1. FS1 format
  2. FS2 format
  3. FS3 format

  B C D E F
1          
2 Row Labels FS1 - November FS1 - December FS1 - January FS1 - February
3 1.2.8.5.10 END NPX FS1
4 EN
5 1.2.8.5.5.1 SES: Drillers Support for SES Layout 18 18 4
6 EN 18 18 4
7 1.2.8.5.5.2 SES: Layout - Hoses, Cables, Interconnects and Cable trays 288
8 TE 288
9 1.2.8.5.5.3.1 SES: Deliver, Upgrade,/Repair, Connect, Test Fuel Tower 16 4
10 EN 16 4
11 1.2.8.5.5.4 SES: Temp power from backup generator (CRELL, ONAN) 1 2 1
12 EN 1 2 1
13 1.2.8.5.6.1 Gens/PDM: Lift generators onto Skis with Crane 8
14 TE 8
15 1.2.8.5.6.3 Gens/PDM: Generators - Misc Repairs 40 40
16 EN 40 40
17 1.2.8.5.6.5 Gens/PDM: Preliminary GEN Testing 16
18 EN 16
19 1.2.8.5.7.1.1 Computing/Controls: Install Retrofit Kits 48 60 36
20 EN 48 60 36
21 1.2.8.5.7.1.2 Computing/Controls: Install Modbus & DGH Modules (EE) 8 8
22 EN 8 8
23 1.2.8.5.7.1.2 Computing/Controls: Misc. Controls Tasking (EE) 8 8
24 EN 8 8
25 1.2.8.5.7.1.3 Computing/Controls: Conduit wiring
26 TE
27 1.2.8.5.7.10.1 RWCR: Integrate & Test (EE) 8
28 EN 8
29 1.2.8.5.7.10.1 RWCR: Integrate & Test (TE) 8
30 TE 8
31 1.2.8.5.7.11.1 Winches/Reels: Repair/Retrofit Winches & Reels (EE) 48
32 EN 48
33 1.2.8.5.7.11.1 Winches/Reels: Repair/Retrofit Winches & Reels (ME) 8
34 EN 8
35 1.2.8.5.7.11.1 Winches/Reels: Repair/Retrofit Winches & Reels (TE) 48
36 TE 48
37 1.2.8.5.7.12.1 Hoses/Cables/Etc.: Inventory & Repair 40 40
38 TE 40 40
39 1.2.8.5.7.13.1 IFD: Repair/Refit/Test (EE) 32
40 TE 32
41 1.2.8.5.7.13.1 IFD: Repair/Refit/Test (ME) 32
42 TE 32
43 1.2.8.5.7.13.1 IFD: Repair/Refit/Test (TE w/ ASC Electrician Support) 16
44 TE 16
45 1.2.8.5.7.14.1 ARA Drill: Repair and Upgrade ARA Drill (EE) 80
46 EN 80
47 1.2.8.5.7.14.1 ARA Drill: Repair and Upgrade ARA Drill (ME) 96
48 EN 96
49 1.2.8.5.7.14.1 ARA Drill: Repair and Upgrade ARA Drill (TE) 48
50 TE 48
51 1.2.8.5.7.14.2 ARA Drill: Preliminary Integration (EE) 8
52 EN 8
53 1.2.8.5.7.14.2 ARA Drill: Preliminary Integration (ME) 8
54 EN 8
55 1.2.8.5.7.14.2 ARA Drill: Preliminary Integration (TE) 8
56 TE 8
57 1.2.8.5.7.14.3 ARA Drill: Winterize & Store ARA Drill 32
58 EN 32
59 1.2.8.5.7.2.1 DCC: Controls Retrofit (EE) 24
60 EN 24
61 1.2.8.5.7.2.1 DCC: Repairs, Electrical Upgrades, Install Racks (EE) 32
62 TE 32
63 1.2.8.5.7.3.1 MHP: Controls Retrofit (EE) 128 128
64 EN 128 128
65 1.2.8.5.7.3.1 MHP: Retrofit MHPs 116 116
66 EN 20 20
67 TE 96 96
68 1.2.8.5.7.3.2 MHP subsystem evaluation 32
69 EN 32
70 1.2.8.5.7.4.1 PHS: Controls Retrofit (EE) 106
71 EN 106
72 1.2.8.5.7.4.1 PHS: Mechanical Retrofit (EN) 32
73 EN 32
74 1.2.8.5.7.4.1 PHS: Mechanical Retrofit (TE) 40
75 TE 40
76 1.2.8.5.7.4.2 PHS: Subsystem Evaluation 16
77 EN 16
78 1.2.8.5.7.4.3 PHS: Install Filtration System 48
79 EN 48
80 1.2.8.5.7.5.1 Water Tanks: Retrofit (Railings, Ladders, Vert pumps, Submersible Pumps, Manifolds, etc.) 176
81 EN 40
82 TE 136
83 1.2.8.5.7.5.2 Water Tank: Subsystem Evaluation 16
84 EN 16
85 1.2.8.5.7.6.1 HPP: Controls Retrofit (Sensors, Motor Drives, Air Handling, Etc.) 96
86 EN 96
87 1.2.8.5.7.6.1 HPP: Controls Retrofit (Sensors, Motor Drives, Air Handling, Etc.) 16
88 TE 16
89 1.2.8.5.7.6.1 HPP: Mechanical Refit 120
90 EN 24
91 TE 96
92 1.2.8.5.7.6.2 HPP: Pump Evaluated 16
93 EN 16
94 1.2.8.5.7.7.1 Shops: Repair/Retrofit SHOP 16 16 16
95 EN 16 16 16
96 1.2.8.5.7.7.1 Shops: Repair/Retrofit Shops, MECC 16 16 16
97 TE 16 16 16
98 1.2.8.5.7.7.1 Shops: Repair/Retrofit Shops, OML 8
99 EN 8
100 1.2.8.5.7.7.1 Shops: Repair/Retrofit Shops, SEW 8 8
101 EN 8 8
102 1.2.8.5.7.8.1 TOS/Towers: Inspect/Test Controls (EE) 8 16
103 EN 8 16
104 1.2.8.5.7.8.1 TOS/Towers: Inspect/Test Mechanical Systems (ME) 8 8
105 EN 8 8
106 1.2.8.5.7.8.1 TOS/Towers: Repair/Retrofit 64 64
107 TE 64 64
108 1.2.8.5.7.8.1 TOS/Towers: Repair/Retrofit Controls (EE) 392 392
109 EN 392 392
110 1.2.8.5.7.8.1 TOS/Towers: Repair/Retrofit Mechanical (ME) 32 32
111 EN 32 32
112 1.2.8.5.7.9.1 MSHR: Repair/Replace Components, Energize & Test (EE) 48
113 EN 48
114 1.2.8.5.7.9.1 MSHR: Repair/Replace Components, Energize & Test (ME) 24
115 EN 24
116 1.2.8.5.7.9.1 MSHR:Repair/Replace Components, Energize & Test 56
117 TE 56
118 1.2.8.5.8.1 Close-out: Document, Photograph Equip & Upgrade Work, Further Req's 120
119 TE 120
120 1.2.8.5.8.2 Winterize/Close/Store all EHWD Equipment 44 40
121 TE 44 40
122 1.2.8.5.8.3 Retro all components, crate, pack and deliver to cargo 32
123 TE 32
124 1.2.8.5.9.1 MCM Logistics Rep (driller) 144
125 TE 144
126 Grand Total 468 1997 1512 117

Back to top


  B C D E
1        
2 Row Labels FS2 - November FS2 - December FS2 - January
3 1.2.8.6.1 START NPX FS2 - Team Arrives [Comm/WTst/FirnDr]
4 EN
5 1.2.8.6.10.1 Rod Well: Develop & Maintain (Using ARA Drill) 250 150
6 EN 250 150
7 1.2.8.6.11.1 IFD: Integration and Commissioning 32
8 TE 32
9 1.2.8.6.11.2 IFD: Drill 8 Firn Holes 48 48
10 EN 48 48
11 1.2.8.6.11.4 IFD: Winterize & Store 48
12 EN 48
13 1.2.8.6.12.1 Wet Test: Readiness Review, Safety Refresher, Emergency & Safety Systems Tested 112
14 EN 112
15 1.2.8.6.12.2 Wet Test: Fire Boilers, Circulate Water or Glycol 32
16 EN 32
17 1.2.8.6.12.3 Wet Test: Perform Systems Tests (Wet Test & Comm.) 672
18 TE 672
19 1.2.8.6.12.4 Wet Test: Blow Out Systems (need ASC compressor) 180
20 TE 180
21 1.2.8.6.13.1 Close-out: Document, Photograph Equip & Upgrade Work, Further Req's 44
22 EN 44
23 1.2.8.6.13.2 Close-out: Remove DNF, Computer Equip, Drives, Capacitors, Etc 144
24 TE 144
25 1.2.8.6.13.3 Close-out: Winterize/Close/Store all EHWD Equipment 96
26 EN 96
27 1.2.8.6.13.4 Close-out: Prepare Retrograde for Shipment 32
28 TE 32
29 1.2.8.6.13.5.1 Winterize: Remove & Retro/Store All DNF 48
30 TE 48
31 1.2.8.6.13.5.2 Winterize: Winterize SES & TOS, Disconnect all Cables, Hoses, Connections 144
32 TE 144
33 1.2.8.6.13.5.3 Winterize: All EHWD Equipment Winterized
34 EN
35 1.2.8.6.14.1 MCM Logistics Rep (driller) 144
36 EN 144
37 1.2.8.6.15 END NPX FS2 Season
38 EN
39 1.2.8.6.5.1 SES: Fuel Tower: Connect, Test and Make Ready 32
40 TE 32
41 1.2.8.6.5.2 SES: Make Ready all SES Modules (DCC, PHS, MHPs, MECC, WTs, All) 48
42 TE 48
43 1.2.8.6.5.3 SES: Furnace Checkout & Fire Up (All modules) 32
44 EN 32
45 1.2.8.6.5.4 SES: Perform Emergency Incident Drill & Safety Training 112
46 EN 112
47 1.2.8.6.5.5 SES: Maintenance Activities 56 56
48 TE 56 56
49 1.2.8.6.5.6 SES: Site Snow Removal 96
50 TE 96
51 1.2.8.6.6.1 Generators/PDM: Charge Generator Batteries 1
52 EN 1
53 1.2.8.6.6.2 Generators/PDM: Prime/Commission Fuel System 24
54 EN 24
55 1.2.8.6.6.3 Generators/PDM: GEN-1, 2, 3 - Install GEN hoods 96
56 EN 96
57 1.2.8.6.6.4 GEN-1, 2, 3, PDM - Repairs & Tests w/Contract Tech Support 96 48
58 EN 96 48
59 1.2.8.6.6.5 Generator & PDM: Commission & Final Testing 32
60 EN 32
61 1.2.8.6.6.7 Generators/PDM: Change from Temporary Power to IceCube Grid 8
62 EN 8
63 1.2.8.6.7.1.1 DCC: Install Racks, Networks, Computers 32
64 TE 32
65 1.2.8.6.7.10.1 TOS/Tower Equipment - Retrofit & Testing 128
66 TE 128
67 1.2.8.6.7.11.1 Computing/Control: System Integration, Verification, Test at NPX 250 350 360
68 TE 250 350 360
69 1.2.8.6.7.11.2 Computing/Control: Testing and Reprogramming Motor Drives 160 160
70 TE 160 160
71 1.2.8.6.7.11.3 Computing/Controls: Install Retrofit Kits 48 60 40
72 TE 48 60 40
73 1.2.8.6.7.11.4 Computing/Controls: Misc. Controls Tasking (EE) 8 25 8
74 EN 8 25 8
75 1.2.8.6.7.11.4 Computing/Controls: Misc. Controls Tasking (TE) 48 60 36
76 TE 48 60 36
77 1.2.8.6.7.11.5 Computing/Controls: Conduit wiring 72 48 48
78 TE 72 48 48
79 1.2.8.6.7.12.1 ARA Drill: Integrate HPU-2 & Commission 144
80 EN 96
81 TE 48
82 1.2.8.6.7.12.2 ARA Drill: Decommission & Store ARA Drill 32
83 TE 32
84 1.2.8.6.7.2.1 MHP: Final Upgrade & Replacement Activities 64
85 EN 64
86 1.2.8.6.7.2.2 MHP: Final Testing 32
87 TE 32
88 1.2.8.6.7.3.1 PHS: Install Filters in H2O System 4
89 TE 4
90 1.2.8.6.7.3.2 PHS: Final Upgrade & Replacement Activities 32
91 TE 32
92 1.2.8.6.7.3.3 PHS: Final Testing 32
93 EN 32
94 1.2.8.6.7.4.1 Water Tanks: Install Railings, Ladders, Pumps, Plumbing, Doghouses - Final Upgrades 176
95 EN 40
96 TE 136
97 1.2.8.6.7.4.2 Water Tanks: Integrate, Verify, Test 64
98 EN 64
99 1.2.8.6.7.5.1 HPP: Final Upgrade & Replacement Activities 32
100 TE 32
101 1.2.8.6.7.5.2 HPP: Pump Testing 32
102 EN 32
103 1.2.8.6.7.6.1 Shops: Final Upgrade/Retrofit Shops, MECC 8
104 TE 8
105 1.2.8.6.7.6.1 Shops: Final Upgrade/Retrofit Shops, OML, TOW, SEW 16
106 TE 16
107 1.2.8.6.7.7.1 MSHR: Install Drill Hose on Reel 128
108 TE 128
109 1.2.8.6.7.7.2 MSHR: Final Upgrades & Testing 48
110 EN 48
111 1.2.8.6.7.7.3 MSHR: Install Blankets, 54
112 TE 54
113 1.2.8.6.7.7.3 MSHR: Install Blankets, Connect to Power, Heating Control and Test 32
114 EN 32
115 1.2.8.6.7.8.1 Winches/Reels: Final Integration & Testing 192
116 EN 144
117 TE 48
118 1.2.8.6.7.9.1 Fuel Storage/Delivery: Commission Fuel Tower 32 96
119 TE 32 96
120 1.2.8.6.8.1 Sensor Handling Facility: Assemble Skis and Deck, Erect Walls, Construct Walls, Construct Roof 168
121 EN 168
122 1.2.8.6.8.2 Sensor Handling Facility: Final Assembly with ASC-provided Crane 24
123 TE 24
124 1.2.8.6.9.1 Condensate Bulb: Drill and Pump 240
125 EN 240
126 1.2.9.5.5 String: On-ice Sensor Handling Training
127 SS
128 TE
129 1.2.9.5.6.10 String: Install SJB's in Pits (2); Connect cables (ASC & UW) 8
130 SC 8
131 1.2.9.5.6.3 String: Prep/Uncrate Cable Spools; Load onto TU20 (ASC & UW) 24
132 TE 24
133 1.2.9.5.6.4 String: Install 7 Surface Cables into ICL Tower, Across Bridge, into ICL (ASC & UW) 16
134 SC 16
135 1.2.9.5.6.5 String: Prep Cables & Attach to Grounding System in ICL (ASC & UW) 8
136 SE 8
137 1.2.9.5.6.6 String: Connect Surface Cables into ICL Patch Panels (UW) 8
138 SE 8
139 1.2.9.5.6.9 String: Unspool & Lay Surface Cables from Tower to SJB Pits (ASC, UW & MSU) 32
140 SC 32
141 Grand Total 1815 2249 2616

Back to top


  B C D E F
1          
2 Row Labels FS3 - November FS3 - December FS3 - January FS3 - February
3 1.2.8.7.1 START NPX FS3 - Team Arrives [Drilling/Installation]
4 TE
5 1.2.8.7.10.1 Installation: DRILL HOLE # 1 522
6 EN 522
7 1.2.8.7.10.10 Installation: Deployment - String 2 72
8 EN 72
9 1.2.8.7.10.11 Installation: String # 2 Deployed & Complete 0
10 EN 0
11 1.2.8.7.10.12 Installation: Closeout & Relocate Tower & TOS to Hole 4 32
12 EN 32
13 1.2.8.7.10.13 Installation: Trench & Install Reel Anchors (Hole 3) 16
14 EN 16
15 1.2.8.7.10.14 Installation: Relocate Hose, Cable Reels, Sensor Handling Structure (at end of installation) 28
16 TE 28
17 1.2.8.7.10.15 Installation: Prepare SFC-DOM Cable (Mount on TU20, test slip ring) - Prep for String 4 8
18 EN 8
19 1.2.8.7.10.16 Installation: DRILL HOLE # 3 522
20 TE 522
21 1.2.8.7.10.17 Installation: Deployment - String 3 72
22 EN 72
23 1.2.8.7.10.18 Installation: String # 3 Deployed & Complete
24 TE
25 1.2.8.7.10.19 Installation: Closeout & Relocate Tower & TOS for Hole 5 32
26 EN 32
27 1.2.8.7.10.2 Installation: Deployment - String 1 72
28 TE 72
29 1.2.8.7.10.20 Installation: Trench & Install Reel Anchors (Hole 4) 16
30 TE 16
31 1.2.8.7.10.21 Installation: Relocate Hose, Cable Reels, Sensor Handling Structure (at end of installation) 28
32 EN 28
33 1.2.8.7.10.22 Installation: Hole Excavation, Trench & Install Cable Anchor (Hole 4) 16
34 EN 16
35 1.2.8.7.10.23 Installation: Prepare SFC-Sensor Cable (Mount on TU20, test slip ring) - Prep for String 5 8
36 TE 8
37 1.2.8.7.10.24 Installation: DRILL HOLE # 4 522
38 EN 522
39 1.2.8.7.10.25 Installation: Deployment 72
40 EN 72
41 1.2.8.7.10.26 Installation: String # 4 Deployed & Complete
42 TE
43 1.2.8.7.10.27 Installation: Closeout & Relocate Tower & TOS for Hole 6 32
44 TE 32
45 1.2.8.7.10.28 Installation: Trench & Install Reel Anchors (Hole 5) 16
46 EN 16
47 1.2.8.7.10.29 Installation: Relocate Hose, Cable Reels, Sensor Handling Structure (at end of installation) 28
48 EN 28
49 1.2.8.7.10.3 Installation: String # 1 Deployed & Complete
50 EN
51 1.2.8.7.10.30 Installation: Hole Excavation, Trench & Install Cable Anchor (Hole 5) 16
52 TE 16
53 1.2.8.7.10.31 Installation: Prepare SFC-Sensor Cable (Mount on TU20, test slip ring) - Prep for String 6 8
54 EN 8
55 1.2.8.7.10.32 Installation: DRILL HOLE # 5 522
56 EN 522
57 1.2.8.7.10.33 Installation: Deployment - String 5 72
58 TE 72
59 1.2.8.7.10.34 Installation: String # 5 Deployed & Complete
60 EN
61 1.2.8.7.10.35 Installation: Closeout & Relocate Tower & TOS for Hole 7 32
62 EN 32
63 1.2.8.7.10.36 Installation: Trench & Install Reel Anchors (Hole 6) 16
64 TE 16
65 1.2.8.7.10.37 Installation: Relocate Hose, Cable Reels, Sensor Handling Structure (at end of installation) 28
66 EN 28
67 1.2.8.7.10.38 Installation: Hole Excavation, Trench & Install Cable Anchor (Hole 6) 16
68 TE 16
69 1.2.8.7.10.39 Installation: Prepare SFC-Sensor Cable (Mount on TU20, test slip ring) - Prep for String 7 8
70 EN 8
71 1.2.8.7.10.4 Installation: Closeout & Relocate Tower & TOS to Hole 3 32
72 TE 32
73 1.2.8.7.10.40 Installation: DRILL HOLE # 6 522
74 EN 522
75 1.2.8.7.10.41 Installation: Driller Support for Dust Logging Activities 16
76 TE 16
77 1.2.8.7.10.42 Installation: Deployment - String 6 72
78 EN 72
79 1.2.8.7.10.43 Installation: String # 6 Deployed & Complete
80 EN
81 1.2.8.7.10.44 Installation: Closeout & Relocate Tower & TOS to Storage 32
82 EN 32
83 1.2.8.7.10.45 Installation: Trench & Install Reel Anchors (Hole 7) 16
84 TE 16
85 1.2.8.7.10.46 Installation: Relocate Hose, Cable Reels, Sensor Handling Structure (at end of installation) 28
86 EN 28
87 1.2.8.7.10.47 Installation: Hole Excavation, Trench & Install Cable Anchor (Hole 7) 16
88 EN 16
89 1.2.8.7.10.48 Installation: DRILL HOLE # 7 522
90 TE 522
91 1.2.8.7.10.49 Installation: Deployment - String 7 72
92 EN 72
93 1.2.8.7.10.5 Installation: Trench & Install Reel Anchors (Hole 2) 16
94 TE 16
95 1.2.8.7.10.50 Installation: String # 7 Deployed & Complete
96 TE
97 1.2.8.7.10.51 Installation: Closeout & Relocate Tower & TOS to Storage Change duration 7 days 32
98 EN 32
99 1.2.8.7.10.52 Installation: Drilling & Installation Complete
100 TE
101 1.2.8.7.10.6 Installation: Relocate Hose, Cable Reels, Sensor Handling Structure (at end of installation) 28
102 EN 28
103 1.2.8.7.10.7 Installation: Prepare SFC-DOM Cable (Mount on TU20, test slip ring) Prep for String 3 8
104 EN 8
105 1.2.8.7.10.8 Installation: Operational Debrief 112
106 EN 112
107 1.2.8.7.10.9 Installation: DRILL HOLE # 2 522
108 TE 522
109 1.2.8.7.11.1 Decommission and Store: Remove & Retro/Store All DNF 375
110 TE 375
111 1.2.8.7.11.2 Decommission and Store:Decommission SES & TOS, Disconnect all cables hoses, connections 485
112 EN 485
113 1.2.8.7.11.3 Decommission and Store: Winterize all EHWD equipment 585
114 TE 585
115 1.2.8.7.11.4 Decommission and Store: Remove Drill Hose from MSHR, Respool & Ship to ZCM 217
116 EN 217
117 1.2.8.7.11.5 Decommission and Store: Shipment of Drill Hose to ZCM 40
118 TE 40
119 1.2.8.7.11.6 Decommission and Store: Inventory & Photograph EHWD, Document Repairs needed 325
120 EN 325
121 1.2.8.7.11.7 Decommission and Store: UNL Equipment - Deliver to Cargo for Retro or Redistribution 80
122 TE 80
123 1.2.8.7.11.8 Decommission and Store: Crate and Deliver EHWD Equipment to Cargo for Retrograde or Redistribution 225
124 EN 225
125 1.2.8.7.11.9 Decommission and Store: Cargo Retro FS3
126 EN
127 1.2.8.7.5.1 SES: Make Ready all Drill Modules (DCC, PHS, MHPs, TOS 1&2, WTs, Handling Facility) 244
128 EN 244
129 1.2.8.7.5.2 SES: Furnace Checkout & Fire Up (All modules) 32
130 TE 32
131 1.2.8.7.5.3 SES: Perform Emergency Incident Drill & Safety Training 672
132 EN 672
133 1.2.8.7.5.4 SES: Make ARA Drill Ready for Service 80
134 EN 40
135 TE 40
136 1.2.8.7.5.5 SES: Re-Establish RodWell 176 96
137 EN 176 96
138 1.2.8.7.5.6 SES: SES and Equipment Maintenance 60 124 124
139 TE 60 124 124
140 1.2.8.7.5.7 SES: Ready for Drilling - (On Ice Final Readiness Assessment)
141 EN
142 1.2.8.7.5.8 SES: Dig-out 96
143 EN 96
144 1.2.8.7.6.1 Generator/PDM: Recommission 96
145 TE 96
146 1.2.8.7.6.2 Generator/PDM: Generators Ready 0
147 TE 0
148 1.2.8.7.6.3 Generator/PDM: Change from Temp Power to Generators (Stand Alone) 8
149 EN 8
150 1.2.8.7.7.1 TOS1/Tower1: Hole Excavation, Trench & Install Cable Anchor (Hole 1) 16
151 EN 16
152 1.2.8.7.7.10 TOS1/Tower1: Prepare SFC-DOM Cable (Mount on TU20, test slip ring) 16
153 EN 16
154 1.2.8.7.7.11 TOS1/Tower1: Pull Drill Heads from ICL, Final Testing in TOS 16
155 TE 16
156 1.2.8.7.7.12 TOS1/Tower1: Site Ready for Drilling
157 EN
158 1.2.8.7.7.2 TOS1/Tower1: Position & Level TOS1/Tower1 at Hole 1 16
159 EN 16
160 1.2.8.7.7.3 TOS1/Tower1: Position Sensor Handling Structure 8
161 TE 8
162 1.2.8.7.7.4 TOS1/Tower1: Hose & Cable Delivery & Layout SES-TOS 96
163 EN 96
164 1.2.8.7.7.5 TOS1/Tower1: Trench & Install Reel Anchors (Hole 1) 8
165 TE 8
166 1.2.8.7.7.6 TOS1/Tower1: Position Hose & Cable Reels (Hole 1) 8
167 EN 8
168 1.2.8.7.7.7 TOS1/Tower1: Make TOS1 Operational, Deliver fuel, fire furnace 16
169 TE 16
170 1.2.8.7.7.8 TOS1/Tower1: TOS1 Network/Comms Install 6
171 EN 6
172 1.2.8.7.7.9 TOS1/Tower1: Connect Hose Loop, Circulate Water 48
173 TE 48
174 1.2.8.7.8.1 TOS2/Tower2: Position & Level TOS2/Tower2 at Hole 2 16
175 EN 16
176 1.2.8.7.8.2 TOS2/Tower2: Cable Layout SES to TOS2 16
177 TE 16
178 1.2.8.7.8.3 TOS2/Tower2:Make TOS2 Operational, Deliver fuel, fire furnace 16
179 EN 16
180 1.2.8.7.8.4 TOS2/Tower2: TOS2 Network/Comms Install 6
181 EN 6
182 1.2.8.7.8.5 TOS2/Tower2: TOS2/Tower2 in Position & Heated
183 TE
184 1.2.8.7.9.1 Wet Test: Readiness Review/Safety Refresher 224
185 TE 224
186 1.2.8.7.9.1 Wet Test: Training (Direct Hire Drillers -15) 1200
187 TE 1200
188 1.2.8.7.9.1 Wet Test: Training (Engineer/Drillers - 3) 240
189 EN 240
190 1.2.8.7.9.2 Wet Test: Emergency & Safety Systems Tested 192
191 EN 192
192 1.2.8.7.9.3 Wet Test: Fire Boilers, Circulate Water 160
193 EN 160
194 1.2.8.7.9.4 Wet Test: Perform Complete Systems Testing (Wet Test & Comm.) 800
195 TE 800
196 1.2.9.6.1 String: Plan & Coordinate Installation (FS3) 80 80 80 80
197 SS 80 80 80 80
198 1.2.9.6.2 String: On Ice Readiness Review for 1st Hole Drill / Deployment 16
199 SC 16
200 1.2.9.6.3 String: Erect Sensor Testing Tent - (ASC)
201 TE
202 1.2.9.6.4.1 String: Excavate Surface Junction Box (SJB #1) Vaults (hole side) (ASC)
203 SC
204 1.2.9.6.4.10 String: Spool Slack Cable in Pit/Trench, 4 times (UW & MSU) 16
205 TE 16
206 1.2.9.6.4.11 String: Connect Cables to SJB #2 x 4 (UW & MSU) 8
207 SC 8
208 1.2.9.6.4.12 String: Survey & Backfill Cable Trenches, 4 times (ASC & UW) 8
209 SC 8
210 1.2.9.6.4.2 String: Remove SJB #1 Vault Lid & Walls (ASC) 8
211 SC 8
212 1.2.9.6.4.3 String: Trench from Holes to SJB #2 Pits, 3 times (ASC)
213 TE
214 1.2.9.6.4.4 String: Spool Slack Cable in Pit/Trench, 3 times (UW & MSU) 16
215 TE 16
216 1.2.9.6.4.5 String: Connect Cables to SJB #1 x 3 (UW) 112
217 SE 112
218 1.2.9.6.4.6 String: Survey & Backfill Cable Trenches, 3 times (ASC & UW) 48
219 SC 48
220 1.2.9.6.4.7 String: Excavate Surface Junction Box (SJB #2) Vaults (hole side) (ASC & UW) 8
221 SC 8
222 1.2.9.6.4.8 String: Remove SJB #2 Vault Lid & Walls (ASC) 16
223 SC 16
224 1.2.9.6.4.9 String: Trench from Holes to SJB #2 Pit, 4 times (ASC)
225 SC
226 Grand Total 1248 6002 5388 80