.2.4.8.3.1.4 1.2 1.2.4 UW PSL Develop VFD mechanical and electrical installation strategies & document, procure materials CS: Develop VFD mechanical and electrical installation strategies & document, procure materials CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $408.60 $0.00 2000 0 $ - 0 $ - 0 $ 2,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,043 $ - 0 $ - 0 $ 2,043 $ 409 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,043.00
271 1.2.4.8.3.1.5 1.2 1.2.4 UW PSL SW configuration and autotuning, make plan - MDCR/LW, DSHR/LW, RWHR, RWCR, Tower Hoist CS: SW configuration and autotuning, make plan - MDCR/LW, DSHR/LW, RWHR, RWCR, Tower Hoist Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,879.56 $0.00 80 80 $ - 0 $ - 0 $ - 0 $ 9,200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,398 $ - 0 $ - 0 $ 9,398 $ 1,880 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,397.80
272 1.2.4.8.3.2.2 1.2 1.2.4 UW PSL Document changes to E-stop and Reel stop interfaces to motor drives, procure materials, implement CS: Document changes to E-stop and Reel stop interfaces to motor drives, procure materials, implement Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $2,819.34 $0.00 120 120 $ 13,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,097 $ - 0 $ - 0 $ 14,097 $ 2,819 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,096.70
273 1.2.4.8.3.2.2 1.2 1.2.4 UW PSL Document changes to E-stop and Reel stop interfaces to motor drives, procure materials, implement CS: Document changes to E-stop and Reel stop interfaces to motor drives, procure materials, implement Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $629.24 $0.00 40 40 $ 3,080 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,146 $ - 0 $ - 0 $ 3,146 $ 629 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,146.22
274 1.2.4.8.3.2.2 1.2 1.2.4 UW PSL Document changes to E-stop and Reel stop interfaces to motor drives, procure materials, implement CS: Document changes to E-stop and Reel stop interfaces to motor drives, procure materials, implement CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $817.20 $0.00 4000 0 $ 4,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,086 $ - 0 $ - 0 $ 4,086 $ 817 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,086.00
275 1.2.4.8.3.2.3 1.2 1.2.4 UW PSL Test refurbished E-stop panels with reel safety junction boxes, I/O boxes, network boxes, drives CS: Test refurbished E-stop panels with reel safety junction boxes, I/O boxes, network boxes, drives Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $4,698.90 $0.00 200 200 $ - 0 $ 23,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 23,495 $ - 0 $ - 0 $ 23,495 $ 4,699 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $23,494.50
276 1.2.4.8.3.2.3 1.2 1.2.4 UW PSL Test refurbished E-stop panels with reel safety junction boxes, I/O boxes, network boxes, drives CS: Test refurbished E-stop panels with reel safety junction boxes, I/O boxes, network boxes, drives Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $1,258.49 $0.00 80 80 $ - 0 $ 6,160 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,292 $ - 0 $ - 0 $ 6,292 $ 1,258 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $6,292.44
277 1.2.4.8.3.2.3 1.2 1.2.4 UW PSL Test refurbished E-stop panels with reel safety junction boxes, I/O boxes, network boxes, drives CS: Test refurbished E-stop panels with reel safety junction boxes, I/O boxes, network boxes, drives CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $51.08 $0.00 250 0 $ - 0 $ 250 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 255 $ - 0 $ - 0 $ 255 $ 51 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $255.38
278 1.2.4.8.3.2.6 1.2 1.2.4 UW PSL Design new E-stop controllers for TOS, build and test boxes CS: Design new E-stop controllers for TOS, build and test boxes Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $2,819.34 $0.00 30 30 30 30 120 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,450 $ 3,450 $ 3,450 $ 3,450 $ - 0 $ - 0 $ - 0 $ 14,097 $ - 0 $ - 0 $ 14,097 $ 2,819 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,096.70
279 1.2.4.8.3.2.6 1.2 1.2.4 UW PSL Design new E-stop controllers for TOS, build and test boxes CS: Design new E-stop controllers for TOS, build and test boxes Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $1,258.49 $0.00 20 20 20 20 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,540 $ 1,540 $ 1,540 $ 1,540 $ - 0 $ - 0 $ - 0 $ 6,292 $ - 0 $ - 0 $ 6,292 $ 1,258 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $6,292.44
280 1.2.4.8.3.2.6 1.2 1.2.4 UW PSL Design new E-stop controllers for TOS, build and test boxes CS: Design new E-stop controllers for TOS, build and test boxes CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $612.90 $0.00 1500 1500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,500 $ 1,500 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,065 $ - 0 $ - 0 $ 3,065 $ 613 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,064.50
281 1.2.4.8.3.3.1 1.2 1.2.4 UW PSL Spec and procure new power supplies for TOS network boxes, procure DGH gateway, document changes CS: Spec and procure new power supplies for TOS network boxes, procure DGH gateway, document changes Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 24 24 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
282 1.2.4.8.3.3.1 1.2 1.2.4 UW PSL Spec and procure new power supplies for TOS network boxes, procure DGH gateway, document changes CS: Spec and procure new power supplies for TOS network boxes, procure DGH gateway, document changes CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $210.68 $0.00 1650 0 $ - 0 $ - 0 $ 1,650 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,685 $ - 0 $ - 0 $ 1,685 $ 211 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,685.48
283 1.2.4.8.3.3.2 1.2 1.2.4 UW PSL Document plans for TOS network box upgrades, specify and procure tools and materials CS: Document plans for TOS network box upgrades, specify and procure tools and materials Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 12 12 24 $ - 0 $ - 0 $ - 0 $ 1,380 $ 1,380 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
284 1.2.4.8.3.3.2 1.2 1.2.4 UW PSL Document plans for TOS network box upgrades, specify and procure tools and materials CS: Document plans for TOS network box upgrades, specify and procure tools and materials Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $251.70 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,232 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,258 $ - 0 $ - 0 $ 1,258 $ 252 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,258.49
285 1.2.4.8.3.3.2 1.2 1.2.4 UW PSL Document plans for TOS network box upgrades, specify and procure tools and materials CS: Document plans for TOS network box upgrades, specify and procure tools and materials CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $81.72 $0.00 400 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 400 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 409 $ - 0 $ - 0 $ 409 $ 82 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $408.60
286 1.2.4.8.3.3.3 1.2 1.2.4 UW PSL Spec TOS network switch location, spec cables to drives, I/O boxes, network box, DCC modem, PC, PLC, e-stop controller CS: Spec TOS nework switch location, spec cables to drives, I/O boxes, network box, DCC modem, PC, PLC, e-stop controller Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,409.67 $0.00 30 30 60 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,450 $ 3,450 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,048 $ - 0 $ - 0 $ 7,048 $ 1,410 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,048.35
287 1.2.4.8.3.3.3 1.2 1.2.4 UW PSL Spec TOS network switch location, spec cables to drives, I/O boxes, network box, DCC modem, PC, PLC, e-stop controller CS: Spec TOS nework switch location, spec cables to drives, I/O boxes, network box, DCC modem, PC, PLC, e-stop controller Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $503.40 $0.00 16 16 32 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,232 $ 1,232 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,517 $ - 0 $ - 0 $ 2,517 $ 503 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,516.98
288 1.2.4.8.3.3.3 1.2 1.2.4 UW PSL Spec TOS network switch location, spec cables to drives, I/O boxes, network box, DCC modem, PC, PLC, e-stop controller CS: Spec TOS nework switch location, spec cables to drives, I/O boxes, network box, DCC modem, PC, PLC, e-stop controller CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $204.30 $0.00 1000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,022 $ - 0 $ - 0 $ 1,022 $ 204 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,021.50
289 1.2.4.8.3.3.4 1.2 1.2.4 UW PSL Design enclosures for TOS PLCs and attached I/O used for payout encoders, load cells; procure parts CS: Design enclosures for TOS PLCs and attached I/O used for payout encoders, load cells; procure parts Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,879.56 $0.00 20 30 30 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 3,450 $ 3,450 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,398 $ - 0 $ - 0 $ 9,398 $ 1,880 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,397.80
290 1.2.4.8.3.3.4 1.2 1.2.4 UW PSL Design enclosures for TOS PLCs and attached I/O used for payout encoders, load cells; procure parts CS: Design enclosures for TOS PLCs and attached I/O used for payout encoders, load cells; procure parts CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $408.60 $0.00 2000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,043 $ - 0 $ - 0 $ 2,043 $ 409 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,043.00
291 1.2.4.8.3.3.5 1.2 1.2.4 UW PSL Construct enclosures for TOS PLCs and attached I/O , test CS: Construct enclosures for TOS PLCs and attached I/O , test Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,409.67 $0.00 20 20 20 60 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ 2,300 $ - 0 $ - 0 $ 7,048 $ - 0 $ - 0 $ 7,048 $ 1,410 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,048.35
292 1.2.4.8.3.3.5 1.2 1.2.4 UW PSL Construct enclosures for TOS PLCs and attached I/O , test CS: Construct enclosures for TOS PLCs and attached I/O , test Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $1,132.64 $0.00 20 32 20 72 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,540 $ 2,464 $ 1,540 $ - 0 $ - 0 $ 5,663 $ - 0 $ - 0 $ 5,663 $ 1,133 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,663.20
293 1.2.4.8.3.3.5 1.2 1.2.4 UW PSL Construct enclosures for TOS PLCs and attached I/O , test CS: Construct enclosures for TOS PLCs and attached I/O , test CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $40.86 $0.00 200 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 200 $ - 0 $ - 0 $ - 0 $ - 0 $ 204 $ - 0 $ - 0 $ 204 $ 41 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $204.30
294 1.2.4.8.3.5.1 1.2 1.2.4 UW PSL Develop and document on-ice test plans for E-stop, Reel-Stop, and Fault Detection hardware CS: Develop and document on-ice test plans for E-stop, Reel-Stop, and Fault Detection hardware Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
295 1.2.4.8.3.5.2 1.2 1.2.4 UW PSL Develop and document on-ice test plans for integrated hardware CS: Develop and document on-ice test plans for integrated hardware Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $2,819.34 $0.00 60 60 120 $ - 0 $ - 0 $ - 0 $ 6,900 $ 6,900 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,097 $ - 0 $ - 0 $ 14,097 $ 2,819 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,096.70
296 1.2.4.8.3.6.2 1.2 1.2.4 UW PSL Test load cells and payout encoders with PLC, verify functionality required for payout control, load sharing CS: Test load cells and payout encoders with PLC, verify functionality required for payout control, load sharing Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $4,698.90 $0.00 100 100 200 $ - 0 $ 11,500 $ 11,500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 23,495 $ - 0 $ - 0 $ 23,495 $ 4,699 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $23,494.50
297 1.2.4.8.3.8 1.2 1.2.4 UW PSL CS TOS HW9: Tower Hoist Reconnect Materials TOS2, Identify and Procure CS TOS HW9: Tower hoist reconnect materials TOS2, identify and procure Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
298 1.2.4.8.3.8 1.2 1.2.4 UW PSL CS TOS HW9: Tower Hoist Reconnect Materials TOS2, Identify and Procure CS TOS HW9: Tower hoist reconnect materials TOS2, identify and procure CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $204.30 $0.00 1000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,022 $ - 0 $ - 0 $ 1,022 $ 204 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,021.50
299 1.2.4.8.3.9 1.2 1.2.4 UW PSL CS TOS HW10: Review deployment plans and HW, integrate with drill CS TOS HW10: Review deployment plans and HW, integrate with drill Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $2,819.34 $0.00 30 30 30 30 120 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,450 $ 3,450 $ 3,450 $ 3,450 $ - 0 $ - 0 $ - 0 $ 14,097 $ - 0 $ - 0 $ 14,097 $ 2,819 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,096.70
300 1.2.4.8.3.10.1 1.2 1.2.4 UW PSL Develop general control/monitoring software CS: Develop general control/monitoring software Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $2,819.34 $0.00 40 40 40 120 $ - 0 $ - 0 $ - 0 $ 4,600 $ 4,600 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,097 $ - 0 $ - 0 $ 14,097 $ 2,819 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,096.70
301 1.2.4.8.3.10.2 1.2 1.2.4 UW PSL Develop reel control software(MCR/LW, DSHR/LW, RWHR, RWCR, Tower Winch) CS: Develop reel control software(MCR/LW, DSHR/LW, RWHR, RWCR, Tower Winch) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,879.56 $0.00 40 40 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,398 $ - 0 $ - 0 $ 9,398 $ 1,880 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,397.80
302 1.2.4.8.3.10.3 1.2 1.2.4 UW PSL Develop tension-sharing algorithm software (MCR/LW, DSHR/LW) CS: Develop tension-sharing algorithm software (MCR/LW, DSHR/LW) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $2,819.34 $0.00 30 30 30 30 120 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,450 $ 3,450 $ 3,450 $ 3,450 $ - 0 $ - 0 $ 14,097 $ - 0 $ - 0 $ 14,097 $ 2,819 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,096.70
303 1.2.4.8.3.10.4 1.2 1.2.4 UW PSL Develop drillhead data monitoring interface) CS: Develop drillhead data monitoring interface) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
304 1.2.4.8.3.10.8 1.2 1.2.4 UW PSL Implement interlocks CS: Implement interlocks Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
305 1.2.4.8.3.10.9 1.2 1.2.4 UW PSL Document Subsystem CS: Document Subsystem Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
306 1.2.4.8.4.1 1.2 1.2.4 UW PSL CS HW Drillhead sofware/hardware production version CS HW Drillhead sofware/hardware production version Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,409.67 $0.00 30 30 60 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,450 $ 3,450 $ - 0 $ - 0 $ - 0 $ 7,048 $ - 0 $ - 0 $ 7,048 $ 1,410 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,048.35
307 1.2.4.8.4.1 1.2 1.2.4 UW PSL CS HW Drillhead sofware/hardware production version CS HW Drillhead sofware/hardware production version CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $320.50 $0.00 2510 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,510 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,564 $ - 0 $ - 0 $ 2,564 $ 320 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,563.97
308 1.2.4.8.4.2.1 1.2 1.2.4 UW PSL Port C-Lang ingest process to rPI platform & test CS: Port C-Lang ingest process to rPI platform & test Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $751.82 $0.00 16 16 32 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ 1,840 $ - 0 $ - 0 $ 3,759 $ - 0 $ - 0 $ 3,759 $ 752 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,759.12
309 1.2.4.8.4.2.2 1.2 1.2.4 UW PSL Integrate rPI platform into PLC infrastructure CS: Integrate rPI platform into PLC infrastructure Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
310 1.2.4.8.4.2.3 1.2 1.2.4 UW PSL Document Subsystem CS: Document Subsystem Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
311 1.2.4.8.5.1 1.2 1.2.4 UW PSL Design, construct and test master E-stop controller, produce documentation and user instructions CS: Design, construct and test master E-stop controller, produce documentation and user instructions Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $3,759.12 $0.00 40 40 40 40 160 $ - 0 $ - 0 $ - 0 $ 4,600 $ 4,600 $ 4,600 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 18,796 $ - 0 $ - 0 $ 18,796 $ 3,759 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $18,795.60
312 1.2.4.8.5.1 1.2 1.2.4 UW PSL Design, construct and test master E-stop controller, produce documentation and user instructions CS: Design, construct and test master E-stop controller, produce documentation and user instructions Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $629.24 $0.00 10 10 10 10 40 $ - 0 $ - 0 $ - 0 $ 770 $ 770 $ 770 $ 770 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,146 $ - 0 $ - 0 $ 3,146 $ 629 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,146.22
313 1.2.4.8.5.1 1.2 1.2.4 UW PSL Design, construct and test master E-stop controller, produce documentation and user instructions CS: Design, construct and test master E-stop controller, produce documentation and user instructions CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $612.90 $0.00 1500 1500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,500 $ 1,500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,065 $ - 0 $ - 0 $ 3,065 $ 613 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,064.50
314 1.2.4.8.5.2 1.2 1.2.4 UW PSL Design and construct general-purpose I/O box for fuel sled, gather required component stock to install CS: Design and construct general-purpose I/O box for fuel sled, gather required component stock to install Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,879.56 $0.00 20 40 20 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 4,600 $ 2,300 $ - 0 $ - 0 $ - 0 $ 9,398 $ - 0 $ - 0 $ 9,398 $ 1,880 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,397.80
315 1.2.4.8.5.2 1.2 1.2.4 UW PSL Design and construct general-purpose I/O box for fuel sled, gather required component stock to install CS: Design and construct general-purpose I/O box for fuel sled, gather required component stock to install CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $786.56 $0.00 3850 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,850 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,933 $ - 0 $ - 0 $ 3,933 $ 787 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,932.78
316 1.2.4.8.5.3 1.2 1.2.4 UW PSL Procure 20 kW three-phase heater for DCC and 208V breakers CS: Procure 20 kW three-phase heater for DCC and 208V breakers Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $251.70 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,232 $ - 0 $ - 0 $ - 0 $ 1,258 $ - 0 $ - 0 $ 1,258 $ 252 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,258.49
317 1.2.4.8.5.3 1.2 1.2.4 UW PSL Procure 20 kW three-phase heater for DCC and 208V breakers Procure 20 kW three-phase heater for DCC and 208V breakers CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $402.47 $0.00 3152 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,152 $ - 0 $ - 0 $ - 0 $ 3,220 $ - 0 $ - 0 $ 3,220 $ 402 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,219.77
318 1.2.4.8.5.4 1.2 1.2.4 UW PSL WT1 VT pump drives: procure, configure, rewire plan CS: WT1 VT pump drives: procure, configure, rewire plan Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
319 1.2.4.8.5.4 1.2 1.2.4 UW PSL WT1 VT pump drives: procure, configure, rewire plan CS: WT1 VT pump drives: procure, configure, rewire plan CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $649.04 $0.00 5083 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,083 $ - 0 $ - 0 $ - 0 $ 5,192 $ - 0 $ - 0 $ 5,192 $ 649 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,192.28
320 1.2.4.8.5.5 1.2 1.2.4 UW PSL WT1 VT pump drives: final configure CS: WT1 VT pump drives: final configure Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,409.67 $0.00 30 30 60 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,450 $ 3,450 $ 7,048 $ - 0 $ - 0 $ 7,048 $ 1,410 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,048.35
321 1.2.4.8.5.6 1.2 1.2.4 UW PSL WT1 VT pump drives: install plan and kit CS: WT1 VT pump drives: install plan and kit Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,409.67 $0.00 60 60 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,900 $ 7,048 $ - 0 $ - 0 $ 7,048 $ 1,410 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,048.35
322 1.2.4.8.5.6 1.2 1.2.4 UW PSL WT1 VT pump drives: install plan and kit CS: WT1 VT pump drives: install plan and kit CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $306.45 $0.00 1500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,500 $ 1,532 $ - 0 $ - 0 $ 1,532 $ 306 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,532.25
323 1.2.4.8.5.7.1 1.2 1.2.4 UW PSL Develop fuel system sensor readout ; (multi-level tank status, control relay status ) CS: Develop fuel system sensor readout ; (multi-level tank status, control relay status ) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $845.80 $0.00 18 18 36 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,070 $ 2,070 $ - 0 $ - 0 $ 4,229 $ - 0 $ - 0 $ 4,229 $ 846 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,229.01
324 1.2.4.8.5.7.2 1.2 1.2.4 UW PSL Configure/document Point I/O Block CS: Configure/document Point I/O Block Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 8 8 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ 920 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
325 1.2.4.8.5.7.3 1.2 1.2.4 UW PSL Document Subsystem CS: Document Subsystem Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $845.80 $0.00 36 36 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,140 $ - 0 $ 4,229 $ - 0 $ - 0 $ 4,229 $ 846 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,229.01
326 1.2.4.8.5.7.4 1.2 1.2.4 UW PSL Implement interlocks CS: Implement interlocks Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $469.89 $0.00 20 20 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ - 0 $ 2,349 $ - 0 $ - 0 $ 2,349 $ 470 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,349.45
327 1.2.4.8.6.1 1.2 1.2.4 UW PSL CS Gensets HW - identify, procure, assemble CS: CS Gensets HW - identify, procure, assemble Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $959.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,800 $ - 0 $ - 0 $ 4,800 $ 960 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,799.93
328 1.2.4.8.6.1 1.2 1.2.4 UW PSL CS Gensets HW - identify, procure, assemble CS: CS Gensets HW - identify, procure, assemble Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $642.77 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,540 $ 1,540 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,214 $ - 0 $ - 0 $ 3,214 $ 643 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,213.86
329 1.2.4.8.6.1 1.2 1.2.4 UW PSL CS Gensets HW - identify, procure, assemble CS: CS Gensets HW - identify, procure, assemble CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C3 20.0% $803.47 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 3850 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,850 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,017 $ - 0 $ - 0 $ 4,017 $ 803 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,017.33
330 1.2.4.8.6.2.1 1.2 1.2.4 UW PSL Develop sensor readout; (bldg temps, fuel temps, supply/return water temps) CS: Develop sensor readout; (bldg temps, fuel temps, supply/return water temps) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $959.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,800 $ - 0 $ - 0 $ 4,800 $ 960 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,799.93
331 1.2.4.8.6.2.2 1.2 1.2.4 UW PSL Develop sensor readout; (engine jacket temps, exhaust temps, drip pan status) CS: Develop sensor readout; (engine jacket temps, exhaust temps, drip pan status) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $959.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ 4,800 $ - 0 $ - 0 $ 4,800 $ 960 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,799.93
332 1.2.4.8.6.2.3 1.2 1.2.4 UW PSL Configure/document network switch CS: Configure/document network switch Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $192.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ 960 $ - 0 $ - 0 $ 960 $ 192 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $959.99
333 1.2.4.8.6.2.4 1.2 1.2.4 UW PSL Configure/document RTA gateway to M-DGH interface CS: Configure/document RTA gateway to M-DGH interface Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $240.00 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 10 10 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,150 $ - 0 $ - 0 $ - 0 $ 1,200 $ - 0 $ - 0 $ 1,200 $ 240 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,199.98
334 1.2.4.8.6.2.5 1.2 1.2.4 UW PSL Configure/document M-DGHs CS: Configure/document M-DGHs Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $479.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ - 0 $ - 0 $ 2,400 $ - 0 $ - 0 $ 2,400 $ 480 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,399.96
335 1.2.4.8.6.2.6 1.2 1.2.4 UW PSL Document Subsystem CS: Document Subsystem Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $959.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ - 0 $ 4,800 $ - 0 $ - 0 $ 4,800 $ 960 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,799.93
336 1.2.4.8.7.1.3 1.2 1.2.4 UW PSL Develop VFD mechanical and electrical installation strategies & document, procure materials CS: Develop VFD mechanical and electrical installation strategies & document, procure materials Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,691.60 $0.00 36 36 72 $ - 0 $ - 0 $ 4,140 $ 4,140 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 8,458 $ - 0 $ - 0 $ 8,458 $ 1,692 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $8,458.02
337 1.2.4.8.7.1.3 1.2 1.2.4 UW PSL Develop VFD mechanical and electrical installation strategies & document, procure materials CS: Develop VFD mechanical and electrical installation strategies & document, procure materials CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $204.30 $0.00 1000 0 $ - 0 $ - 0 $ 1,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,022 $ - 0 $ - 0 $ 1,022 $ 204 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,021.50
338 1.2.4.8.7.2.1 1.2 1.2.4 UW PSL Define requirements and procedures for reading signals applied to HPP motor drives CS: Define requirements and procedures for reading signals applied to HPP motor drives Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
339 1.2.4.8.7.2.2 1.2 1.2.4 UW PSL Define method of verifying sensor readout accuracy (reading vs stimulus) CS: Define method of verifying sensor readout accuracy (reading vs stimulus) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
340 1.2.4.8.7.2.3 1.2 1.2.4 UW PSL Develop and document test procedures for on-ice personnel CS: Develop and document test procedures for on-ice personnel Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
341 1.2.4.8.7.3.1 1.2 1.2.4 UW PSL Define core HPP PLC functions and requirements, define needed I/O connections CS: Define core HPP PLC functions and requirements, define needed I/O connections Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 20 20 40 $ - 0 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
342 1.2.4.8.7.3.2 1.2 1.2.4 UW PSL Select PLC, Enclosure, Power supplies, I/O expansion cards, power distribution, connectors and cables CS: Select PLC, Enclosure, Power supplies, I/O expansion cards, power distribution, connectors and cables Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 20 20 40 $ - 0 $ - 0 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
343 1.2.4.8.7.3.3 1.2 1.2.4 UW PSL Design and Construct PLC enclosure CS: Design and Construct PLC enclosure Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $751.82 $0.00 32 32 $ - 0 $ - 0 $ - 0 $ 3,680 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,759 $ - 0 $ - 0 $ 3,759 $ 752 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,759.12
344 1.2.4.8.7.3.3 1.2 1.2.4 UW PSL Design and Construct PLC enclosure CS: Design and Construct PLC enclosure Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $629.24 $0.00 20 20 40 $ - 0 $ - 0 $ - 0 $ 1,540 $ 1,540 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,146 $ - 0 $ - 0 $ 3,146 $ 629 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,146.22
345 1.2.4.8.7.3.3 1.2 1.2.4 UW PSL Design and Construct PLC enclosure CS: Design and Construct PLC enclosure CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C3 20.0% $1,440.32 $0.00 7050 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,050 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,202 $ - 0 $ - 0 $ 7,202 $ 1,440 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,201.58
346 1.2.4.8.7.3.4 1.2 1.2.4 UW PSL Test HPP PLC enclosure with HPP Network box CS: Test HPP PLC enclosure with HPP Network box Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
347 1.2.4.8.7.4.2 1.2 1.2.4 UW PSL Procure additional drives for charge pumps (4), AC and network pigtail materials CS: Procure additional drives for charge pumps (4), AC and network pigtail materials Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
348 1.2.4.8.7.4.2 1.2 1.2.4 UW PSL Procure additional drives for charge pumps (4), AC and network pigtail materials CS: Procure additional drives for charge pumps (4), AC and network pigtail materials CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $1,852.11 $0.00 14505 0 $ - 0 $ - 0 $ - 0 $ 14,505 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,817 $ - 0 $ - 0 $ 14,817 $ 1,852 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,816.86
349 1.2.4.8.7.4.3 1.2 1.2.4 UW PSL Connectorize four drives with power and network pigtails, test each in test bed CS: Connectorize four drives with power and network pigtails, test each in test bed Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $563.87 $0.00 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 564 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
350 1.2.4.8.7.4.3 1.2 1.2.4 UW PSL Connectorize four drives with power and network pigtails, test each in test bed CS: Connectorize four drives with power and network pigtails, test each in test bed Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $629.24 $0.00 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,540 $ 1,540 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,146 $ - 0 $ - 0 $ 3,146 $ 629 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,146.22
351 1.2.4.8.7.4.3 1.2 1.2.4 UW PSL Connectorize four drives with power and network pigtails, test each in test bed CS: Connectorize four drives with power and network pigtails, test each in test bed CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $204.30 $0.00 1000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,022 $ - 0 $ - 0 $ 1,022 $ 204 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,021.50
352 1.2.4.8.7.7.1 1.2 1.2.4 UW PSL Select and procure E-stop relays for pump VFD Enable signals CS: Select and procure E-stop relays for pump VFD Enable signals Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
353 1.2.4.8.7.7.1 1.2 1.2.4 UW PSL Select and procure E-stop relays for pump VFD Enable signals CS: Select and procure E-stop relays for pump VFD Enable signals CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $40.86 $0.00 200 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 204 $ - 0 $ - 0 $ 204 $ 41 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $204.30
354 1.2.4.8.7.7.2 1.2 1.2.4 UW PSL Develop and document rewiring instructions for HPP E-stop box CS: Develop and document rewiring instructions for HPP E-stop box Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
355 1.2.4.8.7.9.1 1.2 1.2.4 UW PSL Develop and document test plans for all HPP system components CS: Develop and document test plans for all HPP system components Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $845.80 $0.00 36 36 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,140 $ - 0 $ - 0 $ - 0 $ 4,229 $ - 0 $ - 0 $ 4,229 $ 846 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,229.01
356 1.2.4.8.7.9.2 1.2 1.2.4 UW PSL Review Gen-1 docs, identify where sensor connections terminated, plan for field integration and test CS: Review Gen-1 docs, identify where sensor connections terminated, plan for field integration and test Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $751.82 $0.00 32 32 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,680 $ - 0 $ - 0 $ - 0 $ 3,759 $ - 0 $ - 0 $ 3,759 $ 752 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,759.12
357 1.2.4.8.7.10.1 1.2 1.2.4 UW PSL Develop water path sensor readout; (pressure, temp, flow) CS: Develop water path sensor readout; (pressure, temp, flow) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
358 1.2.4.8.7.10.2 1.2 1.2.4 UW PSL Develop environmental sensor readout; (bldg temps, smoke, e-stop) CS: Develop environmental sensor readout; (bldg temps, smoke, e-stop) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
359 1.2.4.8.7.10.9 1.2 1.2.4 UW PSL Implement interlocks CS: Implement interlocks Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $469.89 $0.00 20 20 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ - 0 $ - 0 $ - 0 $ 2,349 $ - 0 $ - 0 $ 2,349 $ 470 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,349.45
360 1.2.4.8.7.10.10 1.2 1.2.4 UW PSL Document Subsystem CS: Document Subsystem Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
361 1.2.4.8.8.2.1 1.2 1.2.4 UW PSL Develop ARA-drill sensor readout; (heater flows, head press, tank level) CS: Develop ARA-drill sensor readout; (heater flows, head press, tank level) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,879.56 $0.00 80 80 $ - 0 $ 9,200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,398 $ - 0 $ - 0 $ 9,398 $ 1,880 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,397.80
362 1.2.4.8.8.2.2 1.2 1.2.4 UW PSL Develop AB drive/pump control; (variable speed velocity drives) CS: Develop AB drive/pump control; (variable speed velocity drives) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 20 20 40 $ - 0 $ - 0 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
363 1.2.4.8.8.2.3 1.2 1.2.4 UW PSL Configure/document Point I/O Block CS: Configure/document Point I/O Block Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
364 1.2.4.8.8.2.4 1.2 1.2.4 UW PSL Configure/document network switch CS: Configure/document network switch Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $187.96 $0.00 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 188 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
365 1.2.4.8.8.2.5 1.2 1.2.4 UW PSL Configure/document RTA gateway to M-DGH interface CS: Configure/document RTA gateway to M-DGH interface Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
366 1.2.4.8.8.2.6 1.2 1.2.4 UW PSL Configure/document M-DGHs CS: Configure/document M-DGHs Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $469.89 $0.00 20 20 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,349 $ - 0 $ - 0 $ 2,349 $ 470 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,349.45
367 1.2.4.8.8.2.7 1.2 1.2.4 UW PSL Implement interlocks CS: Implement interlocks Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $469.89 $0.00 20 20 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,349 $ - 0 $ - 0 $ 2,349 $ 470 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,349.45
368 1.2.4.8.8.2.8 1.2 1.2.4 UW PSL Document Subsystem CS: Document Subsystem Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
369 1.2.5.2.6 1.2 1.2.5 UW PSL GEN-1, 2, 3 - Procure Batteries GEN-2, 3, PDM - Procure Batteries Labor Hours Labor Hours EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C2 12.5% $117.47 $0.00 8 8 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 940 $ - 0 $ - 0 $ 940 $ 117 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $939.78
370 1.2.5.2.6 1.2 1.2.5 UW PSL GEN-1, 2, 3 - Procure Batteries GEN-2, 3, PDM - Procure Batteries CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $255.38 $0.00 2000 0 $ 2,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,043 $ - 0 $ - 0 $ 2,043 $ 255 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,043.00
371 1.2.5.2.7 1.2 1.2.5 UW PSL Generator 2 Subcontract Repairs in New Zealand GEN-2, 3, PDM - Generator 2 Subcontract Repairs in New Zealand CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $1,890.29 $0.00 Round trip trucking (Bascik Transport) from USAP site to Terra Cat $345 NZD plus GST- $275 USD estimated. Terra Cat quoted repair of injection pump governor shaft and electronic controller - $5229.03 USD. Estimated $6500.00 USD for diagnosis/repair/testing of alternator output issue and $2800 for structural repair of the 20' ISO shipping container that houses the power plant. Terra Cat was not willing to quote without diagnosis of alternator/structural issues. Total $14,804.03 USD 7402 7402 0 $ - 0 $ 7,402 $ 7,402 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 15,122 $ - 0 $ - 0 $ 15,122 $ 1,890 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $15,122.29
372 1.2.5.2.8 1.2 1.2.5 UW PSL PDM - Procure Batteries PDM - Procure Batteries CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $76.61 $0.00 600 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 600 $ - 0 $ - 0 $ 613 $ - 0 $ - 0 $ 613 $ 77 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $612.90
373 1.2.5.2.9 1.2 1.2.5 UW PSL Develop SOW for South Pole Power Generation Technical Support Subcontract & Communicate with Vendor (PY6) GEN-2, 3, PDM - Develop SOW for South Pole Power Generation Technical Support Subcontract & Communicate with Vendor Labor Hours Labor Hours EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $959.99 $0.00 South Pole Contractor cost captured in FS2 (2023-24). 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 40 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,800 $ - 0 $ - 0 $ 4,800 $ 960 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,799.93
374 1.2.5.2.10 1.2 1.2.5 UW PSL Predeployment Coordination with Power Generation Technical Support Subcontract Vendor (PY6) GEN-2, 3, PDM - Predeployment Coordination with Power Generation Technical Support Subcontract Vendor (PY6) Labor Hours Labor Hours EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $3,324.59 $0.00 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 1,645 $ - 0 20 20 40 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,800 $ - 0 $ - 0 $ 4,800 $ 1,680 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,498.83
375 1.2.5.4.3 1.2 1.2.5 UW PSL System Elec Dist: Design & Procure Elec Dist. System: Design & Procure Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $822.31 $0.00 20 20 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,349 $ - 0 $ - 0 $ 2,349 $ 822 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,349.45
376 1.2.5.4.3 1.2 1.2.5 UW PSL System Elec Dist: Design & Procure Elec Dist. System: Design & Procure CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,952.09 $0.00 5460 0 $ 5,460 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,577 $ - 0 $ - 0 $ 5,577 $ 1,952 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,577.39
377 1.2.5.4.5 1.2 1.2.5 UW PSL System Elec Dist: Build and Test Subcomponents Elec Dist. System: Build and Test Subcomponents Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,480.15 $0.00 18 18 36 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,070 $ - 0 $ 2,070 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,229 $ - 0 $ - 0 $ 4,229 $ 1,480 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,229.01
378 1.2.5.4.8 1.2 1.2.5 UW PSL System Electrical Resupply (PY6) Elec Dist. System: System Electrical Resupply (PY6) Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,007.98 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,880 $ - 0 $ - 0 $ 2,880 $ 1,008 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,879.96
379 1.2.5.4.8 1.2 1.2.5 UW PSL System Electrical Resupply (PY6) Elec Dist. System: System Electrical Resupply (PY6) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C4 35.0% $674.91 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,848 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,928 $ - 0 $ - 0 $ 1,928 $ 675 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,928.32
380 1.2.5.4.8 1.2 1.2.5 UW PSL System Electrical Resupply (PY6) Elec Dist. System: System Electrical Resupply (PY6) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,826.06 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 5000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,217 $ - 0 $ - 0 $ 5,217 $ 1,826 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,217.31
381 1.2.5.4.10 1.2 1.2.5 UW PSL System Electrical Resupply (PY7) Elec Dist. System: System Electrical Resupply (PY7) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,029.66 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,942 $ - 0 $ - 0 $ 2,942 $ 1,030 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,941.87
382 1.2.5.4.10 1.2 1.2.5 UW PSL System Electrical Resupply (PY7) Elec Dist. System: System Electrical Resupply (PY7) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C4 35.0% $689.42 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,848 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,970 $ - 0 $ - 0 $ 1,970 $ 689 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,969.78
383 1.2.5.4.10 1.2 1.2.5 UW PSL System Electrical Resupply (PY7) Elec Dist. System: System Electrical Resupply (PY7) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,865.32 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 5000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,329 $ - 0 $ - 0 $ 5,329 $ 1,865 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,329.48
384 1.2.6.1.3 1.2 1.2.6 UW PSL Procure Repair Parts, Replacements (PY6) Water Tanks: Procure Repair Parts, Replacements (PY6) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,007.98 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,880 $ - 0 $ - 0 $ 2,880 $ 1,008 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,879.96
385 1.2.6.1.3 1.2 1.2.6 UW PSL Procure Repair Parts, Replacements (PY6) Water Tanks: Procure Repair Parts, Replacements (PY6) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,826.06 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 5000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,217 $ - 0 $ - 0 $ 5,217 $ 1,826 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,217.31
386 1.2.6.2.5 1.2 1.2.6 UW PSL Procure Repair/Replacement Components (PY5) Pumps: Procure Repair/Replacement Components (PY5) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,644.62 $0.00 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 1,645 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
387 1.2.6.2.5 1.2 1.2.6 UW PSL Procure Repair/Replacement Components (PY5) Pumps: Procure Repair/Replacement Components (PY5)) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $2,359.67 $0.00 6600 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,742 $ - 0 $ - 0 $ 6,742 $ 2,360 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $6,741.90
388 1.2.6.2.6 1.2 1.2.6 UW PSL Procure Repair/Replacement Components (PY6) Pumps: Procure Repair/Replacement Components (PY6) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,007.98 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,880 $ - 0 $ - 0 $ 2,880 $ 1,008 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,879.96
389 1.2.6.2.6 1.2 1.2.6 UW PSL Procure Repair/Replacement Components (PY6) Pumps: Procure Repair/Replacement Components (PY6) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,826.06 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 5000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,217 $ - 0 $ - 0 $ 5,217 $ 1,826 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,217.31
390 1.2.6.4.9 1.2 1.2.6 UW PSL Procure External Interconnect Materials (PY6) Interconnect: Procure External Interconnect materials (PY6) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,679.97 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,800 $ - 0 $ - 0 $ 4,800 $ 1,680 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,799.93
391 1.2.6.4.9 1.2 1.2.6 UW PSL Procure External Interconnect Materials (PY6) Interconnect: Procure External Interconnect materials (PY6) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C4 35.0% $3,853.35 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 10551 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,551 $ - 0 $ - 0 $ - 0 $ - 0 $ 11,010 $ - 0 $ - 0 $ 11,010 $ 3,853 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $11,009.57
392 1.2.6.5.1 1.2 1.2.6 UW PSL Identify Replacement Water Hoses (1-1/2", 3/4", and 1/2" Hose) MDS: Evaluate Water Hoses (1-1/2", 3/4", and 1/2" Hose) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $335.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 960 $ - 0 $ - 0 $ 960 $ 336 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $959.99
393 1.2.6.5.2 1.2 1.2.6 UW PSL Identify Replacement Fuel Hoses MDS: Evaluate Fuel Hoses Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $335.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 960 $ - 0 $ - 0 $ 960 $ 336 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $959.99
394 1.2.6.5.3 1.2 1.2.6 UW PSL Procure Replacements and Spares MDS: Procure Replacements Internal Hoses and Spares Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $671.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,920 $ - 0 $ - 0 $ 1,920 $ 672 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,919.97
395 1.2.6.5.3 1.2 1.2.6 UW PSL Procure Replacements and Spares MDS: Procure Replacements Internal Hoses and Spares CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $4,150.63 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 11365 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 11,365 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 11,859 $ - 0 $ - 0 $ 11,859 $ 4,151 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $11,858.95
396 1.2.7.1.7 1.2 1.2.7 UW PSL IFD Follow-up Tasks (PY5) Support Equipment: IFD Follow-up Tasks (PY5) Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $939.78 $0.00 40 40 $ 4,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,699 $ - 0 $ - 0 $ 4,699 $ 940 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,698.90
397 1.2.7.1.7 1.2 1.2.7 UW PSL IFD Follow-up Tasks (PY5) Support Equipment: IFD Follow-up Tasks (PY5) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C3 20.0% $377.55 $0.00 24 24 $ 1,848 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,888 $ - 0 $ - 0 $ 1,888 $ 378 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,887.73
398 1.2.7.1.7 1.2 1.2.7 UW PSL IFD Follow-up Tasks (PY5) Support Equipment: IFD Follow-up Tasks (PY5) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C3 20.0% $408.60 $0.00 2000 0 $ 2,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,043 $ - 0 $ - 0 $ 2,043 $ 409 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,043.00
399 1.2.7.2.1 1.2 1.2.7 UW PSL Identify Spares and Replacements Support Equipment: Identify Spares and Replacements Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $986.77 $0.00 8 8 8 24 $ 920 $ - 0 $ 920 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 987 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
400 1.2.7.2.2 1.2 1.2.7 UW PSL Procure Spares and Replacements Support Equipment: Procure Spares and Replacements Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,662.29 $0.00 8 12 20 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ 1,380 $ - 0 $ - 0 $ 2,349 $ - 0 $ - 0 $ 2,349 $ 822 $ - 0 8 6 6 20 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 690 $ 690 $ - 0 $ - 0 $ - 0 $ 2,400 $ - 0 $ - 0 $ 2,400 $ 840 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,749.41
401 1.2.7.2.2 1.2 1.2.7 UW PSL Procure Spares and Replacements Support Equipment: Procure Spares and Replacements CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $2,890.95 $0.00 4000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,000 $ - 0 $ - 0 $ 4,086 $ - 0 $ - 0 $ 4,086 $ 1,430 $ - 0 1000 1000 2000 0 $ 1,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,000 $ 2,000 $ - 0 $ - 0 $ - 0 $ 4,174 $ - 0 $ - 0 $ 4,174 $ 1,461 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $8,259.85
402 1.2.7.2.4 1.2 1.2.7 UW PSL Procure Hose Stock and Fittings (FY5) Support Equipment: Procure Hose Stock and Fittings Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $986.77 $0.00 8 16 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ 1,840 $ - 0 $ - 0 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 987 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,819.34
403 1.2.7.2.4 1.2 1.2.7 UW PSL Procure Hose Stock and Fittings (FY5) Support Equipment: Procure Hose Stock and Fittings CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,787.63 $0.00 5000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,000 $ - 0 $ - 0 $ - 0 $ 5,108 $ - 0 $ - 0 $ 5,108 $ 1,788 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,107.50
404 1.2.7.2.5 1.2 1.2.7 UW PSL Spare Parts Inventory and Catalog - Electrical/Controls Support Equipment: Spare Parts Inventory and Catalog - Electrical/Controls Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $657.85 $0.00 8 8 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ 920 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 658 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
405 1.2.7.3.1 1.2 1.2.7 UW PSL Identify Upgrade-Replacements, Spares Shops: Identify Upgrade-Replacements, Spares Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $657.85 $0.00 8 8 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ 920 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 658 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
406 1.2.7.3.2 1.2 1.2.7 UW PSL Procure Upgrade-Replacements, Spares Shops: Procure Upgrade-Replacements, Spares Labor Hours Labor - Task EN-ME D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,315.69 $0.00 16 8 8 32 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,840 $ 920 $ 920 $ - 0 $ - 0 $ 3,759 $ - 0 $ - 0 $ 3,759 $ 1,316 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,759.12
407 1.2.7.3.2 1.2 1.2.7 UW PSL Procure Upgrade-Replacements, Spares Shops: Procure Upgrade-Replacements, Spares CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,251.34 $0.00 1500 1000 1000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,500 $ 1,000 $ 1,000 $ - 0 $ - 0 $ 3,575 $ - 0 $ - 0 $ 3,575 $ 1,251 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,575.25
408 1.2.7.4.7 1.2 1.2.7 UW PSL Commission/Maintenance/Decommission (PY5) Testbed: Commission/Maintenance/Decommission (PY5) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C4 35.0% $2,202.35 $0.00 20 20 20 20 80 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,540 $ 1,540 $ 1,540 $ 1,540 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,292 $ - 0 $ - 0 $ 6,292 $ 2,202 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $6,292.44
409 1.2.7.4.7 1.2 1.2.7 UW PSL Commission/Maintenance/Decommission (PY5) Testbed: Commission/Maintenance/Decommission (PY5) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $3,289.23 $0.00 20 20 20 20 80 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,398 $ - 0 $ - 0 $ 9,398 $ 3,289 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,397.80
410 1.2.7.4.7 1.2 1.2.7 UW PSL Commission/Maintenance/Decommission (PY5) Testbed: Commission/Maintenance/Decommission (PY5) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $3,575.25 $0.00 2500 2500 2500 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ 2,500 $ 2,500 $ 2,500 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,215 $ - 0 $ - 0 $ 10,215 $ 3,575 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $10,215.00
411 1.2.7.4.8 1.2 1.2.7 UW PSL Commission/Maintenance/Decommission (PY6) Testbed: Commission/Maintenance/Decommission (PY6) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C4 35.0% $2,249.70 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 20 20 80 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,540 $ 1,540 $ 1,540 $ 1,540 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,428 $ - 0 $ - 0 $ 6,428 $ 2,250 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $6,427.73
412 1.2.7.4.8 1.2 1.2.7 UW PSL Commission/Maintenance/Decommission (PY6) Testbed: Commission/Maintenance/Decommission (PY6) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $3,359.95 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 20 20 80 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,600 $ - 0 $ - 0 $ 9,600 $ 3,360 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,599.85
413 1.2.7.4.8 1.2 1.2.7 UW PSL Commission/Maintenance/Decommission (PY6) Testbed: Commission/Maintenance/Decommission (PY6) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $3,652.12 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2500 2500 2500 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ 2,500 $ 2,500 $ 2,500 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,435 $ - 0 $ - 0 $ 10,435 $ 3,652 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $10,434.62
414 1.2.7.4.9 1.2 1.2.7 UW PSL Commission/Maintenance/Decommission (PY7) Testbed: Commission/Maintenance/Decommission (PY7) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C4 35.0% $2,298.07 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 20 20 80 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,540 $ 1,540 $ 1,540 $ 1,540 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,566 $ - 0 $ - 0 $ 6,566 $ 2,298 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $6,565.92
415 1.2.7.4.9 1.2 1.2.7 UW PSL Commission/Maintenance/Decommission (PY7) Testbed: Commission/Maintenance/Decommission (PY7) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $3,432.19 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 20 20 80 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,806 $ - 0 $ - 0 $ 9,806 $ 3,432 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,806.25
416 1.2.7.4.9 1.2 1.2.7 UW PSL Commission/Maintenance/Decommission (PY7) Testbed: Commission/Maintenance/Decommission (PY7) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $3,730.64 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2500 2500 2500 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ 2,500 $ 2,500 $ 2,500 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,659 $ - 0 $ - 0 $ 10,659 $ 3,731 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $10,658.97
417 1.2.7.4.10 1.2 1.2.7 UW PSL Commission/Maintenance/Decommission (PY8) Testbed: Commission/Maintenance/Decommission (PY8) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C4 35.0% $1,173.74 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 40 $ 1,540 $ 1,540 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,354 $ - 0 $ - 0 $ 3,354 $ 1,174 $ - 0 $3,353.55
418 1.2.7.4.10 1.2 1.2.7 UW PSL Commission/Maintenance/Decommission (PY8) Testbed: Commission/Maintenance/Decommission (PY8) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $1,752.99 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 40 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,009 $ - 0 $ - 0 $ 5,009 $ 1,753 $ - 0 $5,008.54
419 1.2.7.4.10 1.2 1.2.7 UW PSL Commission/Maintenance/Decommission (PY8) Testbed: Commission/Maintenance/Decommission (PY8) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $762.17 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1000 1000 0 $ 1,000 $ 1,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,178 $ - 0 $ - 0 $ 2,178 $ 762 $ - 0 $2,177.63
420 1.2.7.5.5 1.2 1.2.7 UW PSL Procure Tools & Equipment, & Consumables Tools & Equipment: Procure Tools & Consumables Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C4 35.0% $3,024.41 $0.00 8 8 8 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ 920 $ 920 $ - 0 $ 2,819 $ - 0 $ - 0 $ 2,819 $ 987 $ - 0 8 8 8 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ 920 $ 920 $ - 0 $ 2,880 $ - 0 $ - 0 $ 2,880 $ 1,008 $ - 0 8 8 8 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 920 $ 920 $ 920 $ - 0 $ - 0 $ 2,942 $ - 0 $ - 0 $ 2,942 $ 1,030 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $8,641.17
421 1.2.7.5.5 1.2 1.2.7 UW PSL Procure Tools & Equipment, & Consumables Tools & Equipment: Procure Tools & Consumables M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C4 35.0% $8,382.87 $2,903.87 2500 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ 2,500 $ - 0 $ 5,108 $ - 0 $ 2,707 $ 7,814 $ 1,788 $ 947 2500 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ 2,500 $ - 0 $ 5,217 $ - 0 $ 2,765 $ 7,982 $ 1,826 $ 968 2500 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ 2,500 $ - 0 $ - 0 $ 5,329 $ - 0 $ 2,825 $ 8,154 $ 1,865 $ 989 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $23,951.07
422 1.2.8.1.2 1.2 1.2.8 UW PSL FS1 Off-Ice Safety Training & PPE Procurement - 10 FTE Drillers (10-primary 2-alternates) & 1 Safety Officer FS1 - Off-Ice EHWD & Safety Training - 5 Drillers (w/ 2 alternates) (Driller_PSL_DirectHire) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C1 9.0% $1,982.12 $0.00 Contract staff training/travel labor - 3 Direct Hire + 2 alternates - assuming 7 days @ 8 hours per 280 280 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 21,560 $ - 0 $ 22,024 $ - 0 $ - 0 $ 22,024 $ 1,982 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $22,023.54
423 1.2.8.1.2 1.2 1.2.8 UW PSL FS1 Off-Ice Safety Training & PPE Procurement - 10 FTE Drillers (10-primary 2-alternates) & 1 Safety Officer FS1 - Off-Ice EHWD & Safety Training - 10 PSL (Driller Lead/Engineers) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $3,171.76 $0.00 PSL staff training labor - Assuming 30 hours per PSL team member for training x 10 PSL Engineers 300 300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 34,500 $ - 0 $ 35,242 $ - 0 $ - 0 $ 35,242 $ 3,172 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $35,241.75
424 1.2.8.1.2 1.2 1.2.8 UW PSL FS1 Off-Ice Safety Training & PPE Procurement - 10 FTE Drillers (10-primary 2-alternates) & 1 Safety Officer FS1 - Off-Ice EHWD & Safety Training - Safety Training Materials/Vendors M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C1 9.0% $703.30 $243.63 SafeStart, rigging, and Red Cross training - additional training materials added in coordination with USAP contractor 5000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,000 $ - 0 $ 5,108 $ - 0 $ 2,707 $ 7,814 $ 460 $ 244 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,814.48
425 1.2.8.1.2 1.2 1.2.8 UW PSL FS1 Off-Ice Safety Training & PPE Procurement - 10 FTE Drillers (10-primary 2-alternates) & 1 Safety Officer FS1 - Off-Ice EHWD & Safety Training - Safety Equipment/Consumables M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C1 9.0% $309.45 $107.20 Procurement of replacement smoke detector batteries, smoke detectors, toe warmers, hand warmers, oxygen, CO, H2S, monitors, first aid kit, work gloves, knee pads, goggles, and N95 masks 1000 1000 200 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,000 $ 1,000 $ 200 $ - 0 $ - 0 $ 2,247 $ - 0 $ 1,191 $ 3,438 $ 202 $ 107 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,438.37
426 1.2.8.1.2 1.2 1.2.8 UW PSL FS1 Off-Ice Safety Training & PPE Procurement - 10 FTE Drillers (10-primary 2-alternates) & 1 Safety Officer FS1 - Off-Ice EHWD & Safety Training - 5 DH Drillers (w/ 2 alternates) - (Direct Hire Travel -1 Domestic, 2 International, 2 Local) Foreign Travel Travel D - Expert Opinion $1 0.00% 53.00% Off Ice C1 9.0% $900.23 $311.84 Contract staff training Foreign Travel - 3 Direct Hire w/ 2 alternates - 5 Total (estimating 2 local, 1 domestic, 2 intl). Duration 7 days. $8200 total travel cost
2 Local - No travel costs
1 Domestic - $1800
2 International - $6400
6400 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,400 $ - 0 $ 6,538 $ - 0 $ 3,465 $ 10,003 $ 588 $ 312 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $10,002.53
427 1.2.8.1.2 1.2 1.2.8 UW PSL FS1 Off-Ice Safety Training & PPE Procurement - 10 FTE Drillers (10-primary 2-alternates) & 1 Safety Officer FS1 - Off-Ice EHWD & Safety Training - 5 DH Drillers (w/ 2 alternates) - (Direct Hire Travel -1 Domestic, 2 International, 2 Local) Domestic Travel Travel D - Expert Opinion $1 0.00% 53.00% Off Ice C1 9.0% $253.19 $87.71 Contract staff training Domestic Travel - 3 Direct Hire w/ 2 alternates - 5 Total (estimating 2 local, 1 domestic, 2 intl). Duration 7 days. $8200 total travel cost
2 Local - No travel costs
1 Domestic - $1800
2 International - $6400
1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ 1,839 $ - 0 $ 975 $ 2,813 $ 165 $ 88 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,813.21
428 1.2.8.1.3 1.2 1.2.8 UW PSL FS2 Off-Ice Safety Training & PPE Procurement - 16 Drillers (14 - Primary 2 - alternates) & 1 Safety Officer FS2 - Off-Ice EHWD & Safety Training - 8 Drillers (2 alternates) (Driller_PSL_DirectHire) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C1 9.0% $3,239.57 $0.00 Contract staff training/travel labor - 8 Direct Hire (w/ 2 alternates) - assuming 7 days @ 8 hours per (448 hours total) 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 224 224 448 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 17,248 $ 17,248 $ - 0 $ 35,995 $ - 0 $ - 0 $ 35,995 $ 3,240 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $35,995.27
429 1.2.8.1.3 1.2 1.2.8 UW PSL FS2 Off-Ice Safety Training & PPE Procurement - 16 Drillers (14 - Primary 2 - alternates) & 1 Safety Officer FS2 - 10 PSL (Driller_Lead/Engineer) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $3,239.95 $0.00 PSL staff training labor - Assuming 30 hours per PSL team member for training x 10 PSL Engineers 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 150 150 300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 17,250 $ 17,250 $ - 0 $ 35,999 $ - 0 $ - 0 $ 35,999 $ 3,240 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $35,999.45
430 1.2.8.1.3 1.2 1.2.8 UW PSL FS2 Off-Ice Safety Training & PPE Procurement - 16 Drillers (14 - Primary 2 - alternates) & 1 Safety Officer FS2 - Off-Ice EHWD & Safety Training - Safety Training Materials/Vendors M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C1 9.0% $359.21 $124.43 Red Cross and job specific training TBD - additional training materials added in coordination with USAP contractor 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,609 $ - 0 $ 1,383 $ 3,991 $ 235 $ 124 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,991.24
431 1.2.8.1.3 1.2 1.2.8 UW PSL FS2 Off-Ice Safety Training & PPE Procurement - 16 Drillers (14 - Primary 2 - alternates) & 1 Safety Officer FS2 - Off-Ice EHWD & Safety Training - Safety Equipment/Consumables M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C1 9.0% $359.21 $124.43 Procurement of replacement smoke detector batteries, smoke detectors, toe warmers, hand warmers, absorbent pads, N95 masks, smoke and CO monitors 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1000 1000 500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,000 $ 1,000 $ 500 $ - 0 $ - 0 $ 2,609 $ - 0 $ 1,383 $ 3,991 $ 235 $ 124 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,991.24
432 1.2.8.1.3 1.2 1.2.8 UW PSL FS2 Off-Ice Safety Training & PPE Procurement - 16 Drillers (14 - Primary 2 - alternates) & 1 Safety Officer FS2 - Off-Ice EHWD & Safety Training - 8 DH Drillers w/ 2 alternates - (Direct Hire Travel -1 Domestic 2 International) Foreign Travel Travel D - Expert Opinion $1 0.00% 53.00% Off Ice C1 9.0% $1,379.37 $477.82 Contract staff training International Travel - 8 Direct Hire w/ 2 alternates Duration 7 days.
2 Local - No travel costs
3 Domestic - $5400
3 International - $9600
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 4800 4800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,800 $ 4,800 $ - 0 $ 10,017 $ - 0 $ 5,309 $ 15,326 $ 902 $ 478 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $15,326.37
433 1.2.8.1.3 1.2 1.2.8 UW PSL FS2 Off-Ice Safety Training & PPE Procurement - 16 Drillers (14 - Primary 2 - alternates) & 1 Safety Officer FS2 - Off-Ice EHWD & Safety Training - 6 DH Drillers w/ 2 alternates - (Direct Hire Travel -1 Domestic 2 International) Domestic Travel Travel D - Expert Opinion $1 0.00% 53.00% Off Ice C1 9.0% $775.90 $268.78 Contract staff training Domestic Travel - 8 Direct Hire w/ 2 alternates Duration 7 days.
2 Local - No travel costs
3 Domestic - $5400
3 International - $9600
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2700 2700 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,700 $ 2,700 $ - 0 $ 5,635 $ - 0 $ 2,986 $ 8,621 $ 507 $ 269 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $8,621.09
434 1.2.8.1.4 1.2 1.2.8 UW PSL FS3 Off-Ice Safety Training & PPE Procurement - 32 Drillers (28 - primary 4 - alternates) & 1 Safety Officer FS3 - Off-Ice EHWD & Safety Training - 22 Drillers (w/ 4 alternates) (Driller_PSL_DirectHire) Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C1 9.0% $19,855.35 $0.00 Contract staff training/travel labor - 24 Direct Hire - 20 deploy w/ 4 alternates. Duration 14 - 8 hour days with travel. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1344 1344 2688 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 103,488 $ 103,488 $ - 0 $ 220,615 $ - 0 $ - 0 $ 220,615 $ 19,855 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $220,615.03
435 1.2.8.1.4 1.2 1.2.8 UW PSL FS3 Off-Ice Safety Training & PPE Procurement - 32 Drillers (28 - primary 4 - alternates) & 1 Safety Officer FS3 - Off-Ice EHWD & Safety Training - 10 PSL Staff - 2 Rotators (Engineer/Driller PSL_Lead) Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $6,619.22 $0.00 PSL staff training labor - Assuming 60 hours per PSL team member for training x 10 PSL Engineers 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 300 300 600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 34,500 $ 34,500 $ - 0 $ 73,547 $ - 0 $ - 0 $ 73,547 $ 6,619 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $73,546.87
436 1.2.8.1.4 1.2 1.2.8 UW PSL FS3 Off-Ice Safety Training & PPE Procurement - 32 Drillers (28 - primary 4 - alternates) & 1 Safety Officer FS3 - Off-Ice EHWD & Safety Training - Safety Training Materials/Vendors M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C1 9.0% $733.87 $254.22 SafeStart, rigging, job specific training (TBD) and Red Cross training - additional training materials added in coordination with USAP contractor 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2000 3000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,000 $ 3,000 $ - 0 $ - 0 $ - 0 $ 5,329 $ - 0 $ 2,825 $ 8,154 $ 480 $ 254 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $8,154.11
437 1.2.8.1.4 1.2 1.2.8 UW PSL FS3 Off-Ice Safety Training & PPE Procurement - 32 Drillers (28 - primary 4 - alternates) & 1 Safety Officer FS3 - Off-Ice EHWD & Safety Training - Safety Equipment/Consumables M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C1 9.0% $660.48 $228.79 Procurement of replacement smoke detector batteries, smoke detectors, toe warmers, hand warmers, absorbent pads, N95 masks, smoke and CO monitors 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2000 2000 500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,000 $ 2,000 $ 500 $ - 0 $ - 0 $ 4,797 $ - 0 $ 2,542 $ 7,339 $ 432 $ 229 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,338.70
438 1.2.8.1.4 1.2 1.2.8 UW PSL FS3 Off-Ice Safety Training & PPE Procurement - 32 Drillers (28 - primary 4 - alternates) & 1 Safety Officer FS3 - Off-Ice EHWD & Safety Training - 24 Drillers (Direct Hire Travel) Foreign Travel Travel D - Expert Opinion $1 0.00% 53.00% Off Ice C1 9.0% $2,818.06 $976.19 Contract staff - Training Foreign Travel - 24 Direct Hire - 20 deploy w/ 4 alternates Duration 14 days with travel.
6 Local - No travel costs
12 Domestic - $21600
6 International - $19200
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 9600 9600 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,600 $ 9,600 $ - 0 $ 20,465 $ - 0 $ 10,847 $ 31,312 $ 1,842 $ 976 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $31,311.78
439 1.2.8.1.4 1.2 1.2.8 UW PSL FS3 Off-Ice Safety Training & PPE Procurement - 32 Drillers (28 - primary 4 - alternates) & 1 Safety Officer FS3 - Off-Ice EHWD & Safety Training - 24 Drillers (Direct Hire Travel) Domestic Travel Travel D - Expert Opinion $1 0.00% 53.00% Off Ice C1 9.0% $3,170.32 $1,098.21 Contract staff -Training Domestic Travel - 24 Direct Hire - 20 deploy w/ 4 alternates Duration 14 days with travel.
6 Local - No travel costs
12 Domestic - $21600
6 International - $19200
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 10800 10800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,800 $ 10,800 $ - 0 $ 23,023 $ - 0 $ 12,202 $ 35,226 $ 2,072 $ 1,098 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $35,225.75
440 1.2.8.1.5 1.2 1.2.8 UW PSL FS3 Off-Ice Logging Winch Training with IDP (3 Drillers 1 day) FS3 - Off-Ice Logging Winch Training - 3 Drillers 1 day Labor Hours Labor - Task EN D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C1 9.0% $264.77 $0.00 Logging Winch Training - 3 Drillers 1 day training with IDP support (IDP cost in Calibration WBS) 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ 2,942 $ - 0 $ - 0 $ 2,942 $ 265 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,941.87
441 1.2.8.5.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS1) Deployment Travel & PQ Costs (FS1) (Driller_PSL_Manager) Labor Hours Labor - Task EN E - Extrapolation from Actuals $115 $115 0.00% 0.00% Off Ice C1 9.0% $1,397.24 $0.00 1 Drill Manager, 5 days deployment travel 3 days redeployment 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 24 64 $ - 0 $ 4,600 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,680 $ - 0 $ - 0 $ 7,680 $ 691 $ - 0 40 24 64 $ - 0 $ 4,600 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,845 $ - 0 $ - 0 $ 7,845 $ 706 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $15,524.88
442 1.2.8.5.2 1.2 1.2.8 UW WIPAC PQ, ECW & Deployment Travel Costs (FS1) Deployment Travel & PQ Costs (FS1) (Safety Engineer) Zernick Labor Hours Labor - Task EN-S E - Extrapolation from Actuals $61 $46 35.00% 53.00% Off Ice C1 9.0% $753.43 $260.99 1 Safety Engineer, 5 days deployment travel 3 days redeployment 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 24 64 $ - 0 $ 2,428 $ - 0 $ - 0 $ 1,457 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,053 $ 1,419 $ 2,900 $ 8,371 $ 492 $ 261 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $8,371.42
443 1.2.8.5.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS1) Deployment Travel & PQ Costs (FS1) (Driller_PSL_DirectHire) x 3 Labor Hours Labor - Task TE E - Extrapolation from Actuals $77 $77 0.00% 0.00% Off Ice C1 9.0% $1,388.39 $0.00 3 Seasonal drillers, 5 days deployment travel 3 days redeployment
(No Contributed drillers)
0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 120 72 192 $ - 0 $ 9,240 $ - 0 $ - 0 $ 5,544 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 15,427 $ - 0 $ - 0 $ 15,427 $ 1,388 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $15,426.55
444 1.2.8.5.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS1) Deployment Travel & PQ Costs (FS1) (PSL_Engineer) x 9 Labor Hours Labor - Task EN E - Extrapolation from Actuals $115 $115 0.00% 0.00% Off Ice C1 9.0% $6,220.70 $0.00 9 PSL Engineers (2 Rotators), 5 days deployment travel 3 days redeployment 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 280 128 168 576 $ - 0 $ 32,200 $ 14,720 $ - 0 $ 19,320 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 69,119 $ - 0 $ - 0 $ 69,119 $ 6,221 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $69,118.94
445 1.2.8.5.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS1) Deployment Travel & PQ Costs (FS1) (Drill Team) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $2,138.04 $740.63 16 - PQ's 1 Drill Lead, 1 Safety Engineer, 5 Direct Hire (2 alternate) & 9 PSL Engineers @ $950/each (anticipated cost) 7600 7600 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,600 $ - 0 $ 7,600 $ - 0 $ 15,527 $ - 0 $ 8,229 $ 23,756 $ 1,397 $ 741 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $23,756.00
446 1.2.8.5.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS1) Deployment Travel & PQ Costs (FS1) (Drill Team) Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $3,544.65 $1,227.88 14 - Deployment Travel @ $1800 each 12600 12600 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 12,600 $ 12,600 $ - 0 $ 25,742 $ - 0 $ 13,643 $ 39,385 $ 2,317 $ 1,228 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $39,384.95
447 1.2.8.5.11 1.2 1.2.8 UW PSL On-Ice Labor (FS1) On-Ice Labor (FS1) (PSL Engineers) Labor Hours Labor - Task EN D - Expert Opinion $85 $115 0.00% 0.00% On Ice C2 12.5% $50,999.22 $0.00 EE/ME Engineer Labor Totals from Population file. Assumes 2 days in McMurdo southbound and 0 days northbound. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1044 1818 1728 4590 $ - 0 $ 88,933 $ 154,867 $ 147,200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 407,994 $ - 0 $ - 0 $ 407,994 $ 50,999 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $407,993.74
448 1.2.8.5.11 1.2 1.2.8 UW PSL On-Ice Labor (FS1) On-Ice Labor (FS1) (PSL Contract Drillers) Labor Hours Labor - Task TE D - Expert Opinion $57 $77 0.00% 0.00% On Ice C2 12.5% $10,980.70 $0.00 Technician Labor Totals from Population file. Assumes 2 days in McMurdo southbound and 0 days northbound. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 279 549 648 1476 $ - 0 $ 15,913 $ 31,313 $ 36,960 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 87,846 $ - 0 $ - 0 $ 87,846 $ 10,981 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $87,845.61
449 1.2.8.5.11 1.2 1.2.8 UW WIPAC On-Ice Labor (FS1) On-Ice Labor (FS1) (Safety Engineer) Zernick Labor Hours Labor - Task EN-S D - Expert Opinion $45 $46 35.00% 53.00% On Ice C1 9.0% $2,590.16 $897.25 Safety Engineer Labor Totals from Population file. Assumes 2 days in McMurdo southbound and 0 days northbound. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 162 135 297 $ - 0 $ 7,284 $ 6,070 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,933 $ 4,877 $ 9,969 $ 28,780 $ 1,693 $ 897 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $28,779.60
450 1.2.8.6.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS2) Team Deployment Travel & PQ Costs (FS2) (Driller_PSL_Manager) Labor Hours Labor - Task EN E - Extrapolation from Actuals $115 $115 0.00% 0.00% Off Ice C1 9.0% $706.05 $0.00 1 Drill Manager, 5 days deployment travel 3 days redeployment 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 24 64 $ - 0 $ 4,600 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,845 $ - 0 $ - 0 $ 7,845 $ 706 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,845.00
451 1.2.8.6.2 1.2 1.2.8 UW WIPAC PQ, ECW & Deployment Travel Costs (FS2) Team Deployment Travel & PQ Costs (FS2) (Safety_Engineer) Zernick Labor Hours Labor - Task EN-S E - Extrapolation from Actuals $61 $46 35.00% 53.00% Off Ice C1 9.0% $769.63 $266.60 1 Safety Engineer, 5 days deployment travel 3 days redeployment 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 24 64 $ - 0 $ 2,428 $ - 0 $ - 0 $ 1,457 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,140 $ 1,449 $ 2,962 $ 8,551 $ 503 $ 267 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $8,551.40
452 1.2.8.6.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS2) Team Deployment Travel & PQ Costs (FS2) (PSL_Direct_Hire) Labor Hours Labor - Task TE E - Extrapolation from Actuals $77 $77 0.00% 0.00% Off Ice C1 9.0% $2,836.48 $0.00 6 PSL Direct Hire, 5 days deployment travel 3 days redeployment 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 240 144 384 $ - 0 $ 18,480 $ - 0 $ - 0 $ 11,088 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 31,516 $ - 0 $ - 0 $ 31,516 $ 2,836 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $31,516.43
453 1.2.8.6.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS2) Team Deployment Travel & PQ Costs (FS2) (PSL_Engineer) Labor Hours Labor - Task EN E - Extrapolation from Actuals $115 $115 0.00% 0.00% Off Ice C1 9.0% $6,354.45 $0.00 9 PSL Engineers w/ 2 Rotators, 5 days deployment travel 3 days redeployment 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 280 128 168 576 $ - 0 $ 32,200 $ 14,720 $ - 0 $ 19,320 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 70,605 $ - 0 $ - 0 $ 70,605 $ 6,354 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $70,605.00
454 1.2.8.6.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS2) Team Deployment Travel & PQ Costs (FS2) (Drill Team) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $2,593.51 $898.41 19 - PQ's @ $950/each (anticipated cost) - 2 Alternates and 17 Primaries 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 9025 9025 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,025 $ 9,025 $ - 0 $ 18,834 $ - 0 $ 9,982 $ 28,817 $ 1,695 $ 898 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $28,816.78
455 1.2.8.6.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS2) Team Deployment Travel & PQ Costs (FS2) (Drill Team) Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $4,396.75 $1,523.06 17 - Deploy travel costs w/ 2 PSL rotator @ $1800 each 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 15300 15300 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 15,300 $ 15,300 $ 31,930 $ - 0 $ 16,923 $ 48,853 $ 2,874 $ 1,523 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $48,852.82
456 1.2.8.6.6.9 1.2 1.2.8 UW PSL Parallel Gens through PDM Bays (Driller & Contract Gen Tech) Generators/PDM: Parallel Gens through PDM Bays (Contract Gen Tech) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% On Ice C3 20.0% $2,963.19 $0.00 Estimated 18 days of contractor cost @ $250 per hour 9 hour days plus travel & PQ allowance of $1200 for a total of $41,700 or $5957 for each of the 7 days of work at the Pole. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $13,900.00 0 $ - 0 $ 13,900 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,816 $ - 0 $ - 0 $ 14,816 $ 2,963 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,815.96
457 1.2.8.6.6.10 1.2 1.2.8 UW PSL Load Test using Resistance Heaters (Driller & Contract Gen Tech) Generators/PDM: Load Test using Resistance Heaters (Contract Gen Tech) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% On Ice C3 20.0% $2,963.19 $0.00 Estimated 18 days of contractor cost @ $250 per hour 9 hour days plus travel & PQ allowance of $1200 for a total of $41,700 or $5957 for each of the 7 days of work at the Pole. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $13,900.00 0 $ - 0 $ 13,900 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,816 $ - 0 $ - 0 $ 14,816 $ 2,963 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,815.96
458 1.2.8.6.6.11 1.2 1.2.8 UW PSL Test Safety Shut-downs (Driller & Contract Gen Tech) Generators/PDM: Test Safety Shut-downs (Contract Gen Tech) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% On Ice C3 20.0% $2,963.19 $0.00 Estimated 18 days of contractor cost @ $250 per hour 9 hour days plus travel & PQ allowance of $1200 for a total of $41,700 or $5957 for each of the 7 days of work at the Pole. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $13,900.00 0 $ - 0 $ - 0 $ 13,900 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,816 $ - 0 $ - 0 $ 14,816 $ 2,963 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,815.96
459 1.2.8.6.15 1.2 1.2.8 UW PSL On-ice Labor FS2 On-Ice Labor (FS2) (PSL Engineers) Labor Hours Labor - Task EN D - Expert Opinion $85 $115 0.00% 0.00% On Ice C2 12.5% $50,563.47 $0.00 EE/ME Engineer Labor Totals from Population file. Assumes 2 days in McMurdo southbound and 1 day northbound. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 990 1818 1647 4455 $ - 0 $ 84,333 $ 154,867 $ 140,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 404,508 $ - 0 $ - 0 $ 404,508 $ 50,563 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $404,507.79
460 1.2.8.6.15 1.2 1.2.8 UW PSL On-ice Labor FS2 On-Ice Labor (FS2) (PSL Drillers) Labor Hours Labor - Task TE D - Expert Opinion $57 $77 0.00% 0.00% On Ice C2 12.5% $25,648.14 $0.00 Technician Labor Totals from Population file. Assumes 2 days in McMurdo southbound and 1 day northbound. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 819 1197 1359 3375 $ - 0 $ 46,713 $ 68,273 $ 77,513 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 205,185 $ - 0 $ - 0 $ 205,185 $ 25,648 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $205,185.11
461 1.2.8.6.15 1.2 1.2.8 UW WIPAC On-ice Labor FS2 On-Ice Labor (FS2) (Safety Engineer) Zernick Labor Hours Labor - Task EN-S D - Expert Opinion $45 $46 35.00% 53.00% On Ice C2 12.5% $4,714.13 $1,633.00 Safety Engineer Labor Totals from Population file. Assumes 2 days in McMurdo southbound and 1 day northbound. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 48 225 108 381 $ - 0 $ 2,158 $ 10,116 $ 4,856 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 18,259 $ 6,390 $ 13,064 $ 37,713 $ 3,081 $ 1,633 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $37,713.04
462 1.2.8.7.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS3) Deployment Travel & PQ Costs (FS3) (Driller_Manager) Labor Hours Labor - Task EN E - Extrapolation from Actuals $115 $115 0.00% 0.00% Off Ice C1 9.0% $721.23 $0.00 1 (Drill Manager), 5 days deployment travel 3 days redeployment 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 24 64 $ - 0 $ 4,600 $ - 0 $ - 0 $ 2,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 8,014 $ - 0 $ - 0 $ 8,014 $ 721 $ - 0 $8,013.67
463 1.2.8.7.2 1.2 1.2.8 UW WIPAC PQ, ECW & Deployment Travel Costs (FS3) Deployment Travel & PQ Costs (FS3) (Safety_Engineer) Zernick Labor Hours Labor - Task EN-S E - Extrapolation from Actuals $61 $46 35.00% 53.00% Off Ice C1 9.0% $786.17 $272.33 1 (Safety Engineer), 5 days deployment travel 3 days redeployment 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 24 64 $ - 0 $ 2,428 $ - 0 $ 1,457 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,229 $ 1,480 $ 3,026 $ 8,735 $ 514 $ 272 $8,735.26
464 1.2.8.7.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS3) Deployment Travel & PQ Costs (FS3) (Driller_PSL_Direct_Hire) Labor Hours Labor - Task EN E - Extrapolation from Actuals $115 $115 0.00% 0.00% Off Ice C1 9.0% $14,424.60 $0.00 20 (PSL Direct Hire), 5 days deployment travel 3 days redeployment 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 800 480 1280 $ - 0 $ 92,000 $ - 0 $ 55,200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 160,273 $ - 0 $ - 0 $ 160,273 $ 14,425 $ - 0 $160,273.34
465 1.2.8.7.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS3) Deployment Travel & PQ Costs (FS3) (Engineer_PSL) Labor Hours Labor - Task EN E - Extrapolation from Actuals $115 $115 0.00% 0.00% Off Ice C1 9.0% $5,769.84 $0.00 8 (PSL Engineers), 5 days deployment travel 3 days redeployment 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 320 192 512 $ - 0 $ 36,800 $ - 0 $ 22,080 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 64,109 $ - 0 $ - 0 $ 64,109 $ 5,770 $ - 0 $64,109.34
466 1.2.8.7.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS3) PQ Costs (FS3) (Drill Team) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $4,601.36 $1,593.94 33 - PQ's @ $950/each (anticipated cost) 28 Drillers, Safety Engineer & 4 Alternates 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 15675 15675 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 15,675 $ 15,675 $ - 0 $ - 0 $ 33,416 $ - 0 $ 17,710 $ 51,126 $ 3,007 $ 1,594 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $51,126.27
467 1.2.8.7.2 1.2 1.2.8 UW PSL PQ, ECW & Deployment Travel Costs (FS3) Travel (FS3) (Drill Team) Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $7,661.60 $2,654.02 29 - Deploy travel costs 29 (28 Drillers & 1 Safety Engineer) @ $1800 each 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 26100 26100 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 26,100 $ 26,100 $ 55,640 $ - 0 $ 29,489 $ 85,129 $ 5,008 $ 2,654 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $85,128.90
468 1.2.8.7.13 1.2 1.2.8 UW PSL On-Ice Labor (FS3) On-Ice Labor (FS3) (PSL Engineers) Labor Hours Labor - Task EN D - Expert Opinion $85 $115 0.00% 0.00% On Ice C2 12.5% $46,850.74 $0.00 EE/ME Engineer Labor Totals from Population file. Assumes 2 days in McMurdo southbound and 1 day northbound. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 702 1872 1467 4041 $ - 0 $ 59,800 $ 159,467 $ 124,967 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 374,806 $ - 0 $ - 0 $ 374,806 $ 46,851 $ - 0 $374,805.89
469 1.2.8.7.13 1.2 1.2.8 UW PSL On-Ice Labor (FS3) On-Ice Labor (FS3) (PSL Contract Drillers) Labor Hours Labor - Task TE D - Expert Opinion $57 $77 0.00% 0.00% On Ice C2 12.5% $80,694.69 $0.00 Technician Labor Totals from Population file. Assumes 2 days in McMurdo southbound and 1 day northbound. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1890 4680 3825 10395 $ - 0 $ 107,800 $ 266,933 $ 218,167 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 645,558 $ - 0 $ - 0 $ 645,558 $ 80,695 $ - 0 $645,557.50
470 1.2.8.7.13 1.2 1.2.8 UW WIPAC On-Ice Labor (FS3) On-Ice Labor (FS3) (Safety Engineer) Zernick Labor Hours Labor - Task EN-S D - Expert Opinion $45 $46 35.00% 53.00% On Ice C2 12.5% $7,735.11 $2,679.48 Safety Engineer Labor Totals from Population file. Assumes 2 days in McMurdo southbound and 1 day northbound. 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 144 234 234 612 $ - 0 $ 6,474 $ 10,521 $ 10,521 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 29,959 $ 10,486 $ 21,436 $ 61,881 $ 5,056 $ 2,679 $61,880.87
471 1.2.9.1.3.2 1.2 1.2.9 UW WIPAC Procure Sensor Handling Equipment Off-Ice Install: Procure Sensor Handling Equipment CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C3 20.0% $1,726.95 $0.00 8453 0 $ 8,453 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 8,635 $ - 0 $ - 0 $ 8,635 $ 1,727 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $8,634.74
472 1.2.9.1.3.3 1.2 1.2.9 UW WIPAC Procure ESD Mitigation Equipment Off-Ice Install: Procure ESD Sensor Handling Equipment CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,983.91 $0.00 Lab coats, ESDgloves, ESD runners 5549 0 $ 5,549 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,668 $ - 0 $ - 0 $ 5,668 $ 1,984 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,668.30
473 1.2.9.2.8 1.2 1.2.9 UW WIPAC Procure Installation Hardware Off-Ice Install: Procure Installation Hardware CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C3 20.0% $22,064.40 $0.00 36000 36000 36000 0 $ - 0 $ 36,000 $ 36,000 $ 36,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 110,322 $ - 0 $ - 0 $ 110,322 $ 22,064 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $110,322.00
474 1.2.9.2.9 1.2 1.2.9 UW WIPAC Procure Installation Weights Off-Ice Install: Procure Installation Weights CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $3,539.50 $0.00 3300 3300 3300 0 $ - 0 $ 3,300 $ 3,300 $ 3,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,113 $ - 0 $ - 0 $ 10,113 $ 3,539 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $10,112.85
475 1.2.9.3.2.1 1.2 1.2.9 UW WIPAC IME ICL Quad Connectivity Tester Design, Prototype, Production (2023-24) Off-ice Install: IME ICL Quad Connectivity Tester Design, Prototype & Production (2023-24) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,753.02 $0.00 IME ICL QCT 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 600 600 600 2000 1000 0 $ - 0 $ - 0 $ 600 $ 600 $ 600 $ - 0 $ 2,000 $ 1,000 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,009 $ - 0 $ - 0 $ 5,009 $ 1,753 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,008.62
476 1.2.9.3.2.1 1.2 1.2.9 UW WIPAC IME ICL Quad Connectivity Tester Design, Prototype, Production (2023-24) Off-ice Install: IME ICL Quad Connectivity Tester Design, Prototype & Production (2023-24) Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $258.63 $89.59 IME ICL QCT 1 domestic travel to NTS at MSU 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 900 900 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 900 $ 900 $ - 0 $ - 0 $ - 0 $ 1,878 $ - 0 $ 995 $ 2,874 $ 169 $ 90 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,873.70
477 1.2.9.3.3.2 1.2 1.2.9 UW PSL IME Depth Readout Development and System Integration (2022-23) Off-ice Install: IME Depth Readout Development and System Integration (2022-23) Wisniewski Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $1,409.67 $0.00 Duplicate system (1/TOS plus spares) 10 20 20 10 60 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,150 $ 2,300 $ 2,300 $ 1,150 $ - 0 $ 7,048 $ - 0 $ - 0 $ 7,048 $ 1,410 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,048.35
478 1.2.9.3.3.2 1.2 1.2.9 UW PSL IME Depth Readout Development and System Integration (2022-23) Off-ice Install: IME Depth Readout Development and System Integration (2022-23) Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $253.19 $87.71 1 domestic trip ($1800/person) to MSU for testing with full length quad 450 450 450 450 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 450 $ 450 $ 450 $ 450 $ - 0 $ 1,839 $ - 0 $ 975 $ 2,813 $ 165 $ 88 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,813.21
479 1.2.9.3.3.2 1.2 1.2.9 UW WIPAC IME Depth Readout Development and System Integration (2022-23) Off-ice Install: IME Depth Readout Development and System Integration (2022-23) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $1,215.59 $0.00 Purchasing 2x materials for spares 1700 1700 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,700 $ - 0 $ 1,700 $ - 0 $ - 0 $ 3,473 $ - 0 $ - 0 $ 3,473 $ 1,216 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,473.10
480 1.2.9.3.3.3 1.2 1.2.9 UW PSL IME Depth Readout System Final Integration (2023-24) Off-Ice Install: IME Depth Readout System Final Integration (2023-24) Wisniewski Labor Hours Labor - Task EN-EE D - Expert Opinion $115 $115 0.00% 0.00% Off Ice C3 20.0% $959.99 $0.00 Test of all Paro Sensors 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 20 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,300 $ 2,300 $ - 0 $ - 0 $ - 0 $ 4,800 $ - 0 $ - 0 $ 4,800 $ 960 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,799.93
481 1.2.9.3.3.7 1.2 1.2.9 UW WIPAC Procure Pressure Sensors Off-Ice Install: Procure Pressure Sensors CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $13,668.83 $0.00 May delay pressure sensor procurement if calibration shelf life duration in question. Vendor quote for 2022 is 11800/each, with increment of 3-5% / year 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 34932 34932 34932 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 34,932 $ 34,932 $ 34,932 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 109,351 $ - 0 $ - 0 $ 109,351 $ 13,669 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $109,350.67
482 1.2.9.4.2.3 1.2 1.2.9 UW WIPAC Procure Logbook Tablets Off-Ice Install: Procure Tablets for Logbook CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $2,179.22 $0.00 two rugged tablets for logbook keeping 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1989 1989 1989 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,989 $ 1,989 $ 1,989 $ - 0 $ - 0 $ - 0 $ 6,226 $ - 0 $ - 0 $ 6,226 $ 2,179 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $6,226.34
483 1.2.9.4.2.5 1.2 1.2.9 UW WIPAC Procure Laser Rangers, Tape Measures, Shop Lights, Helmets for Installation Off-Ice Install: Procure Laser Rangers & various Installation Supplies CapEx CapEx E - Extrapolation from Actuals $1 0.00% 0.00% Off Ice C3 20.0% $1,117.55 $0.00 Laser ranges to measure well depth and distance between DOMs (2) 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1339 1339 1339 669 669 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,339 $ 1,339 $ 1,339 $ 669 $ 669 $ - 0 $ - 0 $ - 0 $ 5,588 $ - 0 $ - 0 $ 5,588 $ 1,118 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,587.74
484 1.2.10.1.3 1.2 1.2.10 UW PSL FS3 Off-Ice Installation Training (Drillers, Installers, Management, including alternates) Install FS3: FS3 Off-Ice Installation Training: Drillers PSL Driller Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C1 9.0% $2,127.36 $0.00 3x8 hours installation training (sensor handling, practice at the tower). Need (3+1 spare)x3=12 drillers 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 288 288 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 22,176 $ - 0 $ 23,637 $ - 0 $ - 0 $ 23,637 $ 2,127 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $23,637.32
485 1.2.10.4.2 1.2 1.2.10 UW WIPAC PQ, ECW, Deployment Travel Costs Installation Team FS2 (Headcount 1) Install FS2: Install Team FS2 PQ Costs (Headcount 1) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% On Ice C1 9.0% $100.58 $34.84 1 - PQ @ $700/each (anticipated cost) 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 350 350 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 350 $ 350 $ - 0 $ - 0 $ 730 $ - 0 $ 387 $ 1,118 $ 66 $ 35 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,117.55
486 1.2.10.4.2 1.2 1.2.10 UW WIPAC PQ, ECW, Deployment Travel Costs Installation Team FS2 (Headcount 1) Install FS2: Install Team FS2 ECW Costs (Headcount 1) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% On Ice C1 9.0% $35.92 $12.44 1 - ECW allowance @ $250/each 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 125 125 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 125 $ 125 $ 261 $ - 0 $ 138 $ 399 $ 23 $ 12 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $399.12
487 1.2.10.4.2 1.2 1.2.10 UW WIPAC PQ, ECW, Deployment Travel Costs Installation Team FS2 (Headcount 1) Install FS2: Install Team FS2 Deployment Travel Costs (Headcount 1) Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% On Ice C1 9.0% $264.19 $91.52 1 - International Travel (3 nights southbound, 2 nights northbound, plus per diem) @ $1800/each 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1080 720 0 $ - 0 $ 1,080 $ - 0 $ - 0 $ 720 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,919 $ - 0 $ 1,017 $ 2,935 $ 173 $ 92 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,935.48
488 1.2.10.4.10 1.2 1.2.10 UW WIPAC Installation: On-Ice Labor (FS2) Installation: On-Ice Labor (FS2) (Installation Lead) Tosi Labor Hours Labor - LoE SC D - Expert Opinion $35 $52 35.00% 53.00% On Ice C1 9.0% $2,745.50 $951.06 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 162 234 396 $ - 0 $ - 0 $ 5,668 $ 8,188 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,769 $ 5,169 $ 10,567 $ 30,506 $ 1,794 $ 951 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $30,505.59
489 1.2.10.5.2 1.2 1.2.10 UW WIPAC PQ, ECW, Deployment Travel Costs Install FS2 Installation Team Install FS3: Install Team FS3 PQ Costs (Headcount 1) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% On Ice C1 9.0% $102.74 $35.59 1 - PQ @ $700/each (anticipated cost) 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 350 350 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 350 $ 350 $ - 0 $ - 0 $ 746 $ - 0 $ 395 $ 1,142 $ 67 $ 36 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,141.58
490 1.2.10.5.2 1.2 1.2.10 UW WIPAC PQ, ECW, Deployment Travel Costs Install FS2 Installation Team Install FS3: Install Team FS3 ECW Costs (Headcount 1) M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% On Ice C1 9.0% $36.69 $12.71 1 - ECW allowance @ $250/each 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 125 125 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 125 $ 125 $ 266 $ - 0 $ 141 $ 408 $ 24 $ 13 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $407.71
491 1.2.10.5.2 1.2 1.2.10 UW WIPAC PQ, ECW, Deployment Travel Costs Install FS2 Installation Team Install FS3: Install Team FS3 Deployment Costs (Headcount 1 + 9 in-kind) Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% On Ice C1 9.0% $269.87 $93.49 1 - International Travel (3 nights southbound, 2 nights northbound, plus per diem) @ $1800/each 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1080 720 0 $ - 0 $ 1,080 $ - 0 $ - 0 $ 720 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,960 $ - 0 $ 1,039 $ 2,999 $ 176 $ 93 $2,998.59
492 1.2.10.5.8 1.2 1.2.10 UW WIPAC Installation: On-Ice Labor (FS3) Installation: On-Ice Labor (FS3) (Installation Lead) Tosi Labor Hours Labor - Task SC D - Expert Opinion $35 $52 35.00% 53.00% On Ice C1 9.0% $3,951.84 $1,368.94 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 108 234 216 558 $ - 0 $ 3,779 $ 8,188 $ 7,558 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 21,258 $ 7,440 $ 15,210 $ 43,909 $ 2,583 $ 1,369 $43,909.33
493 1.3.3.1.2.5 1.3 1.3.3 UW WIPAC PDOM Rev3 Mainboard production (Qty. 27) Domestic trip to PCA manufacturer Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $253.19 $87.71 1800 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,839 $ - 0 $ 975 $ 2,813 $ 165 $ 88 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,813.21
494 1.3.3.1.2.5 1.3 1.3.3 UW WIPAC PDOM Rev3 Mainboard production (Qty. 27) 27 Rev3 PDOM Mainboards CapEx CapEx E - Extrapolation from Actuals $1 0.00% 0.00% Off Ice C2 12.5% $5,464.39 $0.00 42795 0 $ 42,795 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 43,715 $ - 0 $ - 0 $ 43,715 $ 5,464 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $43,715.09
495 1.3.3.1.2.5 1.3 1.3.3 UW WIPAC PDOM Rev3 Mainboard production (Qty. 27) 27 PDOM Calibration Boards CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $3,585.47 $0.00 17550 0 $ 17,550 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 17,927 $ - 0 $ - 0 $ 17,927 $ 3,585 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $17,927.33
496 1.3.3.2.2.5 1.3 1.3.3 UW WIPAC PDOM HV system production (Qty. 27) 27 PDOM HV subsystems (HV supply PCA) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $1,930.64 $0.00 9450 0 $ 9,450 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,653 $ - 0 $ - 0 $ 9,653 $ 1,931 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,653.18
497 1.3.3.4.1 1.3 1.3.3 UW WIPAC Refurbish 10 IceCube DOMs 35 Penetrator Cable Assemblies and attachment hardware CapEx CapEx E - Extrapolation from Actuals $1 0.00% 0.00% Off Ice C1 9.0% $1,962.81 $0.00 21350 0 $ - 0 $ - 0 $ 21,350 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 21,809 $ - 0 $ - 0 $ 21,809 $ 1,963 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $21,809.03
498 1.3.3.4.5.1 1.3 1.3.3 UW PSL Refurbishment Batch #1 (Qty. 20) Refurbishment Batch #1 (Qty. 20) N.N. Labor Hours Labor - Task TE A - Analogy $89 $77 0.00% 0.00% Off Ice C3 20.0% $4,363.85 $0.00 120 120 240 $ 10,680 $ 10,680 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 21,819 $ - 0 $ - 0 $ 21,819 $ 4,364 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $21,819.24
499 1.3.3.4.5.1 1.3 1.3.3 UW WIPAC Refurbishment Batch #1 (Qty. 20) Refurbishment Batch #1 (Qty. 20) M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C3 20.0% $1,875.47 $649.67 3000 3000 0 $ 3,000 $ 3,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,129 $ - 0 $ 3,248 $ 9,377 $ 1,226 $ 650 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,377.37
500 1.3.3.4.5.2 1.3 1.3.3 UW WIPAC FAT Batch #1 FAT Batch #1 Wendt Labor Hours Labor - Task SC A - Analogy $65 $52 35.00% 53.00% Off Ice C3 20.0% $3,552.03 $1,230.44 10 100 20 130 $ - 0 $ 648 $ 6,475 $ 1,295 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 8,598 $ 3,009 $ 6,152 $ 17,760 $ 2,322 $ 1,230 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $17,760.15
501 1.3.3.4.5.2 1.3 1.3.3 UW WIPAC FAT Batch #1 FAT Batch #1 M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C3 20.0% $1,562.90 $541.40 5000 0 $ - 0 $ 5,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,108 $ - 0 $ 2,707 $ 7,814 $ 1,022 $ 541 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,814.48
502 1.3.3.4.5.3 1.3 1.3.3 UW PSL Packing Batch #1 Packing Batch #1 N.N. Labor Hours Labor - Task TE A - Analogy $46 $77 0.00% 0.00% Off Ice C3 20.0% $375.91 $0.00 40 40 $ - 0 $ - 0 $ - 0 $ 1,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,880 $ - 0 $ - 0 $ 1,880 $ 376 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,879.56
503 1.3.3.4.5.3 1.3 1.3.3 UW WIPAC Packing Batch #1 Packing Batch #1 M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C3 20.0% $312.58 $108.28 1000 0 $ - 0 $ - 0 $ - 0 $ 1,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,022 $ - 0 $ 541 $ 1,563 $ 204 $ 108 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,562.90
504 1.3.3.4.6 1.3 1.3.3 UW WIPAC Ship 2 + 1 spare PDOMs for Strings 87-88 to Pt. Hueneme Ship to Pt. Hueneme M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C3 20.0% $156.29 $54.14 500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 500 $ - 0 $ 511 $ - 0 $ 271 $ 781 $ 102 $ 54 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $781.45
505 1.3.3.4.7 1.3 1.3.3 UW WIPAC Ship 12 + 1 spare PDOMs for Strings 89-93 to Pt. Hueneme Ship to Pt. Hueneme M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C3 20.0% $319.30 $110.61 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,000 $ - 0 $ 1,043 $ - 0 $ 553 $ 1,596 $ 209 $ 111 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,596.50
506 1.3.4.2.3.3 1.3 1.3.4 UW WIPAC Firmware support D-Egg Firmware support during D-Egg FAT S. Griffin Labor Hours Labor - LoE EN D - Expert Opinion $47 $49 35.00% 53.00% Off Ice C1 9.0% $8,686.60 $3,009.08 22 22 22 22 22 22 22 22 22 22 22 22 264 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 12,675 $ 4,436 $ 9,069 $ 26,180 $ 1,540 $ 816 22 22 22 22 22 22 22 22 22 22 22 22 264 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 12,947 $ 4,532 $ 9,264 $ 26,743 $ 1,573 $ 834 22 22 22 22 22 22 22 22 22 22 22 22 264 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 13,226 $ 4,629 $ 9,463 $ 27,318 $ 1,607 $ 852 22 22 22 22 22 22 22 154 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,881 $ 2,758 $ 5,639 $ 16,278 $ 958 $ 507 $96,517.78
507 1.3.4.2.3.5 1.3 1.3.4 UW WIPAC Firmware support mDOM Firmware support during mDOM FAT S. Griffin Labor Hours Labor - LoE EN D - Expert Opinion $47 $49 35.00% 53.00% Off Ice C1 9.0% $8,097.56 $2,805.04 22 22 22 22 22 22 22 22 22 198 $ - 0 $ - 0 $ - 0 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 9,506 $ 3,327 $ 6,802 $ 19,635 $ 1,155 $ 612 22 22 22 22 22 22 22 22 22 22 22 22 264 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 12,947 $ 4,532 $ 9,264 $ 26,743 $ 1,573 $ 834 22 22 22 22 22 22 22 22 22 22 22 22 264 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 13,226 $ 4,629 $ 9,463 $ 27,318 $ 1,607 $ 852 22 22 22 22 22 22 22 154 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ 1,034 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,881 $ 2,758 $ 5,639 $ 16,278 $ 958 $ 507 $89,972.84
508 1.3.4.2.3.6 1.3 1.3.4 UW WIPAC Firmware support during development of Calibration Devices, Special Devices, system integration, and commissioning Firmware support during development of Calibration Devices, Special Devices, system integration, and commissioning S. Griffin Labor Hours Labor - LoE EN D - Expert Opinion $47 $49 35.00% 53.00% Off Ice C1 9.0% $2,763.92 $957.44 7 7 7 7 7 7 7 7 7 7 7 7 84 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 4,033 $ 1,412 $ 2,886 $ 8,330 $ 490 $ 260 7 7 7 7 7 7 7 7 7 7 7 7 84 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 4,120 $ 1,442 $ 2,948 $ 8,509 $ 501 $ 265 7 7 7 7 7 7 7 7 7 7 7 7 84 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 4,208 $ 1,473 $ 3,011 $ 8,692 $ 511 $ 271 7 7 7 7 7 7 7 49 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ 329 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,508 $ 878 $ 1,794 $ 5,179 $ 305 $ 161 $30,710.20
509 1.4.1.1.1.3.2.1 1.4 1.4.1 MSU Fabrication First article cable fabrication Ng Labor Hours Labor - LoE EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C1 9.0% $424.08 $150.48 16 16 16 48 $ 992 $ 992 $ 992 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,040 $ - 0 $ 1,672 $ 4,712 $ 274 $ 150 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,711.98
510 1.4.1.1.1.3.2.2 1.4 1.4.1 MSU Acceptance testing First article acceptance testing Ng Labor Hours Labor - Task EN-ME D - Expert Opinion $62 $62 0.00% 55.00% Off Ice C4 35.0% $1,099.46 $390.13 32 32 $ - 0 $ - 0 $ - 0 $ 1,984 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,027 $ - 0 $ 1,115 $ 3,141 $ 709 $ 390 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,141.32
511 1.4.1.1.1.3.2.2 1.4 1.4.1 MSU Acceptance testing First article acceptance testing Wilkins Labor Hours Labor - Task TE D - Expert Opinion $47 $47 0.00% 55.00% Off Ice C4 35.0% $833.46 $295.74 32 32 $ - 0 $ - 0 $ - 0 $ 1,504 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,536 $ - 0 $ 845 $ 2,381 $ 538 $ 296 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,381.32
512 1.4.1.1.1.3.2.4 1.4 1.4.1 MSU First article shipping to breakout installation facility First article shipping to breakout installation facility Ng Labor Hours Labor - Task EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C3 20.0% $628.26 $222.93 16 16 32 $ - 0 $ - 0 $ - 0 $ 992 $ 992 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,027 $ - 0 $ 1,115 $ 3,141 $ 405 $ 223 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,141.32
513 1.4.1.1.1.3.3 1.4 1.4.1 MSU Production readiness review Production readiness review Ng Labor Hours Labor - Task EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C2 12.5% $687.16 $243.83 56 56 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,472 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,547 $ - 0 $ 1,951 $ 5,497 $ 443 $ 244 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,497.30
514 1.4.1.1.1.3.3 1.4 1.4.1 MSU Production readiness review Production readiness review Wilkins Labor Hours Labor - Task TE A - Analogy $47 $47 0.00% 55.00% Off Ice C2 12.5% $520.91 $184.84 56 56 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,632 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,689 $ - 0 $ 1,479 $ 4,167 $ 336 $ 185 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,167.31
515 1.4.1.1.1.3.4 1.4 1.4.1 MSU Production of final six main cables Production of final six main cables Ng Labor Hours Labor - LoE EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C1 9.0% $424.08 $150.48 16 16 16 48 $ - 0 $ - 0 $ - 0 $ - 0 $ 992 $ 992 $ 992 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,040 $ - 0 $ 1,672 $ 4,712 $ 274 $ 150 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,711.98
516 1.4.1.1.1.3.6 1.4 1.4.1 MSU Production main cable shipping to breakout installation facility Production cable shipping to breakout installation facility Ng Labor Hours Labor - Task EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C3 20.0% $628.26 $222.93 8 8 16 32 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 496 $ 496 $ 992 $ - 0 $ - 0 $ - 0 $ 2,027 $ - 0 $ 1,115 $ 3,141 $ 405 $ 223 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,141.32
517 1.4.1.1.2.2.1 1.4 1.4.1 MSU Breakout final design Breakout final design Wilkins Labor Hours Labor - Task TE D - Expert Opinion $47 $47 0.00% 55.00% Off Ice C5 50.0% $297.67 $105.62 8 8 $ 376 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 384 $ - 0 $ 211 $ 595 $ 192 $ 106 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $595.33
518 1.4.1.1.2.2.1 1.4 1.4.1 MSU Breakout final design Breakout final design Ng Labor Hours Labor - Task EN-ME D - Expert Opinion $62 $62 0.00% 55.00% Off Ice C5 50.0% $1,963.32 $696.66 40 40 $ 2,480 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,533 $ - 0 $ 1,393 $ 3,927 $ 1,267 $ 697 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,926.65
519 1.4.1.1.2.2.2 1.4 1.4.1 MSU Breakout prototype production Breakout prototype production Ng Labor Hours Labor - LoE EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C1 9.0% $282.72 $100.32 16 16 32 $ 992 $ 992 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,027 $ - 0 $ 1,115 $ 3,141 $ 182 $ 100 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,141.32
520 1.4.1.1.2.2.3 1.4 1.4.1 MSU Breakout prototype testing Breakout prototype testing Ng Labor Hours Labor - Task EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C2 12.5% $490.83 $174.17 40 40 $ - 0 $ 2,480 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,533 $ - 0 $ 1,393 $ 3,927 $ 317 $ 174 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,926.65
521 1.4.1.1.2.2.3 1.4 1.4.1 MSU Breakout prototype testing Breakout prototype testing Wilkins Labor Hours Labor - Task TE A - Analogy $47 $47 0.00% 55.00% Off Ice C2 12.5% $372.08 $132.03 40 40 $ - 0 $ 1,880 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,920 $ - 0 $ 1,056 $ 2,977 $ 240 $ 132 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,976.65
522 1.4.1.1.2.2.3 1.4 1.4.1 MSU Breakout prototype testing Breakout prototype testing Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% Off Ice C1 9.0% $1,367.99 $485.42 9600 0 $ - 0 $ 9,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,806 $ - 0 $ 5,394 $ 15,200 $ 883 $ 485 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $15,199.92
523 1.4.1.1.2.2.4 1.4 1.4.1 MSU Breakout final design review Breakout final design review Wilkins Labor Hours Labor - Task TE A - Analogy $47 $47 0.00% 55.00% Off Ice C3 20.0% $1,428.79 $506.99 96 96 $ - 0 $ - 0 $ 4,512 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,609 $ - 0 $ 2,535 $ 7,144 $ 922 $ 507 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,143.96
524 1.4.1.1.2.2.4 1.4 1.4.1 MSU Breakout final design review Breakout final design review Ng Labor Hours Labor - Task EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C3 20.0% $1,884.79 $668.80 96 96 $ - 0 $ - 0 $ 5,952 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,080 $ - 0 $ 3,344 $ 9,424 $ 1,216 $ 669 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,423.95
525 1.4.1.1.2.2.4 1.4 1.4.1 MSU Breakout final design review Breakout final design review Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% Off Ice C1 9.0% $769.50 $273.05 5400 0 $ - 0 $ - 0 $ 5,400 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,516 $ - 0 $ 3,034 $ 8,550 $ 496 $ 273 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $8,549.96
526 1.4.1.1.3.2 1.4 1.4.1 MSU MCA production MCA production Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% Off Ice C1 9.0% $912.00 $323.61 6400 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,400 $ - 0 $ - 0 $ - 0 $ 6,538 $ - 0 $ 3,596 $ 10,133 $ 588 $ 324 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $10,133.28
527 1.4.1.1.3.2 1.4 1.4.1 MSU MCA production MCA production Ng Labor Hours Labor - LoE EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C1 9.0% $494.76 $175.56 16 16 16 8 56 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 992 $ 992 $ 992 $ 496 $ 3,547 $ - 0 $ 1,951 $ 5,497 $ 319 $ 176 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,497.30
528 1.4.1.1.3.3 1.4 1.4.1 MSU Pre-ship review Pre-ship review Wilkins Labor Hours Labor - Task TE A - Analogy $47 $47 0.00% 55.00% Off Ice C3 20.0% $833.46 $295.74 56 56 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,632 $ 2,689 $ - 0 $ 1,479 $ 4,167 $ 538 $ 296 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,167.31
529 1.4.1.1.3.3 1.4 1.4.1 MSU Pre-ship review Pre-ship review Ng Labor Hours Labor - Task EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C3 20.0% $1,099.46 $390.13 56 56 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,472 $ 3,547 $ - 0 $ 1,951 $ 5,497 $ 709 $ 390 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,497.30
530 1.4.1.1.3.4 1.4 1.4.1 MSU Main Cable Assembly shipping to PTH (RDD 12/1/23 for FY24 vessel. ROS 12/1/2025) Main Cable Assembly shipping to PTH Ng Labor Hours Labor - Task EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C3 20.0% $635.02 $225.33 16 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 992 $ 1,013 $ - 0 $ 557 $ 1,571 $ 203 $ 111 8 8 16 $ 496 $ 496 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,035 $ - 0 $ 569 $ 1,604 $ 207 $ 114 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,175.09
531 1.4.1.2.1.5 1.4 1.4.1 MSU BCA prototype testing BCA prototype evaluation Ng Labor Hours Labor - Task EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C4 35.0% $1,030.74 $365.75 30 30 $ 1,860 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,900 $ - 0 $ 1,045 $ 2,945 $ 665 $ 366 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,944.98
532 1.4.1.2.1.5 1.4 1.4.1 MSU BCA prototype testing BCA prototype evaluation Wilkins Labor Hours Labor - Task TE A - Analogy $47 $47 0.00% 55.00% Off Ice C4 35.0% $781.37 $277.26 30 30 $ 1,410 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,440 $ - 0 $ 792 $ 2,232 $ 504 $ 277 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,232.49
533 1.4.1.2.1.5 1.4 1.4.1 MSU BCA prototype testing BCA prototype evaluation Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% Off Ice C1 9.0% $1,367.99 $485.42 9600 0 $ 9,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,806 $ - 0 $ 5,394 $ 15,200 $ 883 $ 485 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $15,199.92
534 1.4.1.2.2.1 1.4 1.4.1 MSU BCA final design BCA final design Ng Labor Hours Labor - Task EN-ME D - Expert Opinion $62 $62 0.00% 55.00% Off Ice C4 35.0% $4,810.14 $1,706.82 80 60 140 $ 4,960 $ 3,720 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 8,867 $ - 0 $ 4,877 $ 13,743 $ 3,103 $ 1,707 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $13,743.26
535 1.4.1.2.2.1 1.4 1.4.1 MSU BCA final design BCA final design Wilkins Labor Hours Labor - Task TE D - Expert Opinion $47 $47 0.00% 55.00% Off Ice C4 35.0% $2,083.66 $739.36 40 40 80 $ 1,880 $ 1,880 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,841 $ - 0 $ 2,112 $ 5,953 $ 1,344 $ 739 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,953.30
536 1.4.1.2.2.2 1.4 1.4.1 MSU BCA final design review BCA final design review Ng Labor Hours Labor - Task EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C2 12.5% $1,177.99 $418.00 20 76 96 $ - 0 $ 1,240 $ 4,712 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,080 $ - 0 $ 3,344 $ 9,424 $ 760 $ 418 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $9,423.95
537 1.4.1.2.2.2 1.4 1.4.1 MSU BCA final design review BCA final design review Wilkins Labor Hours Labor - Task TE A - Analogy $47 $47 0.00% 55.00% Off Ice C2 12.5% $893.00 $316.87 20 76 96 $ - 0 $ 940 $ 3,572 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,609 $ - 0 $ 2,535 $ 7,144 $ 576 $ 317 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,143.96
538 1.4.1.2.2.2 1.4 1.4.1 MSU BCA final design review BCA final design review Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% Off Ice C1 9.0% $769.50 $273.05 5400 0 $ - 0 $ - 0 $ 5,400 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,516 $ - 0 $ 3,034 $ 8,550 $ 496 $ 273 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $8,549.96
539 1.4.1.2.2.4 1.4 1.4.1 MSU BCA procurement BCA procurement Ng Labor Hours Labor - Task EN-ME D - Expert Opinion $62 $62 0.00% 55.00% Off Ice C4 35.0% $2,748.65 $975.33 40 32 8 80 $ - 0 $ - 0 $ 2,480 $ 1,984 $ 496 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,067 $ - 0 $ 2,787 $ 7,853 $ 1,773 $ 975 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,853.29
540 1.4.1.2.3.1 1.4 1.4.1 MSU BCA manufacturing BCA manufacturing - first two strings Ng Labor Hours Labor - LoE EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C1 9.0% $706.80 $250.80 16 16 16 16 16 80 $ - 0 $ - 0 $ - 0 $ - 0 $ 992 $ 992 $ 992 $ 992 $ 992 $ - 0 $ - 0 $ - 0 $ 5,067 $ - 0 $ 2,787 $ 7,853 $ 456 $ 251 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,853.29
541 1.4.1.2.3.1 1.4 1.4.1 MSU BCA manufacturing BCA manufacturing - first two strings Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% Off Ice C1 9.0% $912.00 $323.61 6400 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,400 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,538 $ - 0 $ 3,596 $ 10,133 $ 588 $ 324 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $10,133.28
542 1.4.1.2.3.1 1.4 1.4.1 MSU BCA manufacturing BCA connectors - first two strings, MCA side (62 connectors) CapEx CapEx A - Analogy $1 0.00% 0.00% Off Ice C3 20.0% $4,433.31 $0.00 PCA side connectors already purchased 21700 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 21,700 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 22,167 $ - 0 $ - 0 $ 22,167 $ 4,433 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $22,166.55
543 1.4.1.2.3.1 1.4 1.4.1 MSU BCA manufacturing BCA cable - first two strings (3,000 m) CapEx CapEx A - Analogy $1 0.00% 0.00% Off Ice C4 35.0% $18,233.78 $0.00 2,000 m of cable for first two strings and spares, $15/m based on SB 45027 51000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 51,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 52,097 $ - 0 $ - 0 $ 52,097 $ 18,234 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $52,096.50
544 1.4.1.2.3.1 1.4 1.4.1 MSU BCA manufacturing BCA fabrication costs - first two strings CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $8,938.13 $0.00 25000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 25,000 $ - 0 $ - 0 $ - 0 $ 25,538 $ - 0 $ - 0 $ 25,538 $ 8,938 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $25,537.50
545 1.4.1.2.3.2 1.4 1.4.1 MSU BCA pre-ship review BCA pre-ship review Ng Labor Hours Labor - Task EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C3 20.0% $1,099.46 $390.13 56 56 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,472 $ - 0 $ - 0 $ - 0 $ 3,547 $ - 0 $ 1,951 $ 5,497 $ 709 $ 390 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,497.30
546 1.4.1.2.3.3 1.4 1.4.1 MSU Shipping to PTH (FY24 vessel, RDD 12/1/23 - ROS 2/1/25 to pre-position) Shipping to PTH Ng Labor Hours Labor - Task EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C3 20.0% $628.26 $222.93 16 16 32 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 992 $ 992 $ - 0 $ - 0 $ 2,027 $ - 0 $ 1,115 $ 3,141 $ 405 $ 223 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,141.32
547 1.4.1.2.3.3 1.4 1.4.1 MSU Shipping to PTH (FY24 vessel, RDD 12/1/23 - ROS 2/1/25 to pre-position) BCA shipping costs to PTH (1st two strings) M & S M & S D - Expert Opinion $1 0.00% 55.00% Off Ice C4 35.0% $4,433.31 $1,573.11 8000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 8,000 $ - 0 $ - 0 $ - 0 $ 8,172 $ - 0 $ 4,495 $ 12,667 $ 2,860 $ 1,573 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $12,666.60
548 1.4.1.2.4.1 1.4 1.4.1 MSU BCA manufacturing - final five strings BCA manufacturing Ng Labor Hours Labor - LoE EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C1 9.0% $568.48 $201.72 16 16 16 48 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 992 $ 992 $ 992 $ 3,040 $ - 0 $ 1,672 $ 4,712 $ 274 $ 150 16 16 $ 992 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,035 $ - 0 $ 569 $ 1,604 $ 93 $ 51 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $6,316.40
549 1.4.1.2.4.1 1.4 1.4.1 MSU BCA manufacturing - final five strings BCA manufacturing Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% Off Ice C1 9.0% $912.00 $323.61 6400 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,400 $ 6,538 $ - 0 $ 3,596 $ 10,133 $ 588 $ 324 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $10,133.28
550 1.4.1.2.4.1 1.4 1.4.1 MSU BCA manufacturing - final five strings BCA connectors - last five strings, MCA side (110 connectors) CapEx CapEx A - Analogy $1 0.00% 0.00% Off Ice C3 20.0% $7,865.55 $0.00 38500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 38,500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 39,328 $ - 0 $ - 0 $ 39,328 $ 7,866 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $39,327.75
551 1.4.1.2.4.1 1.4 1.4.1 MSU BCA manufacturing - final five strings BCA cable - last five strings (6,830 m) CapEx CapEx A - Analogy $1 0.00% 0.00% Off Ice C4 35.0% $41,512.23 $0.00 4,556 m of cable for remaining five strings, $15/m based on SB 45027 116110 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 116,110 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 118,606 $ - 0 $ - 0 $ 118,606 $ 41,512 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $118,606.37
552 1.4.1.2.4.1 1.4 1.4.1 MSU BCA manufacturing - final five strings BCA fabrication costs - last five strings CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $16,434.53 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 45000 0 $ 45,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 46,956 $ - 0 $ - 0 $ 46,956 $ 16,435 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $46,955.80
553 1.4.1.2.4.2 1.4 1.4.1 MSU Shipping to PTH (FY24 vessel, RDD 12/1/23 - ROS 12/1/25) Shipping to PTH Ng Labor Hours Labor - Task EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C2 12.5% $401.11 $142.33 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 32 32 $ 1,984 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,070 $ - 0 $ 1,139 $ 3,209 $ 259 $ 142 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,208.86
554 1.4.1.2.4.2 1.4 1.4.1 MSU Shipping to PTH (FY24 vessel, RDD 12/1/23 - ROS 12/1/25) BCA shipping costs to PTH (remaining strings) M & S M & S D - Expert Opinion $1 0.00% 55.00% Off Ice C4 35.0% $5,660.78 $2,008.66 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 10000 0 $ 10,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,435 $ - 0 $ 5,739 $ 16,174 $ 3,652 $ 2,009 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $16,173.66
555 1.4.1.2.5 1.4 1.4.1 MSU Breakout Cable Assemblies support Breakout Cable Assembly miscellaneous supplies M & S M & S F - Parametric $1 0.00% 55.00% Off Ice C1 9.0% $89.44 $31.74 125 125 125 125 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 511 $ - 0 $ 281 $ 792 $ 46 $ 25 125 0 $ 125 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 130 $ - 0 $ 72 $ 202 $ 12 $ 6 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $993.83
556 1.4.1.3.4.2 1.4 1.4.1 MSU SPAT cable materials procurement SPAT cable materials M & S M & S C - Engineering Buildup $1 0.00% 55.00% Off Ice C2 12.5% $190.00 $67.42 960 0 $ 960 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 981 $ - 0 $ 539 $ 1,520 $ 123 $ 67 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,519.99
557 1.4.1.3.4.3 1.4 1.4.1 MSU SPAT cable production SPAT cable production Wilkins Labor Hours Labor - Task TE A - Analogy $47 $47 0.00% 55.00% Off Ice C3 20.0% $595.33 $211.25 40 40 $ 1,880 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,920 $ - 0 $ 1,056 $ 2,977 $ 384 $ 211 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,976.65
558 1.4.1.3.4.4 1.4 1.4.1 MSU SPAT cable shipping to WIPAC SPAT cable shipping Wilkins Labor Hours Labor - Task TE A - Analogy $47 $47 0.00% 55.00% Off Ice C2 12.5% $74.42 $26.41 8 8 $ - 0 $ 376 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 384 $ - 0 $ 211 $ 595 $ 48 $ 26 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $595.33
559 1.4.1.3.5 1.4 1.4.1 MSU Penetrator Cable Assemblies support Penetrator Cable Assembly Miscellaneous supplies M & S M & S F - Parametric $1 0.00% 55.00% Off Ice C1 9.0% $17.81 $6.32 125 0 $ 125 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 128 $ - 0 $ 70 $ 198 $ 11 $ 6 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $197.92
560 1.4.1.4.1.5 1.4 1.4.1 MSU String hardware final design review String hardware final design review Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% Off Ice C1 9.0% $513.00 $182.03 3600 0 $ 3,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,677 $ - 0 $ 2,023 $ 5,700 $ 331 $ 182 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,699.97
561 1.4.1.4.1.7 1.4 1.4.1 MSU String hardware production String hardware shipping to MCA production facility Ng Labor Hours Labor - Task EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C3 20.0% $314.13 $111.47 8 8 16 $ 496 $ 496 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,013 $ - 0 $ 557 $ 1,571 $ 203 $ 111 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,570.66
562 1.4.1.4.2 1.4 1.4.1 MSU String hardware support String hardware miscellaneous supplies M & S M & S F - Parametric $1 0.00% 55.00% Off Ice C1 9.0% $35.62 $12.64 125 125 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 255 $ - 0 $ 140 $ 396 $ 23 $ 13 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $395.83
563 1.4.1.6.1 1.4 1.4.1 MSU Off-ice training Cable SMEs (FS3) Off-Ice Safety Training FS3 Cable SMEs (Headcount 2) Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% On Ice C1 9.0% $535.29 $189.94 standard domestic trip $1800 (x2) 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 3600 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,600 $ - 0 $ 3,837 $ - 0 $ 2,110 $ 5,948 $ 345 $ 190 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,947.70
564 1.4.1.6.3 1.4 1.4.1 MSU PQ, ECW & Deployment Travel Costs Cable SMEs (FS3) Cable SME FS3 PQ costs (Headcount 2) M & S M & S C - Engineering Buildup $1 0.00% 55.00% On Ice C2 12.5% $289.12 $102.59 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 700 700 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 700 $ 700 $ - 0 $ - 0 $ 1,492 $ - 0 $ 821 $ 2,313 $ 187 $ 103 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,313.00
565 1.4.1.6.3 1.4 1.4.1 MSU PQ, ECW & Deployment Travel Costs Cable SMEs (FS3) Cable SME FS3 ECW costs (Headcount 2) M & S M & S C - Engineering Buildup $1 0.00% 55.00% On Ice C2 12.5% $103.26 $36.64 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 250 250 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 250 $ 250 $ 533 $ - 0 $ 293 $ 826 $ 67 $ 37 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $826.07
566 1.4.1.6.3 1.4 1.4.1 MSU PQ, ECW & Deployment Travel Costs Cable SMEs (FS3) Cable SME FS3 Deployment travel (Headcount 2) Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% On Ice C1 9.0% $546.80 $194.03 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2160 1440 0 $ - 0 $ 2,160 $ - 0 $ - 0 $ 1,440 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,920 $ - 0 $ 2,156 $ 6,076 $ 353 $ 194 $6,075.58
567 1.4.1.6.4 1.4 1.4.1 MSU Cable SME support for FS3 activities (slot 1) On-Ice Cable SME support for FS3 activities (slot 1) Ng Labor Hours Labor - LoE EN-ME C - Engineering Buildup $62 $62 0.00% 55.00% On Ice C1 9.0% $2,825.14 $1,002.47 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 75 150 75 300 $ - 0 $ 4,650 $ 9,300 $ 4,650 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 20,252 $ - 0 $ 11,139 $ 31,390 $ 1,823 $ 1,002 $31,390.49
568 1.4.1.6.5 1.4 1.4.1 MSU Cable SME support for FS3 activities (slot 2) On-Ice Cable SME support for FS3 activities (slot 2) TBD Labor Hours Labor - LoE EN-ME C - Engineering Buildup $62 $62 0.00% 55.00% On Ice C1 9.0% $1,789.26 $634.90 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 150 190 $ - 0 $ - 0 $ 2,480 $ 9,300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 12,826 $ - 0 $ 7,054 $ 19,881 $ 1,154 $ 635 $19,880.65
569 1.4.2.2.4 1.4 1.4.2 MSU Fabrication Fabrication Ng Labor Hours Labor - Task EN-ME D - Expert Opinion $62 $62 0.00% 55.00% Off Ice C4 35.0% $274.87 $97.53 8 8 $ 496 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 507 $ - 0 $ 279 $ 785 $ 177 $ 98 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $785.33
570 1.4.2.2.4 1.4 1.4.2 MSU Fabrication SJBs CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C4 35.0% $5,005.35 $0.00 14000 0 $ 14,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,301 $ - 0 $ - 0 $ 14,301 $ 5,005 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,301.00
571 1.4.2.2.6 1.4 1.4.2 MSU Pre-ship review Pre-ship review Wilkins Labor Hours Labor - Task TE A - Analogy $47 $47 0.00% 55.00% Off Ice C2 12.5% $223.25 $79.22 24 24 $ 1,128 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,152 $ - 0 $ 634 $ 1,786 $ 144 $ 79 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,785.99
572 1.4.2.2.6 1.4 1.4.2 MSU Pre-ship review Pre-ship review Ng Labor Hours Labor - Task EN-ME A - Analogy $62 $62 0.00% 55.00% Off Ice C2 12.5% $294.50 $104.50 24 24 $ 1,488 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,520 $ - 0 $ 836 $ 2,356 $ 190 $ 104 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,355.99
573 1.4.2.2.6 1.4 1.4.2 UW WIPAC Pre-ship review Pre-ship review Kelley Labor Hours Labor - Task SS A - Analogy $64 $66 35.00% 53.00% Off Ice C2 12.5% $404.79 $140.22 24 24 $ 1,535 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,568 $ 549 $ 1,122 $ 3,238 $ 265 $ 140 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,238.29
574 1.4.2.2.6 1.4 1.4.2 MSU Pre-ship review Shipping to PTH Ng Labor Hours Labor - Task EN-ME D - Expert Opinion $62 $62 0.00% 55.00% Off Ice C3 20.0% $471.20 $167.20 24 24 $ 1,488 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,520 $ - 0 $ 836 $ 2,356 $ 304 $ 167 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,355.99
575 1.4.2.2.6 1.4 1.4.2 MSU Pre-ship review Shipping costs to PTH M & S M & S D - Expert Opinion $1 0.00% 55.00% Off Ice C4 35.0% $831.25 $294.96 1500 0 $ 1,500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,532 $ - 0 $ 843 $ 2,375 $ 536 $ 295 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,374.99
576 1.4.2.2.8 1.4 1.4.2 MSU Surface Junction Box support Surface Junction Box miscellaneous supplies M & S M & S F - Parametric $1 0.00% 55.00% Off Ice C1 9.0% $17.81 $6.32 125 0 $ - 0 $ 125 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 128 $ - 0 $ 70 $ 198 $ 11 $ 6 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $197.92
577 1.4.2.3.2.3 1.4 1.4.2 UW WIPAC Fabrication Fabrication Kelley Labor Hours Labor - Task SS D - Expert Opinion $64 $66 35.00% 53.00% Off Ice C4 35.0% $944.50 $327.18 20 20 $ 1,279 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,306 $ 457 $ 935 $ 2,699 $ 617 $ 327 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,698.57
578 1.4.2.3.2.4 1.4 1.4.2 UW WIPAC Pre-ship review Pre-ship review Kelley Labor Hours Labor - Task SS A - Analogy $64 $66 35.00% 53.00% Off Ice C2 12.5% $134.93 $46.74 8 8 $ - 0 $ 512 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 523 $ 183 $ 374 $ 1,079 $ 88 $ 47 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,079.43
579 1.4.2.3.2.5 1.4 1.4.2 UW WIPAC Shipping to PTH (NB: small -- RDD 9/15/23 for ComSur FY25, ROS 12/15/23) Shipping to PTH (NB: small) Kelley Labor Hours Labor - Task SS D - Expert Opinion $64 $66 35.00% 53.00% Off Ice C3 20.0% $431.77 $149.57 8 8 16 $ - 0 $ 512 $ 512 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,045 $ 366 $ 748 $ 2,159 $ 282 $ 150 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,158.86
580 1.4.2.3.2.5 1.4 1.4.2 UW WIPAC Shipping to PTH (NB: small -- RDD 9/15/23 for ComSur FY25, ROS 12/15/23) Shipping costs M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C4 35.0% $547.01 $189.49 1000 0 $ - 0 $ 1,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,022 $ - 0 $ 541 $ 1,563 $ 358 $ 189 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,562.90
581 1.4.2.3.3.1 1.4 1.4.2 UW WIPAC Final design Final design Kelley Labor Hours Labor - Task SS D - Expert Opinion $64 $66 35.00% 53.00% Off Ice C4 35.0% $1,133.40 $392.62 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,535 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,568 $ 549 $ 1,122 $ 3,238 $ 741 $ 393 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,238.29
582 1.4.2.3.3.3 1.4 1.4.2 UW WIPAC Final design review Final design review Kelley Labor Hours Labor - Task SS A - Analogy $64 $66 35.00% 53.00% Off Ice C2 12.5% $944.50 $327.18 56 56 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,581 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,658 $ 1,280 $ 2,617 $ 7,556 $ 617 $ 327 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,556.00
583 1.4.2.3.3.4 1.4 1.4.2 UW WIPAC Procurement Procurement Kelley Labor Hours Labor - Task SS D - Expert Opinion $64 $66 35.00% 53.00% Off Ice C3 20.0% $431.77 $149.57 8 8 16 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 512 $ 512 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,045 $ 366 $ 748 $ 2,159 $ 282 $ 150 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,158.86
584 1.4.2.3.3.4 1.4 1.4.2 MSU Procurement Procurement Wilkins Labor Hours Labor - LoE TE A - Analogy $47 $47 0.00% 55.00% Off Ice C1 9.0% $267.90 $95.06 8 8 8 8 8 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 376 $ 376 $ 376 $ 376 $ 376 $ - 0 $ - 0 $ 1,920 $ - 0 $ 1,056 $ 2,977 $ 173 $ 95 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,976.65
585 1.4.2.3.3.4 1.4 1.4.2 UW WIPAC Procurement Patch cables (169) M & S M & S C - Engineering Buildup $1 0.00% 53.00% Off Ice C2 12.5% $5,777.83 $2,001.47 29575 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 29,575 $ - 0 $ - 0 $ - 0 $ - 0 $ 30,211 $ - 0 $ 16,012 $ 46,223 $ 3,776 $ 2,001 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $46,222.62
586 1.4.2.3.3.5 1.4 1.4.2 MSU Production Production Wilkins Labor Hours Labor - Task TE D - Expert Opinion $47 $47 0.00% 55.00% Off Ice C3 20.0% $2,688.59 $954.01 50 50 50 150 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,350 $ 2,350 $ 2,350 $ 7,202 $ - 0 $ 3,961 $ 11,162 $ 1,440 $ 792 30 30 $ 1,410 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,471 $ - 0 $ 809 $ 2,280 $ 294 $ 162 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $13,442.93
587 1.4.2.3.3.6 1.4 1.4.2 UW WIPAC Pre-ship review Pre-ship review Kelley Labor Hours Labor - Task SS A - Analogy $64 $66 35.00% 53.00% Off Ice C2 12.5% $413.49 $143.23 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 24 24 $ 1,535 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,602 $ 561 $ 1,146 $ 3,308 $ 270 $ 143 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,307.91
588 1.4.2.3.3.7 1.4 1.4.2 MSU Shipping to PTH (RDD 9/15/24 for FY25 ComSur, ROS 12/1/24) Shipping to PTH Wilkins Labor Hours Labor - Task TE D - Expert Opinion $47 $47 0.00% 55.00% Off Ice C3 20.0% $486.50 $172.63 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 24 8 32 $ 1,128 $ 376 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,569 $ - 0 $ 863 $ 2,433 $ 314 $ 173 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,432.52
589 1.4.2.3.3.7 1.4 1.4.2 UW WIPAC Shipping to PTH (RDD 9/15/24 for FY25 ComSur, ROS 12/1/24) Patch cable shipping costs M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C4 35.0% $670.53 $232.27 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1200 0 $ - 0 $ 1,200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,252 $ - 0 $ 664 $ 1,916 $ 438 $ 232 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,915.80
590 1.4.2.3.4 1.4 1.4.2 UW WIPAC ICL Upgrade support ICL Upgrade Support miscellaneous supplies M & S M & S F - Parametric $1 0.00% 53.00% Off Ice C1 9.0% $253.04 $87.66 125 125 125 125 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 511 $ - 0 $ 271 $ 781 $ 46 $ 24 125 125 125 125 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 522 $ - 0 $ 277 $ 798 $ 47 $ 25 125 125 125 125 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 533 $ - 0 $ 282 $ 815 $ 48 $ 25 125 125 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 272 $ - 0 $ 144 $ 416 $ 24 $ 13 $2,811.58
591 1.4.2.4.4 1.4 1.4.2 MSU PQ, ECW, Deployment Travel Costs Cable SMEs (FS2) Cable SME FS2 PQ costs (Headcount 2) M & S M & S C - Engineering Buildup $1 0.00% 55.00% On Ice C2 12.5% $283.04 $100.43 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 700 700 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 700 $ 700 $ - 0 $ - 0 $ 1,461 $ - 0 $ 803 $ 2,264 $ 183 $ 100 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,264.31
592 1.4.2.4.4 1.4 1.4.2 MSU PQ, ECW, Deployment Travel Costs Cable SMEs (FS2) Cable SME FS2 ECW costs (Headcount 2) M & S M & S C - Engineering Buildup $1 0.00% 55.00% On Ice C2 12.5% $101.09 $35.87 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 250 250 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 250 $ 250 $ 522 $ - 0 $ 287 $ 809 $ 65 $ 36 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $808.68
593 1.4.2.4.4 1.4 1.4.2 MSU PQ, ECW, Deployment Travel Costs Cable SMEs (FS2) Cable SME FS2 Deployment travel (Headcount 2) Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% On Ice C1 9.0% $535.29 $189.94 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2160 1440 0 $ - 0 $ 2,160 $ - 0 $ - 0 $ 1,440 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,837 $ - 0 $ 2,110 $ 5,948 $ 345 $ 190 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,947.70
594 1.4.2.4.5 1.4 1.4.2 MSU Cable SME support for FS2 activities (slot 1) Cable SME support for FS2 activities (slot 1) Ng Labor Hours Labor - LoE EN-ME C - Engineering Buildup $62 $62 0.00% 55.00% On Ice C1 9.0% $1,060.18 $376.19 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 75 40 115 $ - 0 $ - 0 $ 4,650 $ 2,480 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,600 $ - 0 $ 4,180 $ 11,780 $ 684 $ 376 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $11,779.76
595 1.4.2.4.6 1.4 1.4.2 MSU Cable SME support for FS2 activities (slot 2) Cable SME support for FS2 activities (slot 2) Shoolz Labor Hours Labor - LoE EN-EE C - Engineering Buildup $72 $72 0.00% 55.00% On Ice C1 9.0% $1,605.88 $569.83 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 75 75 150 $ - 0 $ - 0 $ 5,400 $ 5,400 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 11,512 $ - 0 $ 6,331 $ 17,843 $ 1,036 $ 570 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $17,843.11
596 1.4.4.1.1.1 1.4 1.4.4 UW WIPAC Procurement Procurement Kelley Labor Hours Labor - LoE SS A - Analogy $64 $66 35.00% 53.00% Off Ice C1 9.0% $485.74 $168.26 8 8 8 8 8 40 $ 512 $ 512 $ 512 $ 512 $ 512 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,613 $ 915 $ 1,870 $ 5,397 $ 317 $ 168 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,397.15
597 1.4.4.1.1.1 1.4 1.4.4 UW WIPAC Procurement White Rabbit OEM nodes for NTS and SPTS (10 total, 6 to be purchased) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $826.78 $0.00 4 already purchased by NvE, 6 more planned 6475 0 $ 6,475 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,614 $ - 0 $ - 0 $ 6,614 $ 827 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $6,614.21
598 1.4.4.1.1.1 1.4 1.4.4 UW WIPAC Procurement White Rabbit OEM nodes for ICL (10) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $1,377.88 $0.00 10791 0 $ 10,791 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 11,023 $ - 0 $ - 0 $ 11,023 $ 1,378 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $11,023.01
599 1.4.4.1.1.1 1.4 1.4.4 UW WIPAC Procurement Fiber patch cables for ICL (10) M & S M & S C - Engineering Buildup $1 0.00% 53.00% Off Ice C2 12.5% $39.07 $13.53 200 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 204 $ - 0 $ 108 $ 313 $ 26 $ 14 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $312.58
600 1.4.4.1.1.5 1.4 1.4.4 UW WIPAC Shipping to PTH (RDD 9/15/24 for FY25 ComSur - ROS 12/1/24) Shipping to PTH Kelley Labor Hours Labor - Task SS D - Expert Opinion $64 $66 35.00% 53.00% Off Ice C3 20.0% $647.66 $224.35 8 8 8 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 512 $ 512 $ 512 $ - 0 $ - 0 $ - 0 $ 1,568 $ 549 $ 1,122 $ 3,238 $ 423 $ 224 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,238.29
601 1.4.4.1.1.5 1.4 1.4.4 UW WIPAC Shipping to PTH (RDD 9/15/24 for FY25 ComSur - ROS 12/1/24) Shipping costs M & S M & S A - Analogy $1 0.00% 53.00% Off Ice C4 35.0% $164.10 $56.85 300 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 300 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 306 $ - 0 $ 162 $ 469 $ 107 $ 57 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $468.87
602 1.4.4.1.2.1 1.4 1.4.4 UW WIPAC Final design Final design Kelley Labor Hours Labor - Task SS D - Expert Opinion $64 $66 35.00% 53.00% Off Ice C4 35.0% $6,753.65 $2,339.50 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 40 60 20 20 140 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,558 $ 3,837 $ 1,279 $ 1,279 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,342 $ 3,270 $ 6,684 $ 19,296 $ 4,414 $ 2,339 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $19,296.14
603 1.4.4.1.2.2 1.4 1.4.4 UW WIPAC Prototype production Prototype production Kelley Labor Hours Labor - Task SS D - Expert Opinion $64 $66 35.00% 53.00% Off Ice C3 20.0% $2,205.27 $763.92 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 80 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,116 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,338 $ 1,868 $ 3,820 $ 11,026 $ 1,441 $ 764 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $11,026.37
604 1.4.4.1.2.2 1.4 1.4.4 UW WIPAC Prototype production Timing monitoring prototype CapEx CapEx A - Analogy $1 0.00% 0.00% Off Ice C3 20.0% $626.08 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 3000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,000 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,130 $ - 0 $ - 0 $ 3,130 $ 626 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,130.39
605 1.4.4.1.2.3 1.4 1.4.4 UW WIPAC Installation and testing at NTS/SPTS Installation and testing at NTS/SPTS Kelley Labor Hours Labor - Task SS D - Expert Opinion $64 $66 35.00% 53.00% Off Ice C3 20.0% $1,653.96 $572.94 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 60 60 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,837 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,004 $ 1,401 $ 2,865 $ 8,270 $ 1,081 $ 573 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $8,269.78
606 1.4.4.1.2.3 1.4 1.4.4 UW WIPAC Installation and testing at NTS/SPTS Installation and testing at NTS/SPTS Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $258.63 $89.59 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,878 $ - 0 $ 995 $ 2,874 $ 169 $ 90 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,873.70
607 1.4.4.1.2.4 1.4 1.4.4 UW WIPAC Production of ICL system Production of ICL system Kelley Labor Hours Labor - Task SS D - Expert Opinion $64 $66 35.00% 53.00% Off Ice C3 20.0% $2,205.27 $763.92 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 40 20 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,279 $ 2,558 $ 1,279 $ - 0 $ - 0 $ 5,338 $ 1,868 $ 3,820 $ 11,026 $ 1,441 $ 764 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $11,026.37
608 1.4.4.1.2.4 1.4 1.4.4 UW WIPAC Production of ICL system Timing monitoring system for ICL CapEx CapEx A - Analogy $1 0.00% 0.00% Off Ice C3 20.0% $1,252.15 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 6000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,000 $ - 0 $ - 0 $ 6,261 $ - 0 $ - 0 $ 6,261 $ 1,252 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $6,260.77
609 1.4.4.1.2.6 1.4 1.4.4 UW WIPAC Shipping to PTH (RDD 9/15/24 for FY25 ComSur, ROS 12/1/24) Shipping to PTH Kelley Labor Hours Labor - Task SS D - Expert Opinion $64 $66 35.00% 53.00% Off Ice C3 20.0% $661.58 $229.18 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 24 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,535 $ - 0 $ - 0 $ 1,602 $ 561 $ 1,146 $ 3,308 $ 432 $ 229 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,307.91
610 1.4.4.1.2.6 1.4 1.4.4 UW WIPAC Shipping to PTH (RDD 9/15/24 for FY25 ComSur, ROS 12/1/24) Shipping costs M & S M & S A - Analogy $1 0.00% 53.00% Off Ice C4 35.0% $167.63 $58.07 assumes joint shipment with 1.4.4.1.1 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 300 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 300 $ - 0 $ - 0 $ 313 $ - 0 $ 166 $ 479 $ 110 $ 58 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $478.95
611 1.4.4.1.3 1.4 1.4.4 UW WIPAC Timing systems support Timing systems miscellaneous supplies M & S M & S F - Parametric $1 0.00% 53.00% Off Ice C1 9.0% $160.52 $55.60 125 125 125 125 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ 511 $ - 0 $ 271 $ 781 $ 46 $ 24 125 125 125 125 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ 522 $ - 0 $ 277 $ 798 $ 47 $ 25 125 0 $ - 0 $ 125 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 133 $ - 0 $ 71 $ 204 $ 12 $ 6 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,783.55
612 1.4.4.2.1.5 1.4 1.4.4 UW WIPAC Procurement Procurement Kelley Labor Hours Labor - LoE SS A - Analogy $64 $66 35.00% 53.00% Off Ice C1 9.0% $680.04 $235.57 8 8 8 8 8 8 8 56 $ - 0 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,658 $ 1,280 $ 2,617 $ 7,556 $ 444 $ 236 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,556.00
613 1.4.4.2.1.5 1.4 1.4.4 UW WIPAC Procurement DC power supply chassis for ICL (3) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $254.74 $0.00 1995 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,995 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,038 $ - 0 $ - 0 $ 2,038 $ 255 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,037.89
614 1.4.4.2.1.5 1.4 1.4.4 UW WIPAC Procurement 48V DC power supply modules for ICL (15) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $923.18 $0.00 7230 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,230 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,385 $ - 0 $ - 0 $ 7,385 $ 923 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $7,385.45
615 1.4.4.2.2.1 1.4 1.4.4 UW WIPAC Final design Final design Kelley Labor Hours Labor - Task SS D - Expert Opinion $64 $66 35.00% 53.00% Off Ice C4 35.0% $755.60 $261.74 16 16 $ 1,023 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,045 $ 366 $ 748 $ 2,159 $ 494 $ 262 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,158.86
616 1.4.4.2.2.4 1.4 1.4.4 UW WIPAC Production Production Kelley Labor Hours Labor - LoE SS A - Analogy $64 $66 35.00% 53.00% Off Ice C1 9.0% $728.61 $252.40 10 10 10 10 10 10 60 $ - 0 $ 640 $ 640 $ 640 $ 640 $ 640 $ 640 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,919 $ 1,372 $ 2,804 $ 8,096 $ 476 $ 252 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $8,095.72
617 1.4.4.2.2.4 1.4 1.4.4 UW WIPAC Production Custom power fanout unit for NTS CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $260.48 $0.00 1275 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,275 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,302 $ - 0 $ - 0 $ 1,302 $ 260 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,302.41
618 1.4.4.2.2.4 1.4 1.4.4 UW WIPAC Production Power fanout cables for NTS (5) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $102.15 $0.00 800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 817 $ - 0 $ - 0 $ 817 $ 102 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $817.20
619 1.4.4.2.2.4 1.4 1.4.4 UW WIPAC Production Custom power fanout units for ICL (2) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $520.97 $0.00 2550 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,550 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,605 $ - 0 $ - 0 $ 2,605 $ 521 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,604.83
620 1.4.4.2.2.4 1.4 1.4.4 UW WIPAC Production Power fanout cables for ICL (10) CapEx CapEx C - Engineering Buildup $1 0.00% 0.00% Off Ice C2 12.5% $204.30 $0.00 1600 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,600 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,634 $ - 0 $ - 0 $ 1,634 $ 204 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,634.40
621 1.4.4.2.3.4 1.4 1.4.4 UW WIPAC Production Production Kelley Labor Hours Labor - LoE SS A - Analogy $64 $66 35.00% 53.00% Off Ice C1 9.0% $1,457.23 $504.79 24 24 24 24 24 120 $ - 0 $ 1,535 $ 1,535 $ 1,535 $ 1,535 $ 1,535 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,839 $ 2,744 $ 5,609 $ 16,191 $ 952 $ 505 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $16,191.44
622 1.4.4.2.3.4 1.4 1.4.4 UW WIPAC Production Power control unit for NTS CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $153.23 $0.00 750 0 $ - 0 $ - 0 $ - 0 $ 750 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 766 $ - 0 $ - 0 $ 766 $ 153 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $766.13
623 1.4.4.2.3.4 1.4 1.4.4 UW WIPAC Production Power control units for ICL (2) CapEx CapEx D - Expert Opinion $1 0.00% 0.00% Off Ice C3 20.0% $306.45 $0.00 1500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,532 $ - 0 $ - 0 $ 1,532 $ 306 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,532.25
624 1.4.4.2.4.1 1.4 1.4.4 UW WIPAC Power system installation and testing at NTS Installation and testing at NTS Kelley Labor Hours Labor - Task SS D - Expert Opinion $64 $66 35.00% 53.00% Off Ice C3 20.0% $1,079.43 $373.92 40 40 $ 2,558 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,613 $ 915 $ 1,870 $ 5,397 $ 706 $ 374 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,397.15
625 1.4.4.2.4.1 1.4 1.4.4 UW WIPAC Power system installation and testing at NTS Installation and testing at NTS Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $253.19 $87.71 1800 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,839 $ - 0 $ 975 $ 2,813 $ 165 $ 88 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,813.21
626 1.4.4.2.4.2 1.4 1.4.4 UW WIPAC Power system final design review Power system final design review Kelley Labor Hours Labor - Task SS A - Analogy $64 $66 35.00% 53.00% Off Ice C3 20.0% $2,590.63 $897.41 40 56 96 $ 2,558 $ 3,581 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,271 $ 2,195 $ 4,487 $ 12,953 $ 1,693 $ 897 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $12,953.15
627 1.4.4.2.4.3 1.4 1.4.4 UW WIPAC Pre-ship review Pre-ship review Kelley Labor Hours Labor - Task SS A - Analogy $64 $66 35.00% 53.00% Off Ice C3 20.0% $1,079.43 $373.92 40 40 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,558 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,613 $ 915 $ 1,870 $ 5,397 $ 706 $ 374 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,397.15
628 1.4.4.2.4.4 1.4 1.4.4 UW WIPAC Shipping to PTH (ComSur RDD 9/15/24, ROS 12/1/24) Shipping to PTH Kelley Labor Hours Labor - Task SS A - Analogy $64 $66 35.00% 53.00% Off Ice C2 12.5% $404.79 $140.22 8 16 24 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 512 $ 1,023 $ - 0 $ - 0 $ - 0 $ 1,568 $ 549 $ 1,122 $ 3,238 $ 265 $ 140 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,238.29
629 1.4.4.2.4.4 1.4 1.4.4 UW WIPAC Shipping to PTH (ComSur RDD 9/15/24, ROS 12/1/24) Shipping costs M & S M & S A - Analogy $1 0.00% 53.00% Off Ice C4 35.0% $273.51 $94.74 500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 500 $ - 0 $ - 0 $ - 0 $ 511 $ - 0 $ 271 $ 781 $ 179 $ 95 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $781.45
630 1.4.4.2.5 1.4 1.4.4 UW WIPAC Power systems support Power systems miscellaneous supplies M & S M & S F - Parametric $1 0.00% 53.00% Off Ice C1 9.0% $253.04 $87.66 125 125 125 125 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 511 $ - 0 $ 271 $ 781 $ 46 $ 24 125 125 125 125 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 522 $ - 0 $ 277 $ 798 $ 47 $ 25 125 125 125 125 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 533 $ - 0 $ 282 $ 815 $ 48 $ 25 125 125 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 272 $ - 0 $ 144 $ 416 $ 24 $ 13 $2,811.58
631 1.4.4.3.2 1.4 1.4.4 MSU PQ, ECW, Deployment Travel Costs FS2 Electronics SMEs (Headcount 2) Electronics SME FS2 PQ costs (slot 1) M & S M & S C - Engineering Buildup $1 0.00% 55.00% On Ice C2 12.5% $141.52 $50.22 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 350 350 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 350 $ 350 $ - 0 $ - 0 $ 730 $ - 0 $ 402 $ 1,132 $ 91 $ 50 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,132.16
632 1.4.4.3.2 1.4 1.4.4 MSU PQ, ECW, Deployment Travel Costs FS2 Electronics SMEs (Headcount 2) Electronics SME FS2 ECW costs (slot 1) M & S M & S C - Engineering Buildup $1 0.00% 55.00% On Ice C2 12.5% $50.54 $17.93 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 125 125 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 125 $ 125 $ 261 $ - 0 $ 143 $ 404 $ 33 $ 18 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $404.34
633 1.4.4.3.2 1.4 1.4.4 MSU PQ, ECW, Deployment Travel Costs FS2 Electronics SMEs (Headcount 2) Electronics SME FS2 Deployment travel (slot 1) Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% On Ice C1 9.0% $267.65 $94.97 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1080 720 0 $ - 0 $ 1,080 $ - 0 $ - 0 $ 720 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,919 $ - 0 $ 1,055 $ 2,974 $ 173 $ 95 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,973.85
634 1.4.4.3.2 1.4 1.4.4 MSU PQ, ECW, Deployment Travel Costs FS2 Electronics SMEs (Headcount 2) Electronics SME FS2 PQ costs (slot 2) M & S M & S C - Engineering Buildup $1 0.00% 55.00% On Ice C2 12.5% $141.52 $50.22 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 350 350 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 350 $ 350 $ - 0 $ - 0 $ 730 $ - 0 $ 402 $ 1,132 $ 91 $ 50 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,132.16
635 1.4.4.3.2 1.4 1.4.4 MSU PQ, ECW, Deployment Travel Costs FS2 Electronics SMEs (Headcount 2) Electronics SME FS2 ECW costs (slot 2) M & S M & S C - Engineering Buildup $1 0.00% 55.00% On Ice C2 12.5% $50.54 $17.93 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 125 125 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 125 $ 125 $ 261 $ - 0 $ 143 $ 404 $ 33 $ 18 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $404.34
636 1.4.4.3.2 1.4 1.4.4 MSU PQ, ECW, Deployment Travel Costs FS2 Electronics SMEs (Headcount 2) Electronics SME FS2 Deployment travel (slot 2) Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% On Ice C1 9.0% $267.65 $94.97 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1080 720 0 $ - 0 $ 1,080 $ - 0 $ - 0 $ 720 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,919 $ - 0 $ 1,055 $ 2,974 $ 173 $ 95 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,973.85
637 1.4.4.3.3 1.4 1.4.4 MSU Electronics SME support for FS2 activities (slot 1) Electronics SME support for FS2 activities Halliday Labor Hours Labor - LoE PO D - Expert Opinion $31 $31 31.00% 55.00% On Ice C1 9.0% $905.76 $321.40 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 150 150 $ - 0 $ - 0 $ - 0 $ 4,650 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,956 $ 1,536 $ 3,571 $ 10,064 $ 584 $ 321 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $10,064.01
638 1.4.4.3.8 1.4 1.4.4 UW WIPAC Electronics SME support for FS3 activities (slot 1) Electronics SME support for FS3 activities (slot 1) Kelley Labor Hours Labor - LoE SS D - Expert Opinion $64 $66 35.00% 53.00% On Ice C1 9.0% $1,941.57 $672.57 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 75 75 150 $ - 0 $ 4,796 $ 4,796 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,444 $ 3,656 $ 7,473 $ 21,573 $ 1,269 $ 673 $21,573.00
639 1.4.4.3.5 1.4 1.4.4 MSU Off-ice training Electronics SMEs (FS3) Off-ice safety training FS3 Electronics SMEs Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% On Ice C1 9.0% $267.65 $94.97 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ 1,919 $ - 0 $ 1,055 $ 2,974 $ 173 $ 95 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,973.85
640 1.4.4.3.7 1.4 1.4.4 UW WIPAC PQ, ECW, Deployment Travel Costs FS3 Electronics SMEs (Headcount 2) Electronics SME FS3 PQ costs (slot 1) M & S M & S C - Engineering Buildup $1 0.00% 53.00% On Ice C2 12.5% $142.70 $49.43 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 350 350 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 350 $ 350 $ - 0 $ - 0 $ 746 $ - 0 $ 395 $ 1,142 $ 93 $ 49 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,141.58
641 1.4.4.3.7 1.4 1.4.4 UW WIPAC PQ, ECW, Deployment Travel Costs FS3 Electronics SMEs (Headcount 2) Electronics SME FS3 ECW costs (slot 1) M & S M & S C - Engineering Buildup $1 0.00% 53.00% On Ice C2 12.5% $50.96 $17.65 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 125 125 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 125 $ 125 $ 266 $ - 0 $ 141 $ 408 $ 33 $ 18 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $407.71
642 1.4.4.3.7 1.4 1.4.4 UW WIPAC PQ, ECW, Deployment Travel Costs FS3 Electronics SMEs (Headcount 2) Electronics SME FS3 Deployment travel (slot 1) Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% On Ice C1 9.0% $269.87 $93.49 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1080 720 0 $ - 0 $ 1,080 $ - 0 $ - 0 $ 720 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,960 $ - 0 $ 1,039 $ 2,999 $ 176 $ 93 $2,998.59
643 1.4.4.3.7 1.4 1.4.4 MSU PQ, ECW, Deployment Travel Costs FS3 Electronics SMEs (Headcount 2) Electronics SME FS3 PQ costs (slot 2) M & S M & S C - Engineering Buildup $1 0.00% 55.00% On Ice C2 12.5% $144.56 $51.30 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 350 350 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 350 $ 350 $ - 0 $ - 0 $ 746 $ - 0 $ 410 $ 1,156 $ 93 $ 51 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,156.50
644 1.4.4.3.7 1.4 1.4.4 MSU PQ, ECW, Deployment Travel Costs FS3 Electronics SMEs (Headcount 2) Electronics SME FS3 ECW costs (slot 2) M & S M & S C - Engineering Buildup $1 0.00% 55.00% On Ice C2 12.5% $51.63 $18.32 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 125 125 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 125 $ 125 $ 266 $ - 0 $ 147 $ 413 $ 33 $ 18 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $413.03
645 1.4.4.3.7 1.4 1.4.4 MSU PQ, ECW, Deployment Travel Costs FS3 Electronics SMEs (Headcount 2) Electronics SME FS3 Deployment travel (slot 2) Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% On Ice C1 9.0% $273.40 $97.01 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1080 720 0 $ - 0 $ 1,080 $ - 0 $ - 0 $ 720 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,960 $ - 0 $ 1,078 $ 3,038 $ 176 $ 97 $3,037.79
646 1.4.6 1.4 1.4.6 MSU CPT Management (PY4 onward) CPT Management - Ty DeYoung DeYoung Labor Hours Labor - LoE KE E - Extrapolation from Actuals $97 $97 8.00% 55.00% Off Ice C1 9.0% $10,294.75 $3,652.98 37 75 75 38 225 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,589 $ 7,275 $ 7,275 $ 3,686 $ - 0 $ 22,294 $ 1,784 $ 13,243 $ 37,321 $ 2,167 $ 1,192 37 75 75 38 225 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,589 $ 7,275 $ 7,275 $ 3,686 $ - 0 $ 22,774 $ 1,822 $ 13,527 $ 38,123 $ 2,214 $ 1,217 37 75 75 38 225 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,589 $ 7,275 $ 7,275 $ 3,686 $ - 0 $ 23,263 $ 1,861 $ 13,818 $ 38,943 $ 2,261 $ 1,244 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $114,386.09
647 1.4.6 1.4 1.4.6 MSU CPT Management (PY4 onward) CPT Management miscellaneous Supplies M & S M & S F - Parametric $1 0.00% 55.00% Off Ice C1 9.0% $256.35 $90.96 125 125 125 125 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 511 $ - 0 $ 281 $ 792 $ 46 $ 25 125 125 125 125 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 522 $ - 0 $ 287 $ 809 $ 47 $ 26 125 125 125 125 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ 533 $ - 0 $ 293 $ 826 $ 48 $ 26 125 125 0 $ 125 $ - 0 $ - 0 $ 125 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 272 $ - 0 $ 150 $ 422 $ 24 $ 13 $2,848.33
648 1.4.6 1.4 1.4.6 MSU CPT Management (PY4 onward) Reviews and Project Planning Meetings Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 55.00% Off Ice C1 9.0% $1,845.72 $654.93 1800 1800 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,677 $ - 0 $ 2,023 $ 5,700 $ 331 $ 182 1800 1800 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,756 $ - 0 $ 2,066 $ 5,823 $ 338 $ 186 1800 1800 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,837 $ - 0 $ 2,110 $ 5,948 $ 345 $ 190 1800 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,960 $ - 0 $ 1,078 $ 3,038 $ 176 $ 97 $20,507.98
649 1.5.2.2.2.0 1.5 1.5.2 UW WIPAC Pencil Beam Engineering Overall coordination for Pencil Beam Wendt Labor Hours Labor - LoE SS D - Expert Opinion $65 $66 35.00% 53.00% C1 9.0% $10,755.27 $3,725.68 37.5 37.5 37.5 37.5 37.5 37.5 37.5 37.5 37.5 37.5 37.5 37.5 450 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 29,879 $ 10,458 $ 21,378 $ 61,715 $ 3,630 $ 1,924 37.5 37.5 37.5 37.5 37.5 37.5 37.5 37.5 37.5 37.5 37.5 412.5 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ 2,438 $ - 0 $ 27,978 $ 9,792 $ 20,018 $ 57,788 $ 3,399 $ 1,802 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $119,503.03
650 1.5.3.1.1 1.5 1.5.3 UA Simulation Studies Simulation Studies Labor Hours Labor - Task PO D - Expert Opinion $28 $35 17.38% 49.00% Off Ice C1 9.0% $6,297.56 $2,071.01 zeroed postdoc, needed later years when we have schedule approved 0 0 0 0 0 0 0 0 0 0 0 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 0 0 0 0 0 75 75 75 75 75 75 450 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 13,148 $ 2,285 $ 7,562 $ 22,995 $ 1,389 $ 681 75 75 75 75 75 75 75 75 75 75 75 75 900 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 26,861 $ 4,668 $ 15,449 $ 46,978 $ 2,838 $ 1,390 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $69,972.86
651 1.5.3.2.4 1.5 1.5.3 UA Create Database Structure for Timing Calibration Data Create Database Structure for Timing Calibration Data Labor Hours Labor - Task PO D - Expert Opinion $28 $35 17.38% 49.00% Off Ice C1 9.0% $7,377.29 $2,426.09 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 75 75 75 75 75 75 450 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 13,148 $ 2,285 $ 7,562 $ 22,995 $ 1,389 $ 681 75 75 75 75 75 75 75 75 75 75 75 75 900 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 26,861 $ 4,668 $ 15,449 $ 46,978 $ 2,838 $ 1,390 75 75 75 225 $ 2,100 $ 2,100 $ 2,100 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,860 $ 1,192 $ 3,945 $ 11,997 $ 725 $ 355 $81,969.91
652 1.5.3.2.5 1.5 1.5.3 UA Analyze Timing Calibration Data from Deployed Modules Analyze Timing Calibration Data from Deployed Modules Labor Hours Labor - Task PO D - Expert Opinion $28 $35 17.38% 49.00% Off Ice C1 9.0% $1,079.73 $355.08 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 75 75 75 225 $ - 0 $ - 0 $ - 0 $ 2,100 $ 2,100 $ 2,100 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,860 $ 1,192 $ 3,945 $ 11,997 $ 725 $ 355 $11,997.05
653 1.5.3.3.2 1.5 1.5.3 UA Create Database Structure for Geometry Calibration Data Create Database Structure for Geometry Calibration Data Labor Hours Labor - Task PO D - Expert Opinion $28 $35 17.38% 49.00% Off Ice C1 9.0% $7,377.29 $2,426.09 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 75 75 75 75 75 75 450 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 13,148 $ 2,285 $ 7,562 $ 22,995 $ 1,389 $ 681 75 75 75 75 75 75 75 75 75 75 75 75 900 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 26,861 $ 4,668 $ 15,449 $ 46,978 $ 2,838 $ 1,390 75 75 75 225 $ 2,100 $ 2,100 $ 2,100 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,860 $ 1,192 $ 3,945 $ 11,997 $ 725 $ 355 $81,969.91
654 1.5.3.3.3 1.5 1.5.3 UA Analyze Geometry Calibration Data from Deployed Modules Analyze Geometry Calibration Data from Deployed Modules Labor Hours Labor - Task PO D - Expert Opinion $28 $35 17.38% 49.00% Off Ice C1 9.0% $1,079.73 $355.08 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 75 75 75 225 $ - 0 $ - 0 $ - 0 $ 2,100 $ 2,100 $ 2,100 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,860 $ 1,192 $ 3,945 $ 11,997 $ 725 $ 355 $11,997.05
655 1.5.3.4.2 1.5 1.5.3 UA Software Development Software Development Labor Hours Labor - Task PO D - Expert Opinion $28 $35 17.38% 49.00% Off Ice C1 9.0% $8,457.03 $2,781.17 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 75 75 75 75 75 75 450 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 13,148 $ 2,285 $ 7,562 $ 22,995 $ 1,389 $ 681 75 75 75 75 75 75 75 75 75 75 75 75 900 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 2,100 $ 26,861 $ 4,668 $ 15,449 $ 46,978 $ 2,838 $ 1,390 150 150 150 450 $ 4,200 $ 4,200 $ 4,200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,719 $ 2,384 $ 7,891 $ 23,994 $ 1,449 $ 710 $93,966.95
656 1.5.3.4.3 1.5 1.5.3 UA Execution of Array Calibration Execution Labor Hours Labor - Task PO D - Expert Opinion $28 $35 17.38% 49.00% Off Ice C1 9.0% $2,159.47 $710.16 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 150 150 150 450 $ - 0 $ - 0 $ - 0 $ 4,200 $ 4,200 $ 4,200 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,719 $ 2,384 $ 7,891 $ 23,994 $ 1,449 $ 710 $23,994.10
657 1.5.3.5.1 1.5 1.5.3 UW WIPAC Testing of dust logger and IDP winch Dust logger shipping UCB to UW/PSL M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C1 9.0% $143.68 $49.77 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,000 $ - 0 $ 1,043 $ - 0 $ 553 $ 1,596 $ 94 $ 50 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,596.50
658 1.5.3.5.1 1.5 1.5.3 UW PSL Testing of dust logger and IDP winch PSL Engineering support for summer 2024 testing Labor Hours Labor - Task TE D - Expert Opinion $77 $77 0.00% 0.00% Off Ice C1 9.0% $347.10 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 48 48 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,696 $ - 0 $ 3,857 $ - 0 $ - 0 $ 3,857 $ 347 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,856.64
659 1.5.3.5.1 1.5 1.5.3 UW WIPAC Testing of dust logger and IDP winch Research Scientist to test dust logger Tosi Labor Hours Labor - Task SS D - Expert Opinion $47 $66 35.00% 53.00% Off Ice C1 9.0% $1,465.83 $507.77 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 160 160 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,557 $ - 0 $ 7,885 $ 2,760 $ 5,642 $ 16,287 $ 958 $ 508 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $16,286.95
660 1.5.3.5.1 1.5 1.5.3 UW WIPAC Testing of dust logger and IDP winch Travel to test dust logger Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $258.63 $89.59 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ 1,878 $ - 0 $ 995 $ 2,874 $ 169 $ 90 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,873.70
661 1.5.3.5.3 1.5 1.5.3 UW WIPAC Delivery of logger and winch to PTH Shipping of logger and winch to PTH M & S M & S D - Expert Opinion $1 0.00% 53.00% Off Ice C1 9.0% $587.10 $203.37 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 4000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,000 $ 4,264 $ - 0 $ 2,260 $ 6,523 $ 384 $ 203 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $6,523.29
662 1.5.4.1 1.5 1.5.4 UA Calibration management Calibration Management Williams Labor Hours Labor - LoE KE D - Expert Opinion $73 $116 32.00% 49.00% Off Ice C1 9.0% $3,236.53 $1,064.36 0 0 0 0 0 0 0 0 0 80 0 0 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,840 $ - 0 $ - 0 $ 5,966 $ 1,909 $ 3,859 $ 11,733 $ 709 $ 347 0 0 0 0 0 0 0 0 0 80 0 0 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,840 $ - 0 $ - 0 $ 6,094 $ 1,950 $ 3,941 $ 11,985 $ 724 $ 355 0 0 0 0 0 0 0 0 0 80 0 0 80 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,840 $ - 0 $ - 0 $ 6,225 $ 1,992 $ 4,026 $ 12,243 $ 740 $ 362 0 0 0 0 0 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $35,961.40
663 1.5.4.1 1.5 1.5.4 UA Calibration management Miscellaneous supplies for calibration and outreach activities M & S M & S D - Expert Opinion $1 0.00% 49.00% Off Ice C1 9.0% $410.95 $135.14 250 250 250 250 250 250 250 250 250 250 250 250 0 $ 250 $ 250 $ 250 $ 250 $ 250 $ 250 $ 250 $ 250 $ 250 $ 250 $ 250 $ 250 $ 3,065 $ - 0 $ 1,502 $ 4,566 $ 276 $ 135 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $4,566.11
664 1.5.4.2 1.5 1.5.4 UA Travel Travel to reviews and working meetings - Domestic Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 49.00% Off Ice C1 9.0% $1,774.27 $583.49 1800 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ 3,677 $ - 0 $ 1,802 $ 5,479 $ 331 $ 162 1800 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ 3,756 $ - 0 $ 1,841 $ 5,597 $ 338 $ 166 1800 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ 3,837 $ - 0 $ 1,880 $ 5,717 $ 345 $ 169 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,960 $ - 0 $ 960 $ 2,920 $ 176 $ 86 $19,714.13
665 1.5.4.2 1.5 1.5.4 UA Travel Travel to reviews and working meetings - International Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 49.00% Off Ice C1 9.0% $2,687.03 $883.65 3200 3200 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,200 $ - 0 $ - 0 $ 3,200 $ - 0 $ 6,538 $ - 0 $ 3,203 $ 9,741 $ 588 $ 288 3200 3200 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,200 $ - 0 $ - 0 $ 3,200 $ - 0 $ 6,678 $ - 0 $ 3,272 $ 9,950 $ 601 $ 295 3200 3200 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,200 $ - 0 $ - 0 $ 3,200 $ - 0 $ 6,822 $ - 0 $ 3,343 $ 10,164 $ 614 $ 301 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $29,855.87
666 1.6.0 1.6 1.6.0 UMD L2 Task Management L2 Task management - Erik Blaufuss Blaufuss Labor Hours Labor - LoE SS E - Extrapolation from Actuals $79 $66 29.00% 54.50% Off Ice C1 9.0% $13,749.30 $4,850.08 20% effort for management - EKB 22 22 22 22 22 22 22 22 22 22 22 22 264 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 21,304 $ 6,178 $ 14,978 $ 42,461 $ 2,473 $ 1,348 22 22 22 22 22 22 22 22 22 22 22 22 264 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 21,762 $ 6,311 $ 15,300 $ 43,374 $ 2,527 $ 1,377 22 22 22 22 22 22 22 22 22 22 22 22 264 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 22,230 $ 6,447 $ 15,629 $ 44,306 $ 2,581 $ 1,407 22 22 22 22 22 22 132 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ 1,738 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 11,354 $ 3,293 $ 7,983 $ 22,629 $ 1,318 $ 718 $152,769.95
667 1.6.0 1.6 1.6.0 UMD L2 Task Management Travel to annual project reviews Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 54.50% Off Ice C1 9.0% $1,300.46 $458.74 1800 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ 3,677 $ - 0 $ 2,004 $ 5,682 $ 331 $ 180 1800 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ 3,756 $ - 0 $ 2,047 $ 5,804 $ 338 $ 184 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,919 $ - 0 $ 1,046 $ 2,964 $ 173 $ 94 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $14,449.58
668 1.6.0 1.6 1.6.0 UMD L2 Task Management Travel to project planning workshops and meetings Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 54.50% Off Ice C1 9.0% $255.67 $90.19 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,839 $ - 0 $ 1,002 $ 2,841 $ 165 $ 90 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,840.79
669 1.6.0 1.6 1.6.0 UW WIPAC L2 Task Management PQ process - all L3 areas M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% On Ice C1 9.0% $275.94 $95.59 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 950 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 950 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 991 $ - 0 $ 525 $ 1,517 $ 89 $ 47 950 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 950 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,013 $ - 0 $ 537 $ 1,549 $ 91 $ 48 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $3,065.95
670 1.6.0 1.6 1.6.0 UW WIPAC L2 Task Management Deployment to Pole - all L3 areas Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% On Ice C1 9.0% $522.83 $181.11 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ 1,878 $ - 0 $ 995 $ 2,874 $ 169 $ 90 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ 1,919 $ - 0 $ 1,017 $ 2,935 $ 173 $ 92 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,809.17
671 1.6.0 1.6 1.6.0 UMD L2 Task Management PQ process - all L3 areas M & S M & S E - Extrapolation from Actuals $1 0.00% 54.50% On Ice C1 9.0% $140.80 $49.67 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 950 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 950 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,013 $ - 0 $ 552 $ 1,564 $ 91 $ 50 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,564.47
672 1.6.0 1.6 1.6.0 UMD L2 Task Management Deployment to Pole - all L3 areas Foreign Travel Travel E - Extrapolation from Actuals $1 0.00% 54.50% On Ice C1 9.0% $266.78 $94.11 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ 1,919 $ - 0 $ 1,046 $ 2,964 $ 173 $ 94 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,964.26
673 1.6.1.0 1.6 1.6.1 UW WIPAC L3 Task Management L3 Task Management - Jim Braun Braun Labor Hours Labor Hours SC E - Extrapolation from Actuals $54 $52 35.00% 53.00% Off Ice C1 9.0% $3,541.78 $1,226.89 8 8 8 8 8 8 8 8 8 8 8 8 96 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 5,295 $ 1,853 $ 3,789 $ 10,938 $ 643 $ 341 8 8 8 8 8 8 8 8 8 8 8 8 96 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 5,409 $ 1,893 $ 3,870 $ 11,173 $ 657 $ 348 8 8 8 8 8 8 8 8 8 8 8 8 96 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ 5,526 $ 1,934 $ 3,954 $ 11,413 $ 671 $ 356 8 8 8 8 8 8 48 $ 432 $ 432 $ 432 $ 432 $ 432 $ 432 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,822 $ 988 $ 2,019 $ 5,829 $ 343 $ 182 $39,353.10
674 1.6.1.0 1.6 1.6.1 UW WIPAC L3 Task Management Travel to project planning workshops and meetings Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $776.01 $268.82 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,839 $ - 0 $ 975 $ 2,813 $ 165 $ 88 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,878 $ - 0 $ 995 $ 2,874 $ 169 $ 90 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,919 $ - 0 $ 1,017 $ 2,935 $ 173 $ 92 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $8,622.39
675 1.6.1.0 1.6 1.6.1 UW WIPAC L3 Task Management Travel to NTS for new OM integration work Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $253.19 $87.71 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,839 $ - 0 $ 975 $ 2,813 $ 165 $ 88 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,813.21
676 1.6.1.0 1.6 1.6.1 UW WIPAC L3 Task Management Travel to NTS for new calibration device integration work Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $522.83 $181.11 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,878 $ - 0 $ 995 $ 2,874 $ 169 $ 90 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,919 $ - 0 $ 1,017 $ 2,935 $ 173 $ 92 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,809.17
677 1.6.1.0 1.6 1.6.1 UW WIPAC L3 Task Management Travel to NTS for OM integration work Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $522.83 $181.11 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,878 $ - 0 $ 995 $ 2,874 $ 169 $ 90 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,919 $ - 0 $ 1,017 $ 2,935 $ 173 $ 92 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $5,809.17
678 1.6.1.4.3.8 1.6 1.6.1 UW WIPAC Support OM testing app thru FAT testing cycles Support OM testing app thru FAT testing cycles Weber Labor Hours Labor - Task SE D - Expert Opinion $63 $55 35.00% 53.00% Off Ice C1 9.0% $6,468.32 $2,240.66 45 45 45 45 45 45 45 45 45 45 45 45 540 $ 2,839 $ 2,839 $ 2,839 $ 2,839 $ 2,839 $ 2,839 $ 2,839 $ 2,839 $ 2,839 $ 2,839 $ 2,839 $ 2,839 $ 34,796 $ 12,178 $ 24,896 $ 71,870 $ 4,228 $ 2,241 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $71,870.23
679 1.6.1.4.3.9.1 1.6 1.6.1 UW WIPAC Extend OM testing app to include support for MMB based special devices Extend OM testing app to include support for MMB based special devices Weber Labor Hours Labor - Task SE D - Expert Opinion $63 $55 35.00% 53.00% Off Ice C4 35.0% $20,496.32 $7,100.03 60 60 60 60 60 60 60 20 440 $ 3,785 $ 3,785 $ 3,785 $ 3,785 $ 3,785 $ 3,785 $ 3,785 $ 1,262 $ - 0 $ - 0 $ - 0 $ - 0 $ 28,352 $ 9,923 $ 20,286 $ 58,561 $ 13,396 $ 7,100 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $58,560.93
680 1.6.1.4.3.9.2 1.6 1.6.1 UW WIPAC Support OM testing app thru calibration device DVT and FAT testing Support OM testing app thru calibration device DVT and FAT testing Weber Labor Hours Labor - Task SE D - Expert Opinion $63 $55 35.00% 53.00% Off Ice C2 12.5% $12,305.70 $4,262.76 40 60 60 60 60 280 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,523 $ 3,785 $ 3,785 $ 3,785 $ 3,785 $ 18,042 $ 6,315 $ 12,909 $ 37,266 $ 3,045 $ 1,614 60 60 60 60 60 60 60 30 450 $ 3,785 $ 3,785 $ 3,785 $ 3,785 $ 3,785 $ 3,785 $ 3,785 $ 1,892 $ - 0 $ - 0 $ - 0 $ - 0 $ 29,620 $ 10,367 $ 21,193 $ 61,180 $ 4,998 $ 2,649 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $98,445.57
681 1.6.1.4.3.10 1.6 1.6.1 UW WIPAC Prototype and test SPAT testing software at NTS Prototype and test SPAT testing software at NTS Weber Labor Hours Labor - Task SE D - Expert Opinion $63 $55 35.00% 53.00% Off Ice C3 20.0% $6,525.82 $2,260.58 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 60 60 60 60 240 $ - 0 $ - 0 $ - 0 $ 3,785 $ 3,785 $ 3,785 $ 3,785 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 15,797 $ 5,529 $ 11,303 $ 32,629 $ 4,265 $ 2,261 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $32,629.08
682 1.6.1.4.3.11 1.6 1.6.1 UW WIPAC Prepare and ship SPAT toolset to Pole Prepare and ship SPAT toolset to Pole Weber Labor Hours Labor - Task SE D - Expert Opinion $63 $55 35.00% 53.00% Off Ice C2 12.5% $2,294.23 $794.73 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 45 45 45 135 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,839 $ 2,839 $ 2,839 $ - 0 $ - 0 $ 8,886 $ 3,110 $ 6,358 $ 18,354 $ 1,499 $ 795 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $18,353.86
683 1.6.1.4.3.11 1.6 1.6.1 UW WIPAC Prepare and ship SPAT toolset to Pole Prepare and ship SPAT toolset to Pole M & S M & S D - Expert Opinion $1 0.00% 53.00% C2 12.5% $1,496.72 $518.47 tools and computers for SPAT 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 7500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,500 $ - 0 $ - 0 $ - 0 $ 7,826 $ - 0 $ 4,148 $ 11,974 $ 978 $ 518 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $11,973.73
684 1.6.1.4.3.13 1.6 1.6.1 UW WIPAC SPAT testing preparation and execution at Pole FS2 SPAT testing preparation and execution at Pole FS2 Weber Labor Hours Labor - Task SE D - Expert Opinion $63 $55 35.00% 53.00% On Ice C2 12.5% $7,811.86 $2,706.07 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 150 150 150 450 $ - 0 $ - 0 $ 9,462 $ 9,462 $ 9,462 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 30,257 $ 10,590 $ 21,649 $ 62,495 $ 5,106 $ 2,706 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $62,494.89
685 1.6.1.4.3.15 1.6 1.6.1 UW WIPAC SPAT testing preparation and execution at Pole FS3 SPAT testing preparation and execution at Pole FS3 Weber Labor Hours Labor - Task SE D - Expert Opinion $63 $55 35.00% 53.00% On Ice C2 12.5% $7,979.82 $2,764.25 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 150 150 150 450 $ - 0 $ 9,462 $ 9,462 $ 9,462 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 30,907 $ 10,817 $ 22,114 $ 63,839 $ 5,216 $ 2,764 $63,838.53
686 1.6.1.4.5.4.3 1.6 1.6.1 UW WIPAC Extend xDOMapp to include support for calibration devices in operations Extend xDOMapp to include support for calibration devices in operations Weber Labor Hours Labor - Task SE D - Expert Opinion $63 $55 35.00% 53.00% Off Ice C4 35.0% $20,133.10 $6,974.21 45 45 90 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,839 $ 2,839 $ 5,799 $ 2,030 $ 4,149 $ 11,978 $ 2,740 $ 1,452 45 45 45 30 30 30 30 30 30 20 335 $ 2,839 $ 2,839 $ 2,839 $ 1,892 $ 1,892 $ 1,892 $ 1,892 $ 1,892 $ 1,892 $ 1,262 $ - 0 $ - 0 $ 22,050 $ 7,718 $ 15,777 $ 45,545 $ 10,419 $ 5,522 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $57,523.13
687 1.6.1.4.5.6 1.6 1.6.1 UW WIPAC Support full DAQ testing with xDOMapp at NTS/SPTS with Calibration devices Support full DAQ testing with xDOMapp at NTS/SPTS with Calibration devices Weber Labor Hours Labor - Task SE D - Expert Opinion $63 $55 35.00% 53.00% Off Ice C2 12.5% $3,062.21 $1,060.76 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 20 45 45 110 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,262 $ 2,839 $ 2,839 $ 7,396 $ 2,589 $ 5,292 $ 15,277 $ 1,248 $ 661 45 20 65 $ 2,839 $ - 0 $ - 0 $ - 0 $ 1,262 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,464 $ 1,563 $ 3,194 $ 9,221 $ 753 $ 399 $24,497.65
688 1.6.1.4.5.8 1.6 1.6.1 UW WIPAC Support xDOMapp through SPAT testing and deployment Support xDOMapp through SPAT testing and deployment Weber Labor Hours Labor - Task SE D - Expert Opinion $63 $55 35.00% 53.00% Off Ice C2 12.5% $6,271.88 $2,172.61 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 30 30 30 30 30 30 30 30 30 30 300 $ - 0 $ - 0 $ 1,892 $ 1,892 $ 1,892 $ 1,892 $ 1,892 $ 1,892 $ 1,892 $ 1,892 $ 1,892 $ 1,892 $ 20,171 $ 7,060 $ 14,432 $ 41,663 $ 3,404 $ 1,804 30 30 60 $ 1,892 $ - 0 $ - 0 $ - 0 $ 1,892 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,121 $ 1,442 $ 2,949 $ 8,512 $ 695 $ 369 $50,175.06
689 1.6.1.4.6.5 1.6 1.6.1 UW WIPAC Support MMB software for calibration device interface development Support MMB-xDOMapp software for calibration devices Weber Labor Hours Labor - Task SE D - Expert Opinion $63 $55 35.00% 53.00% Off Ice C2 12.5% $13,733.89 $4,757.49 45 45 45 45 180 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,839 $ 2,839 $ 2,839 $ 2,839 $ - 0 $ - 0 $ 11,599 $ 4,059 $ 8,299 $ 23,957 $ 1,957 $ 1,037 45 45 45 45 90 90 90 90 540 $ 2,839 $ 2,839 $ 2,839 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,839 $ 5,677 $ 5,677 $ 5,677 $ 5,677 $ 35,544 $ 12,440 $ 25,431 $ 73,415 $ 5,998 $ 3,179 45 45 90 $ 2,839 $ 2,839 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,051 $ 2,118 $ 4,330 $ 12,499 $ 1,021 $ 541 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $109,871.16
690 1.6.1.6.6 1.6 1.6.1 PSU Firmware device maintenance and support for all OM devices during DAQ Development Firmware device maintenance and support for all OM devices during DAQ Development Anderson Labor Hours Labor - Task SE D - Expert Opinion $64 $64 40.00% 58.05% Off Ice C3 20.0% $12,423.17 $4,562.89 15 15 15 15 15 15 15 15 15 15 15 15 180 $ 960 $ 960 $ 960 $ 960 $ 960 $ 960 $ 960 $ 960 $ 960 $ 960 $ 960 $ 960 $ 11,768 $ 4,707 $ 9,564 $ 26,038 $ 3,295 $ 1,913 8 8 8 8 8 8 8 8 8 8 8 8 96 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 6,411 $ 2,564 $ 5,210 $ 14,186 $ 1,795 $ 1,042 8 8 8 8 8 8 8 8 8 8 8 8 96 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ 6,549 $ 2,620 $ 5,322 $ 14,491 $ 1,834 $ 1,064 8 8 8 8 8 8 48 $ 512 $ 512 $ 512 $ 512 $ 512 $ 512 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,345 $ 1,338 $ 2,718 $ 7,401 $ 937 $ 544 $62,115.84
691 1.6.4.0 1.6 1.6.4 UW WIPAC L3 Task Management L3 Task management - Ralf Auer Auer Labor Hours Labor - LoE EN E - Extrapolation from Actuals $60 $49 35.00% 53.00% Off Ice C1 9.0% $1,438.91 $498.45 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 8 8 8 8 8 8 8 72 $ - 0 $ - 0 $ - 0 $ 480 $ 480 $ 480 $ 480 $ 480 $ 480 $ 480 $ 480 $ 480 $ 4,605 $ 1,612 $ 3,295 $ 9,511 $ 559 $ 297 8 8 8 8 8 8 48 $ 480 $ 480 $ 480 $ 480 $ 480 $ 480 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,136 $ 1,098 $ 2,244 $ 6,477 $ 381 $ 202 $15,987.91
692 1.6.4.0 1.6 1.6.4 UW WIPAC L3 Task Management Miscellaneous supplies M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $142.17 $49.25 500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 511 $ - 0 $ 271 $ 781 $ 46 $ 24 500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 522 $ - 0 $ 277 $ 798 $ 47 $ 25 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $1,579.70
693 1.6.4.0 1.6 1.6.4 UW WIPAC L3 Task Management Trip to MSU to install NTS equipment Domestic Travel Travel E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $264.19 $91.52 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 1800 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,919 $ - 0 $ 1,017 $ 2,935 $ 173 $ 92 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,935.48
694 1.6.4.0 1.6 1.6.4 UW WIPAC L3 Task Management NTS computing system purchase CapEx CapEx E - Extrapolation from Actuals $1 0.00% 0.00% Off Ice C3 20.0% $532.95 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 2500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,665 $ - 0 $ - 0 $ 2,665 $ 533 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $2,664.74
695 1.6.4.0 1.6 1.6.4 UW WIPAC L3 Task Management Miscellaneous supplies M & S M & S E - Extrapolation from Actuals $1 0.00% 53.00% Off Ice C1 9.0% $73.39 $25.42 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 500 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 500 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 533 $ - 0 $ 282 $ 815 $ 48 $ 25 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $815.41
696 1.6.4.0 1.6 1.6.4 UW WIPAC L3 Task Management SPS computing system additions CapEx CapEx E - Extrapolation from Actuals $1 0.00% 0.00% Off Ice C3 20.0% $2,558.15 $0.00 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 12000 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 12,000 $ - 0 $ - 0 $ - 0 $ 12,791 $ - 0 $ - 0 $ 12,791 $ 2,558 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $12,790.76
697 1.6.5.0 1.6 1.6.5 UMD L3 Task Management L3 Task Management Labor Hours Labor - Task SC E - Extrapolation from Actuals $52 $52 29.00% 54.50% Off Ice C1 9.0% $1,203.32 $424.47 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 8 8 8 8 8 8 8 8 8 72 $ - 0 $ - 0 $ - 0 $ 416 $ 416 $ 416 $ 416 $ 416 $ 416 $ 416 $ 416 $ 416 $ 3,991 $ 1,157 $ 2,806 $ 7,954 $ 463 $ 253 8 8 8 8 8 8 48 $ 416 $ 416 $ 416 $ 416 $ 416 $ 416 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,718 $ 788 $ 1,911 $ 5,416 $ 316 $ 172 $13,370.17
698                                                                                                                                                                                                                                                                                                        
699                                                                                                                                                                                                                                                                                

Back to top


  A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH AI AJ AK AL AM AN
1 Project Year PY5   1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 1.2.6 1.2.7 1.2.8 1.2.9 1.2.10 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.4.1 1.4.2 1.4.3 1.4.4 1.4.5 1.4.6 1.5.1 1.5.2 1.5.3 1.5.4 1.6.0 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5
2 Institution UW   1.1 Project Office 1.2 Drilling and Installation 1.3 Deep Ice Sensor Modules 1.4 Comm/Power/Timing 1.5 Characterization and Calibration System 1.6 IceCube Data Systems Integration
3       1.1.1 Project Management 1.1.2 Project Controls 1.1.3 Quality and Safety 1.1.4 Polar Operations 1.1.5 Project Engineering 1.2.1 Implementation Management & Systems Engineering 1.2.2 Thermal Plant - Off-ice 1.2.3 Tower Operations Site (TOS) - Off-ice 1.2.4 Computing and Control System - Off-ice 1.2.5 Power Generation & Distribution 1.2.6 Water Handling Systems - Off-ice 1.2.7 Support Equipment - Off-ice 1.2.8 Drill Field Seasons - Antarctica 1.2.9 Installation - Off-ice 1.2.10 Installation Field Seasons - Antarctica 1.3.1 mDOM 1.3.2 D-Egg 1.3.3 PDOM 1.3.4 Ice Comms Module 1.3.5 Special Devices 1.4.1 Downhole Cables 1.4.2 Surface Cables 1.4.3 FieldHub 1.4.4 CPT Central Infrastructure 1.4.5 Northern Test System 1.4.6 CPT Management (PY4 onward) 1.5.1 Module Calibration 1.5.2 Calibration Assemblies 1.5.3 Array Calibration 1.5.4 Calibration Management and Organization 1.6.0 L2 Task Management 1.6.1 Online Systems Software 1.6.2 Offline Systems 1.6.3 Simulation Software 1.6.4 Computing Infrastructure 1.6.5 Upgrade String Commissioning
4 Expense Description Total Yr 5    
5 Senior Personnel  
6 Title Last Name Cal. Mo.
7 Principal Investigator Hanson 0.96 $ 18,441 $ 18,441 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
8 Project Manager Feyzi 12.00 $ 178,869 $ 178,869 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
9 Project Director ODell 4.80 $ 82,521 $ 82,521 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
10   $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
11 Other Personnel $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
12 Financial Manager Mercier 4.80 $ 32,685 $ - 0 $ 32,685 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
13 Project Controls Analyst N/A 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
14 Quality and Safety Zernick 9.04 $ 84,065 $ - 0 $ - 0 $ 84,065 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
15 Technical Coordinator DuVernois 6.00 $ 67,361 $ - 0 $ - 0 $ - 0 $ - 0 $ 67,361 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
16 Project Engineer Sandstrom 6.00 $ 58,967 $ - 0 $ - 0 $ - 0 $ - 0 $ 58,967 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
17 Logistics Manager Tosi 7.20 $ 52,105 $ - 0 $ - 0 $ - 0 $ 17,368 $ - 0 $ 34,737 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
18 Implementation Manager McEwen 12.00 $ 111,591 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 111,591 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
19 Engineer / Technician Wendt 3.87 $ 38,477 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 8,598 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 29,879 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
20 Engineer / Technician Weber 10.20 $ 98,587 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 98,587 $ - 0 $ - 0 $ - 0 $ - 0
21 Engineer Kelley 4.53 $ 44,421 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,713 $ - 0 $ 33,708 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
22 Engineer Braun 0.64 $ 5,295 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,295 $ - 0 $ - 0 $ - 0 $ - 0
23 Engineer Auer 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
24 Senior Scientist Senior Scientist 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
25 Scientist Scientist 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
26 Engineer S. Griffin 3.64 $ 26,214 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 26,214 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
27 Total Salaries and Wages
28       $ 899,599 $ 279,831 $ 32,685 $ 84,065 $ 17,368 $ 126,328 $ 146,327 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 8,598 $ 26,214 $ - 0 $ - 0 $ 10,713 $ - 0 $ 33,708 $ - 0 $ - 0 $ - 0 $ 29,879 $ - 0 $ - 0 $ - 0 $ 103,883 $ - 0 $ - 0 $ - 0 $ - 0
29 Fringe Benefits
30       $ 314,860 $ 97,941 $ 11,440 $ 29,423 $ 6,079 $ 44,215 $ 51,215 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,009 $ 9,175 $ - 0 $ - 0 $ 3,750 $ - 0 $ 11,798 $ - 0 $ - 0 $ - 0 $ 10,458 $ - 0 $ - 0 $ - 0 $ 36,359 $ - 0 $ - 0 $ - 0 $ - 0
31 Equipment
32 Descrip. Qty Unit Cost
33 Capital Equipment 1 1 $ 556,543 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 11,177 $ 24,571 $ 198,637 $ 23,356 $ 6,742 $ 25,027 $ - 0 $ 138,211 $ - 0 $ - 0 $ - 0 $ 93,105 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 35,718 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
34 Capitalized Labor 1 1 $ 1,262,830 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 403,934 $ 6,897 $ 35,720 $ 670,749 $ 12,217 $ 4,699 $ 40,603 $ 57,265 $ 7,048 $ - 0 $ - 0 $ - 0 $ 23,699 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
35      
36 Subtotal - Eqpt
37       $ 1,819,373 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 403,934 $ 18,074 $ 60,291 $ 869,385 $ 35,573 $ 11,441 $ 65,629 $ 57,265 $ 145,259 $ - 0 $ - 0 $ - 0 $ 116,803 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 35,718 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
38 Travel
39 Domestic   $ 52,709 $ 28,806 $ - 0 $ - 0 $ - 0 $ - 0 $ 12,871 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,839 $ 1,839 $ - 0 $ - 0 $ - 0 $ 1,839 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,839 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,677 $ - 0 $ - 0 $ - 0 $ - 0
40 Foreign   $ 42,086 $ 9,806 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 32,279 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
41 Subtotal - Travel
42       $ 94,795 $ 38,613 $ - 0 $ - 0 $ - 0 $ - 0 $ 12,871 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 34,118 $ 1,839 $ - 0 $ - 0 $ - 0 $ 1,839 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,839 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,677 $ - 0 $ - 0 $ - 0 $ - 0
43 Participant Support Costs
44 Descr # participants   $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
45 Subtotal - Part. Supp.
46       $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
47 Other Direct Costs
48 Materials and Supplies $ 120,452 $ 15,833 $ - 0 $ - 0 $ - 0 $ - 0 $ 29,564 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,108 $ 22,882 $ - 0 $ - 0 $ - 0 $ - 0 $ 12,769 $ - 0 $ - 0 $ - 0 $ 31,743 $ - 0 $ 2,043 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 511 $ - 0
49 Computers/Office     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
50 Software/licenses     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
51 Other categories     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
52 And other cats…     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
53 Subtotal - Materials and Supplies
54       $ 120,452 $ 15,833 $ - 0 $ - 0 $ - 0 $ - 0 $ 29,564 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,108 $ 22,882 $ - 0 $ - 0 $ - 0 $ - 0 $ 12,769 $ - 0 $ - 0 $ - 0 $ 31,743 $ - 0 $ 2,043 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 511 $ - 0
55 Publication Costs/Documentation/Dissemination
56
57 Consultant Services Description   $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
58 Software/Programming     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
59 Database consultant     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
60 PMCS Service PMCS Consulting   $ 334,896 $ - 0 $ 334,896 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
61 Etc.     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
62 Subtotal - Consultant/Prof Services
63       $ 334,896 $ - 0 $ 334,896 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
64 Computer Services     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
65 Subotal Computer Services
66       $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
67 Subawards
68 MSU $ 593,417 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 511,309 $ 38,296 $ - 0 $ - 0 $ - 0 $ 43,812 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
69 PSU $ 42,312 $ 16,274 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 26,038 $ - 0 $ - 0 $ - 0 $ - 0
70 UA $ 31,520 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 31,520 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
71 UMD $ 70,406 $ 19,422 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 50,983 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
72 Subtotal - Subawards
73       $ 737,655 $ 35,696 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 511,309 $ 38,296 $ - 0 $ - 0 $ - 0 $ 43,812 $ - 0 $ - 0 $ - 0 $ 31,520 $ 50,983 $ 26,038 $ - 0 $ - 0 $ - 0 $ - 0
74 Other - Contingency     $ 908,460 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
75 Leases     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
76 Maint/Repair     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
77 Shipping/Postage     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
78 Subtotal - Other
79       $ 908,460 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
80 Total - Direct Costs
81       $ 5,230,091 $ 467,914 $ 379,020 $ 113,488 $ 23,447 $ 170,543 $ 643,911 $ 18,074 $ 60,291 $ 869,385 $ 35,573 $ 11,441 $ 70,737 $ 114,265 $ 147,098 $ - 0 $ - 0 $ - 0 $ 143,019 $ 35,389 $ - 0 $ 511,309 $ 84,502 $ - 0 $ 85,105 $ - 0 $ 43,812 $ - 0 $ 40,336 $ - 0 $ 31,520 $ 50,983 $ 169,958 $ - 0 $ - 0 $ 511 $ - 0
82 Indirect Costs
83 Indirect $ 988,239 $ 229,075 $ 200,881 $ 60,149 $ 12,427 $ 90,388 $ 127,188 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,707 $ 30,210 $ 975 $ - 0 $ - 0 $ - 0 $ 13,894 $ 18,756 $ - 0 $ - 0 $ 24,489 $ - 0 $ 26,175 $ - 0 $ - 0 $ - 0 $ 21,378 $ - 0 $ - 0 $ - 0 $ 76,277 $ - 0 $ - 0 $ 271 $ - 0
84 Other - Contingency Indirect     $ 176,588 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
85 Subtotal - Indirect Costs     $ 1,164,828 $ 229,075 $ 200,881 $ 60,149 $ 12,427 $ 90,388 $ 127,188 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,707 $ 30,210 $ 975 $ - 0 $ - 0 $ - 0 $ 13,894 $ 18,756 $ - 0 $ - 0 $ 24,489 $ - 0 $ 26,175 $ - 0 $ - 0 $ - 0 $ 21,378 $ - 0 $ - 0 $ - 0 $ 76,277 $ - 0 $ - 0 $ 271 $ - 0
86       $ - 0
87 Total - Direct and Indirect
88       $ 6,394,918 $ 696,990 $ 579,901 $ 173,636 $ 35,874 $ 260,930 $ 771,099 $ 18,074 $ 60,291 $ 869,385 $ 35,573 $ 11,441 $ 73,444 $ 144,475 $ 148,073 $ - 0 $ - 0 $ - 0 $ 156,913 $ 54,144 $ - 0 $ 511,309 $ 108,992 $ - 0 $ 111,280 $ - 0 $ 43,812 $ - 0 $ 61,715 $ - 0 $ 31,520 $ 50,983 $ 246,235 $ - 0 $ - 0 $ 781 $ - 0

Back to top


  A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH AI AJ AK AL AM AN
1 Project Year PY6   1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 1.2.6 1.2.7 1.2.8 1.2.9 1.2.10 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.4.1 1.4.2 1.4.3 1.4.4 1.4.5 1.4.6 1.5.1 1.5.2 1.5.3 1.5.4 1.6.0 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5
2 Institution UW   1.1 Project Office 1.2 Drilling and Installation 1.3 Deep Ice Sensor Modules 1.4 Comm/Power/Timing 1.5 Characterization and Calibration System 1.6 IceCube Data Systems Integration
3       1.1.1 Project Management 1.1.2 Project Controls 1.1.3 Quality and Safety 1.1.4 Polar Operations 1.1.5 Project Engineering 1.2.1 Implementation Management & Systems Engineering 1.2.2 Thermal Plant - Off-ice 1.2.3 Tower Operations Site (TOS) - Off-ice 1.2.4 Computing and Control System - Off-ice 1.2.5 Power Generation & Distribution 1.2.6 Water Handling Systems - Off-ice 1.2.7 Support Equipment - Off-ice 1.2.8 Drill Field Seasons - Antarctica 1.2.9 Installation - Off-ice 1.2.10 Installation Field Seasons - Antarctica 1.3.1 mDOM 1.3.2 D-Egg 1.3.3 PDOM 1.3.4 Ice Comms Module 1.3.5 Special Devices 1.4.1 Downhole Cables 1.4.2 Surface Cables 1.4.3 FieldHub 1.4.4 CPT Central Infrastructure 1.4.5 Northern Test System 1.4.6 CPT Management (PY4 onward) 1.5.1 Module Calibration 1.5.2 Calibration Assemblies 1.5.3 Array Calibration 1.5.4 Calibration Management and Organization 1.6.0 L2 Task Management 1.6.1 Online Systems Software 1.6.2 Offline Systems 1.6.3 Simulation Software 1.6.4 Computing Infrastructure 1.6.5 Upgrade String Commissioning
4 Expense Description Total Yr 5    
5 Senior Personnel  
6 Title Last Name Cal. Mo.
7 Principal Investigator Hanson 0.96 $ 18,838 $ 18,838 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
8 Project Manager Feyzi 6.33 $ 96,433 $ 96,433 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
9 Project Director ODell 4.00 $ 70,246 $ 70,246 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
10   $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
11 Other Personnel $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
12 Financial Manager Mercier 4.80 $ 33,387 $ - 0 $ 33,387 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
13 Project Controls Analyst N/A 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
14 Quality and Safety Zernick 9.52 $ 85,557 $ - 0 $ - 0 $ 67,571 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 17,986 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
15 Technical Coordinator DuVernois 6.00 $ 68,809 $ - 0 $ - 0 $ - 0 $ - 0 $ 68,809 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
16 Project Engineer Sandstrom 6.00 $ 60,235 $ - 0 $ - 0 $ - 0 $ - 0 $ 60,235 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
17 Logistics Manager Tosi 7.07 $ 52,240 $ - 0 $ - 0 $ - 0 $ 8,871 $ - 0 $ 35,484 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,885 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
18 Implementation Manager McEwen 12.00 $ 113,990 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 113,990 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
19 Engineer / Technician Wendt 2.75 $ 27,978 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 27,978 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
20 Engineer / Technician Weber 11.33 $ 111,897 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 111,897 $ - 0 $ - 0 $ - 0 $ - 0
21 Engineer Kelley 2.72 $ 27,226 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,602 $ - 0 $ 25,624 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
22 Engineer Braun 0.64 $ 5,409 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,409 $ - 0 $ - 0 $ - 0 $ - 0
23 Engineer Auer 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
24 Senior Scientist Senior Scientist 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
25 Scientist Scientist 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
26 Engineer S. Griffin 4.08 $ 30,014 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 30,014 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
27 Total Salaries and Wages
28       $ 802,258 $ 185,516 $ 33,387 $ 67,571 $ 8,871 $ 129,044 $ 149,473 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 17,986 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 30,014 $ - 0 $ - 0 $ 1,602 $ - 0 $ 25,624 $ - 0 $ - 0 $ - 0 $ 27,978 $ 7,885 $ - 0 $ - 0 $ 117,306 $ - 0 $ - 0 $ - 0 $ - 0
29 Fringe Benefits
30       $ 280,790 $ 64,931 $ 11,686 $ 23,650 $ 3,105 $ 45,165 $ 52,316 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 6,295 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,505 $ - 0 $ - 0 $ 561 $ - 0 $ 8,968 $ - 0 $ - 0 $ - 0 $ 9,792 $ 2,760 $ - 0 $ - 0 $ 41,057 $ - 0 $ - 0 $ - 0 $ - 0
31 Equipment
32 Descrip. Qty Unit Cost
33 Capital Equipment 1 1 $ 266,990 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 38,277 $ 21,393 $ 18,626 $ 5,217 $ 33,303 $ 14,608 $ - 0 $ 126,173 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,391 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
34 Capitalized Labor 1 1 $ 1,224,134 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 308,988 $ 40,601 $ 21,454 $ 134,260 $ 14,408 $ 14,400 $ 21,307 $ 660,059 $ 4,800 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,857 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
35      
36 Subtotal - Eqpt
37       $ 1,491,124 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 308,988 $ 78,878 $ 42,847 $ 152,886 $ 19,625 $ 47,703 $ 35,916 $ 660,059 $ 130,973 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,391 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,857 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
38 Travel
39 Domestic   $ 59,477 $ 29,426 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,148 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,635 $ 1,878 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,878 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,878 $ - 0 $ - 0 $ 5,635 $ - 0 $ - 0 $ - 0 $ - 0
40 Foreign   $ 53,843 $ 10,017 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 41,947 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,878 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
41 Subtotal - Travel
42       $ 113,320 $ 39,443 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,148 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 47,582 $ 1,878 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,878 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,878 $ - 0 $ 1,878 $ 5,635 $ - 0 $ - 0 $ - 0 $ - 0
43 Participant Support Costs
44 Descr # participants   $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
45 Subtotal - Part. Supp.
46       $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
47 Other Direct Costs
48 Materials and Supplies $ 68,101 $ 16,174 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,110 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,217 $ 24,052 $ - 0 $ 991 $ - 0 $ - 0 $ 1,043 $ - 0 $ - 0 $ - 0 $ 1,774 $ - 0 $ 1,357 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,043 $ - 0 $ 991 $ 7,826 $ - 0 $ - 0 $ 522 $ - 0
49 Computers/Office     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
50 Software/licenses     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
51 Other categories     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
52 And other cats…     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
53 Subtotal - Materials and Supplies
54       $ 68,101 $ 16,174 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,110 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,217 $ 24,052 $ - 0 $ 991 $ - 0 $ - 0 $ 1,043 $ - 0 $ - 0 $ - 0 $ 1,774 $ - 0 $ 1,357 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,043 $ - 0 $ 991 $ 7,826 $ - 0 $ - 0 $ 522 $ - 0
55 Publication Costs/Documentation/Dissemination
56
57 Consultant Services Description   $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
58 Software/Programming     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
59 Database consultant     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
60 PMCS Service PMCS Consulting   $ 343,467 $ - 0 $ 343,467 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
61 Etc.     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
62 Subtotal - Consultant/Prof Services
63       $ 343,467 $ - 0 $ 343,467 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
64 Computer Services     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
65 Subotal Computer Services
66       $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
67 Subawards
68 MSU $ 125,362 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 69,749 $ 7,786 $ - 0 $ 3,073 $ - 0 $ 44,754 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
69 PSU $ 30,810 $ 16,624 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,186 $ - 0 $ - 0 $ - 0 $ - 0
70 UA $ 119,512 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 91,979 $ 27,533 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
71 UMD $ 69,017 $ 19,840 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 49,177 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
72 Subtotal - Subawards
73       $ 344,701 $ 36,464 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 69,749 $ 7,786 $ - 0 $ 3,073 $ - 0 $ 44,754 $ - 0 $ - 0 $ 91,979 $ 27,533 $ 49,177 $ 14,186 $ - 0 $ - 0 $ - 0 $ - 0
74 Other - Contingency     $ 1,537,363 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
75 Leases     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
76 Maint/Repair     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
77 Shipping/Postage     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
78 Subtotal - Other
79       $ 1,537,363 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
80 Total - Direct Costs
81       $ 4,981,124 $ 342,528 $ 388,540 $ 91,220 $ 11,976 $ 174,209 $ 531,035 $ 78,878 $ 42,847 $ 152,886 $ 19,625 $ 47,703 $ 41,133 $ 755,975 $ 132,852 $ 991 $ - 0 $ - 0 $ 1,043 $ 40,519 $ - 0 $ 69,749 $ 11,722 $ - 0 $ 50,291 $ - 0 $ 44,754 $ - 0 $ 37,770 $ 109,402 $ 27,533 $ 52,047 $ 186,009 $ - 0 $ - 0 $ 522 $ - 0
82 Indirect Costs
83 Indirect $ 852,206 $ 162,214 $ 205,926 $ 48,347 $ 6,347 $ 92,331 $ 117,685 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,765 $ 50,835 $ 995 $ 525 $ - 0 $ - 0 $ 553 $ 21,475 $ - 0 $ - 0 $ 2,086 $ - 0 $ 20,048 $ - 0 $ - 0 $ - 0 $ 20,018 $ 7,190 $ - 0 $ 1,521 $ 91,067 $ - 0 $ - 0 $ 277 $ - 0
84 Other - Contingency Indirect     $ 355,096 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
85 Subtotal - Indirect Costs     $ 1,207,302 $ 162,214 $ 205,926 $ 48,347 $ 6,347 $ 92,331 $ 117,685 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,765 $ 50,835 $ 995 $ 525 $ - 0 $ - 0 $ 553 $ 21,475 $ - 0 $ - 0 $ 2,086 $ - 0 $ 20,048 $ - 0 $ - 0 $ - 0 $ 20,018 $ 7,190 $ - 0 $ 1,521 $ 91,067 $ - 0 $ - 0 $ 277 $ - 0
86       $ - 0
87 Total - Direct and Indirect
88       $ 6,188,426 $ 504,741 $ 594,466 $ 139,567 $ 18,323 $ 266,540 $ 648,720 $ 78,878 $ 42,847 $ 152,886 $ 19,625 $ 47,703 $ 43,898 $ 806,810 $ 133,847 $ 1,517 $ - 0 $ - 0 $ 1,596 $ 61,994 $ - 0 $ 69,749 $ 13,808 $ - 0 $ 70,340 $ - 0 $ 44,754 $ - 0 $ 57,788 $ 116,593 $ 27,533 $ 53,568 $ 277,076 $ - 0 $ - 0 $ 798 $ - 0

Back to top


  A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH AI AJ AK AL AM AN
1 Project Year PY7   1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 1.2.6 1.2.7 1.2.8 1.2.9 1.2.10 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.4.1 1.4.2 1.4.3 1.4.4 1.4.5 1.4.6 1.5.1 1.5.2 1.5.3 1.5.4 1.6.0 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5
2 Institution UW   1.1 Project Office 1.2 Drilling and Installation 1.3 Deep Ice Sensor Modules 1.4 Comm/Power/Timing 1.5 Characterization and Calibration System 1.6 IceCube Data Systems Integration
3       1.1.1 Project Management 1.1.2 Project Controls 1.1.3 Quality and Safety 1.1.4 Polar Operations 1.1.5 Project Engineering 1.2.1 Implementation Management & Systems Engineering 1.2.2 Thermal Plant - Off-ice 1.2.3 Tower Operations Site (TOS) - Off-ice 1.2.4 Computing and Control System - Off-ice 1.2.5 Power Generation & Distribution 1.2.6 Water Handling Systems - Off-ice 1.2.7 Support Equipment - Off-ice 1.2.8 Drill Field Seasons - Antarctica 1.2.9 Installation - Off-ice 1.2.10 Installation Field Seasons - Antarctica 1.3.1 mDOM 1.3.2 D-Egg 1.3.3 PDOM 1.3.4 Ice Comms Module 1.3.5 Special Devices 1.4.1 Downhole Cables 1.4.2 Surface Cables 1.4.3 FieldHub 1.4.4 CPT Central Infrastructure 1.4.5 Northern Test System 1.4.6 CPT Management (PY4 onward) 1.5.1 Module Calibration 1.5.2 Calibration Assemblies 1.5.3 Array Calibration 1.5.4 Calibration Management and Organization 1.6.0 L2 Task Management 1.6.1 Online Systems Software 1.6.2 Offline Systems 1.6.3 Simulation Software 1.6.4 Computing Infrastructure 1.6.5 Upgrade String Commissioning
4 Expense Description Total Yr 5    
5 Senior Personnel  
6 Title Last Name Cal. Mo.
7 Principal Investigator Hanson 0.96 $ 19,243 $ 19,243 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
8 Project Manager Feyzi 4.83 $ 75,176 $ 75,176 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
9 Project Director ODell 3.53 $ 63,385 $ 63,385 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
10   $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
11 Other Personnel $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
12 Financial Manager Mercier 4.80 $ 34,105 $ - 0 $ 34,105 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
13 Project Controls Analyst N/A 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
14 Quality and Safety Zernick 10.08 $ 91,422 $ - 0 $ - 0 $ 69,023 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 22,399 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
15 Technical Coordinator DuVernois 6.00 $ 70,288 $ - 0 $ - 0 $ - 0 $ - 0 $ 70,288 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
16 Project Engineer Sandstrom 4.00 $ 41,020 $ - 0 $ - 0 $ - 0 $ - 0 $ 41,020 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
17 Logistics Manager Tosi 7.17 $ 48,952 $ - 0 $ - 0 $ - 0 $ 6,998 $ - 0 $ 27,185 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,769 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
18 Implementation Manager McEwen 12.00 $ 116,441 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 116,441 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
19 Engineer / Technician Wendt 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
20 Engineer / Technician Weber 6.33 $ 63,875 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 63,875 $ - 0 $ - 0 $ - 0 $ - 0
21 Engineer Kelley 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
22 Engineer Braun 0.64 $ 5,526 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,526 $ - 0 $ - 0 $ - 0 $ - 0
23 Engineer Auer 0.48 $ 4,605 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,605 $ - 0
24 Senior Scientist Senior Scientist 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
25 Scientist Scientist 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
26 Engineer S. Griffin 4.08 $ 30,659 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 30,659 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
27 Total Salaries and Wages
28       $ 664,696 $ 157,803 $ 34,105 $ 69,023 $ 6,998 $ 111,308 $ 143,626 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 22,399 $ - 0 $ 14,769 $ - 0 $ - 0 $ - 0 $ 30,659 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 69,401 $ - 0 $ - 0 $ 4,605 $ - 0
29 Fringe Benefits
30       $ 232,644 $ 55,231 $ 11,937 $ 24,158 $ 2,449 $ 38,958 $ 50,269 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,840 $ - 0 $ 5,169 $ - 0 $ - 0 $ - 0 $ 10,731 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 24,290 $ - 0 $ - 0 $ 1,612 $ - 0
31 Equipment
32 Descrip. Qty Unit Cost
33 Capital Equipment 1 1 $ 115,321 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 24,507 $ 14,923 $ 5,329 $ - 0 $ 10,659 $ 44,448 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 15,456 $ - 0
34 Capitalized Labor 1 1 $ 1,487,960 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 336,050 $ - 0 $ 3,922 $ 75,517 $ 4,912 $ - 0 $ 19,314 $ 1,024,608 $ - 0 $ 23,637 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
35      
36 Subtotal - Eqpt
37       $ 1,603,281 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 336,050 $ - 0 $ 28,430 $ 90,439 $ 10,241 $ - 0 $ 29,973 $ 1,069,056 $ - 0 $ 23,637 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 15,456 $ - 0
38 Travel
39 Domestic   $ 74,186 $ 30,058 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,430 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 23,023 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,756 $ - 0 $ - 0 $ 1,919 $ - 0
40 Foreign   $ 90,175 $ 10,233 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 76,105 $ - 0 $ 1,919 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,919 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
41 Subtotal - Travel
42       $ 164,361 $ 40,291 $ - 0 $ - 0 $ - 0 $ - 0 $ 13,430 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 99,128 $ - 0 $ 1,919 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,919 $ 5,756 $ - 0 $ - 0 $ 1,919 $ - 0
43 Participant Support Costs
44 Descr # participants   $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
45 Subtotal - Part. Supp.
46       $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
47 Other Direct Costs
48 Materials and Supplies $ 78,948 $ 16,521 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,522 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,329 $ 43,542 $ - 0 $ 1,013 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 533 $ - 0 $ 1,679 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,264 $ - 0 $ 1,013 $ - 0 $ - 0 $ - 0 $ 533 $ - 0
49 Computers/Office     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
50 Software/licenses     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
51 Other categories     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
52 And other cats…     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
53 Subtotal - Materials and Supplies
54       $ 78,948 $ 16,521 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,522 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,329 $ 43,542 $ - 0 $ 1,013 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 533 $ - 0 $ 1,679 $ - 0 $ - 0 $ - 0 $ - 0 $ 4,264 $ - 0 $ 1,013 $ - 0 $ - 0 $ - 0 $ 533 $ - 0
55 Publication Costs/Documentation/Dissemination
56
57 Consultant Services Description   $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
58 Software/Programming     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
59 Database consultant     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
60 PMCS Service PMCS Consulting   $ 359,152 $ - 0 $ 359,152 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
61 Etc.     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
62 Subtotal - Consultant/Prof Services
63       $ 359,152 $ - 0 $ 359,152 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
64 Computer Services     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
65 Subotal Computer Services
66       $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
67 Subawards
68 MSU $ 110,929 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,087 $ 35,571 $ - 0 $ 20,555 $ - 0 $ 45,716 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
69 PSU $ 31,472 $ 16,981 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,491 $ - 0 $ - 0 $ - 0 $ - 0
70 UA $ 216,038 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 187,913 $ 28,125 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
71 UMD $ 80,020 $ 20,267 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 51,799 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,954
72 Subtotal - Subawards
73       $ 438,458 $ 37,248 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 9,087 $ 35,571 $ - 0 $ 20,555 $ - 0 $ 45,716 $ - 0 $ - 0 $ 187,913 $ 28,125 $ 51,799 $ 14,491 $ - 0 $ - 0 $ - 0 $ 7,954
74 Other - Contingency     $ 931,089 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
75 Leases     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
76 Maint/Repair     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
77 Shipping/Postage     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
78 Subtotal - Other
79       $ 931,089 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
80 Total - Direct Costs
81       $ 4,472,629 $ 307,094 $ 405,194 $ 93,182 $ 9,447 $ 150,266 $ 547,896 $ - 0 $ 28,430 $ 90,439 $ 10,241 $ - 0 $ 35,302 $ 1,241,964 $ - 0 $ 46,507 $ - 0 $ - 0 $ - 0 $ 41,390 $ - 0 $ 9,087 $ 36,104 $ - 0 $ 22,234 $ - 0 $ 45,716 $ - 0 $ - 0 $ 192,176 $ 28,125 $ 54,730 $ 113,937 $ - 0 $ - 0 $ 24,123 $ 7,954
82 Indirect Costs
83 Indirect $ 794,894 $ 143,019 $ 214,753 $ 49,386 $ 5,007 $ 79,641 $ 112,279 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,825 $ 91,641 $ - 0 $ 12,121 $ - 0 $ - 0 $ - 0 $ 21,937 $ - 0 $ - 0 $ 282 $ - 0 $ 890 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,260 $ - 0 $ 1,554 $ 52,707 $ - 0 $ - 0 $ 4,594 $ - 0
84 Other - Contingency Indirect     $ 217,235 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
85 Subtotal - Indirect Costs     $ 1,012,130 $ 143,019 $ 214,753 $ 49,386 $ 5,007 $ 79,641 $ 112,279 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,825 $ 91,641 $ - 0 $ 12,121 $ - 0 $ - 0 $ - 0 $ 21,937 $ - 0 $ - 0 $ 282 $ - 0 $ 890 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,260 $ - 0 $ 1,554 $ 52,707 $ - 0 $ - 0 $ 4,594 $ - 0
86       $ - 0
87 Total - Direct and Indirect
88       $ 5,484,758 $ 450,113 $ 619,947 $ 142,568 $ 14,454 $ 229,907 $ 660,174 $ - 0 $ 28,430 $ 90,439 $ 10,241 $ - 0 $ 38,127 $ 1,333,606 $ - 0 $ 58,628 $ - 0 $ - 0 $ - 0 $ 63,327 $ - 0 $ 9,087 $ 36,386 $ - 0 $ 23,124 $ - 0 $ 45,716 $ - 0 $ - 0 $ 194,436 $ 28,125 $ 56,284 $ 166,644 $ - 0 $ - 0 $ 28,717 $ 7,954

Back to top


  A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH AI AJ AK AL AM AN
1 Project Year PY8   1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 1.2.6 1.2.7 1.2.8 1.2.9 1.2.10 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.4.1 1.4.2 1.4.3 1.4.4 1.4.5 1.4.6 1.5.1 1.5.2 1.5.3 1.5.4 1.6.0 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5
2 Institution UW   1.1 Project Office 1.2 Drilling and Installation 1.3 Deep Ice Sensor Modules 1.4 Comm/Power/Timing 1.5 Characterization and Calibration System 1.6 IceCube Data Systems Integration
3       1.1.1 Project Management 1.1.2 Project Controls 1.1.3 Quality and Safety 1.1.4 Polar Operations 1.1.5 Project Engineering 1.2.1 Implementation Management & Systems Engineering 1.2.2 Thermal Plant - Off-ice 1.2.3 Tower Operations Site (TOS) - Off-ice 1.2.4 Computing and Control System - Off-ice 1.2.5 Power Generation & Distribution 1.2.6 Water Handling Systems - Off-ice 1.2.7 Support Equipment - Off-ice 1.2.8 Drill Field Seasons - Antarctica 1.2.9 Installation - Off-ice 1.2.10 Installation Field Seasons - Antarctica 1.3.1 mDOM 1.3.2 D-Egg 1.3.3 PDOM 1.3.4 Ice Comms Module 1.3.5 Special Devices 1.4.1 Downhole Cables 1.4.2 Surface Cables 1.4.3 FieldHub 1.4.4 CPT Central Infrastructure 1.4.5 Northern Test System 1.4.6 CPT Management (PY4 onward) 1.5.1 Module Calibration 1.5.2 Calibration Assemblies 1.5.3 Array Calibration 1.5.4 Calibration Management and Organization 1.6.0 L2 Task Management 1.6.1 Online Systems Software 1.6.2 Offline Systems 1.6.3 Simulation Software 1.6.4 Computing Infrastructure 1.6.5 Upgrade String Commissioning
4 Expense Description Total Yr 5    
5 Senior Personnel  
6 Title Last Name Cal. Mo.
7 Principal Investigator Hanson 0.64 $ 13,104 $ 13,104 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
8 Project Manager Feyzi 2.83 $ 45,016 $ 45,016 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
9 Project Director ODell 1.60 $ 29,320 $ 29,320 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
10   $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
11 Other Personnel $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
12 Financial Manager Mercier 3.20 $ 23,226 $ - 0 $ 23,226 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
13 Project Controls Analyst N/A 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
14 Quality and Safety Zernick 6.01 $ 49,122 $ - 0 $ - 0 $ 14,934 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 34,188 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
15 Technical Coordinator DuVernois 1.00 $ 11,967 $ - 0 $ - 0 $ - 0 $ - 0 $ 11,967 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
16 Project Engineer Sandstrom 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
17 Logistics Manager Tosi 4.53 $ 27,532 $ - 0 $ - 0 $ - 0 $ 1,388 $ - 0 $ 4,885 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 21,258 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
18 Implementation Manager McEwen 7.00 $ 69,384 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 69,384 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
19 Engineer / Technician Wendt 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
20 Engineer / Technician Weber 3.83 $ 39,492 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 39,492 $ - 0 $ - 0 $ - 0 $ - 0
21 Engineer Kelley 1.00 $ 10,444 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,444 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
22 Engineer Braun 0.32 $ 2,822 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,822 $ - 0 $ - 0 $ - 0 $ - 0
23 Engineer Auer 0.32 $ 3,136 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,136 $ - 0
24 Senior Scientist Senior Scientist 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
25 Scientist Scientist 0.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
26 Engineer S. Griffin 2.38 $ 18,269 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 18,269 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
27 Total Salaries and Wages
28       $ 342,835 $ 87,440 $ 23,226 $ 14,934 $ 1,388 $ 11,967 $ 74,269 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 34,188 $ - 0 $ 21,258 $ - 0 $ - 0 $ - 0 $ 18,269 $ - 0 $ - 0 $ - 0 $ - 0 $ 10,444 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 42,315 $ - 0 $ - 0 $ 3,136 $ - 0
29 Fringe Benefits
30       $ 119,992 $ 30,604 $ 8,129 $ 5,227 $ 486 $ 4,188 $ 25,994 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 11,966 $ - 0 $ 7,440 $ - 0 $ - 0 $ - 0 $ 6,394 $ - 0 $ - 0 $ - 0 $ - 0 $ 3,656 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 14,810 $ - 0 $ - 0 $ 1,098 $ - 0
31 Equipment
32 Descrip. Qty Unit Cost
33 Capital Equipment 1 1 $ 2,178 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 2,178 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
34 Capitalized Labor 1 1 $ 1,392,095 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 126,967 $ - 0 $ - 0 $ 4,007 $ - 0 $ - 0 $ 8,362 $ 1,252,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
35      
36 Subtotal - Eqpt
37       $ 1,394,273 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 126,967 $ - 0 $ - 0 $ 4,007 $ - 0 $ - 0 $ 10,540 $ 1,252,760 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
38 Travel
39 Domestic   $ 1,960 $ 1,960 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
40 Foreign   $ 3,920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,960 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,960 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
41 Subtotal - Travel
42       $ 5,880 $ 1,960 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,960 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 1,960 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
43 Participant Support Costs
44 Descr # participants   $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
45 Subtotal - Part. Supp.
46       $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
47 Other Direct Costs
48 Materials and Supplies $ 9,037 $ 8,493 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 272 $ - 0 $ 272 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
49 Computers/Office     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
50 Software/licenses     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
51 Other categories     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
52 And other cats…     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
53 Subtotal - Materials and Supplies
54       $ 9,037 $ 8,493 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 272 $ - 0 $ 272 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
55 Publication Costs/Documentation/Dissemination
56
57 Consultant Services Description   $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
58 Software/Programming     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
59 Database consultant     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
60 PMCS Service PMCS Consulting   $ 280,327 $ - 0 $ 280,327 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
61 Etc.     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
62 Subtotal - Consultant/Prof Services
63       $ 280,327 $ - 0 $ 280,327 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
64 Computer Services     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
65 Subotal Computer Services
66       $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
67 Subawards
68 MSU $ 63,844 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 57,347 $ - 0 $ - 0 $ 3,038 $ - 0 $ 3,460 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
69 PSU $ 18,965 $ 11,564 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 7,401 $ - 0 $ - 0 $ - 0 $ - 0
70 UA $ 98,897 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 95,976 $ 2,920 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
71 UMD $ 41,847 $ 13,802 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 22,629 $ - 0 $ - 0 $ - 0 $ - 0 $ 5,416
72 Subtotal - Subawards
73       $ 223,554 $ 25,366 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 57,347 $ - 0 $ - 0 $ 3,038 $ - 0 $ 3,460 $ - 0 $ - 0 $ 95,976 $ 2,920 $ 22,629 $ 7,401 $ - 0 $ - 0 $ - 0 $ 5,416
74 Other - Contingency     $ 538,290 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
75 Leases     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
76 Maint/Repair     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
77 Shipping/Postage     $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
78 Subtotal - Other
79       $ 538,290 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
80 Total - Direct Costs
81       $ 2,914,188 $ 153,862 $ 311,682 $ 20,161 $ 1,874 $ 16,155 $ 227,230 $ - 0 $ - 0 $ 4,007 $ - 0 $ - 0 $ 10,540 $ 1,298,914 $ - 0 $ 30,659 $ - 0 $ - 0 $ - 0 $ 24,663 $ - 0 $ 57,347 $ 272 $ - 0 $ 19,370 $ - 0 $ 3,460 $ - 0 $ - 0 $ 95,976 $ 2,920 $ 22,629 $ 64,526 $ - 0 $ - 0 $ 4,233 $ 5,416
82 Indirect Costs
83 Indirect $ 401,778 $ 68,103 $ 165,191 $ 10,685 $ 993 $ 8,562 $ 53,140 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 24,462 $ - 0 $ 16,249 $ - 0 $ - 0 $ - 0 $ 13,072 $ - 0 $ - 0 $ 144 $ - 0 $ 8,656 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 30,276 $ - 0 $ - 0 $ 2,244 $ - 0
84 Other - Contingency Indirect     $ 97,060 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
85 Subtotal - Indirect Costs     $ 498,838 $ 68,103 $ 165,191 $ 10,685 $ 993 $ 8,562 $ 53,140 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 24,462 $ - 0 $ 16,249 $ - 0 $ - 0 $ - 0 $ 13,072 $ - 0 $ - 0 $ 144 $ - 0 $ 8,656 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ 30,276 $ - 0 $ - 0 $ 2,244 $ - 0
86       $ - 0
87 Total - Direct and Indirect
88       $ 3,413,026 $ 221,965 $ 476,873 $ 30,846 $ 2,868 $ 24,717 $ 280,370 $ - 0 $ - 0 $ 4,007 $ - 0 $ - 0 $ 10,540 $ 1,323,376 $ - 0 $ 46,908 $ - 0 $ - 0 $ - 0 $ 37,735 $ - 0 $ 57,347 $ 416 $ - 0 $ 28,026 $ - 0 $ 3,460 $ - 0 $ - 0 $ 95,976 $ 2,920 $ 22,629 $ 94,802 $ - 0 $ - 0 $ 6,477 $ 5,416