|
A |
B |
C |
D |
E |
F |
G |
H |
1 |
|
|
|
|
|
|
|
|
2 |
Cargo Item respective WBS Level |
Work Package |
Item Description |
Date of expected or actual completion |
Date of expected or actual shipment |
Float from article completion to transportation leg to MCM |
Date/Month for Items needed at South Pole (based on assumed 7 year schedule) |
Time from shipment to 'Needed at the South Pole' date (based on assumed 7 year schedule) |
3 |
1.2 |
Drill |
Gen 1 - housed in 20' container |
2/6/2020 |
Delivery to MCM complete |
Delivery to MCM complete |
12/1/2023 |
Shipping in process (Items awaiting last leg of shipment MCM-NPX) |
4 |
1.2 |
Drill |
Gen 2 - housed in 20' container |
1/15/2020 |
|
|
1/1/2023 |
|
5 |
1.2 |
Drill |
Gen 3 - housed in 20' container |
1/15/2020 |
|
|
12/1/2022 |
|
6 |
1.2 |
Drill |
287 Loader |
10/15/2019 |
|
|
12/1/2022 |
|
7 |
1.2 |
Drill |
Gen hoods Discharge Hoods - currently staged in McMurdo |
12/15/2019 |
|
|
1/1/2024 |
|
8 |
1.2 |
Drill |
Firn Drill |
1/15/2020 |
|
|
12/1/2023 |
|
9 |
1.2 |
Drill |
Firn Drill Components - 1 |
1/15/2020 |
|
|
12/1/2023 |
|
10 |
1.2 |
Drill |
Firn Drill Components - 2 |
1/15/2020 |
|
|
12/1/2023 |
|
11 |
1.2 |
Drill |
Weight stack and crates |
1/15/2020 |
|
|
12/15/2023 |
|
12 |
1.2 |
Drill |
Fuel Tower |
1/15/2020 |
|
|
1/1/2023 |
|
13 |
1.2 |
Drill |
HPU 1 |
1/15/2020 |
|
|
1/1/2024 |
|
14 |
Pt. Hueneme: |
|
|
|
|
|
|
|
15 |
1.2 |
Drill |
Container Ski Stack (comprised of 5 sleds) - currently staged
in Pt. Hueneme |
12/28/2020 |
1/15/2021 |
18 |
12/15/2022 |
699 |
16 |
1.2 |
Drill |
Generator Intake Hood - currently staged in Pt. Hueneme |
10/8/2020 |
11/24/2020 |
47 |
1/1/2024 |
1133 |
17 |
1.2 |
Drill |
Generator Discharge Hoods - currently staged in Pt. Hueneme |
10/8/2020 |
11/24/2020 |
47 |
1/1/2024 |
1133 |
18 |
1.2 |
Drill |
Drill Hose - currently staged in Pt. Hueneme |
7/29/2020 |
8/15/2020 |
17 |
1/1/2024 |
1234 |
19 |
1.2 |
Drill |
Drill Hose - currently staged in Pt. Hueneme |
11/19/2020 |
1/15/2021 |
57 |
1/1/2024 |
1081 |
20 |
U. Wisconsin: |
|
|
|
|
|
|
|
21 |
1.2 |
Drill |
8' Refit Container |
11/2/2021 |
11/15/2021 |
13 |
11/15/2022 |
365 |
22 |
1.2 |
Drill |
20' Refit Container A |
11/13/2021 |
11/15/2021 |
2 |
12/1/2022 |
381 |
23 |
1.2 |
Drill |
20' Refit Container B |
11/2/2021 |
11/15/2021 |
13 |
12/15/2022 |
395 |
24 |
1.2 |
Drill |
ARA Trailer |
11/2/2021 |
11/15/2021 |
13 |
12/15/2022 |
395 |
25 |
1.2 |
Drill |
Return Water Cable Reel (RWCR) |
10/26/2021 |
11/15/2021 |
20 |
1/1/2023 |
412 |
26 |
1.2 |
Drill |
Main Cable Reel (MCR) |
11/8/2021 |
11/15/2021 |
7 |
1/1/2023 |
412 |
27 |
1.2 |
Drill |
Controls infrastructure - Motor drives, PLCs, electrical hardware,
and motor drive mounting kits |
4/15/2021 |
5/1/2022 |
381 |
12/1/2022 |
214 |
28 |
1.4 |
Installation |
ICL power and timing electronics |
7/1/2023 |
8/1/2023 |
31 |
12/1/2023 |
122 |
29 |
1.4 |
Installation |
ICL patch cables and patch panels |
6/1/2023 |
8/1/2023 |
61 |
12/1/2023 |
122 |
30 |
1.2 |
Drill |
ARA Drill System Components - Crate 1 |
4/15/2021 |
5/1/2022 |
381 |
12/1/2022 |
214 |
31 |
1.2 |
Drill |
ARA Drill System Components - Crate 2 |
4/15/2021 |
5/1/2022 |
381 |
12/1/2022 |
214 |
32 |
1.2 |
Drill |
Camp Hose - currently staged at PSL |
6/11/2021 |
11/15/2021 |
157 |
12/1/2023 |
746 |
33 |
1.2 |
Drill |
Bull wheel |
12/1/2021 |
11/15/2022 |
349 |
2/1/2024 |
443 |
34 |
1.2 |
Drill |
Load member cable reel |
10/15/2022 |
11/15/2022 |
31 |
12/15/2023 |
395 |
35 |
1.2 |
Installation |
DOM Handling Facility (DHF) |
7/21/2022 |
11/15/2022 |
117 |
12/1/2023 |
381 |
36 |
1.2 |
Drill |
Spare Combo cable |
10/15/2022 |
11/15/2022 |
31 |
2/12/2024 |
454 |
37 |
1.2 |
Drill |
Spare Drill Cable |
10/15/2022 |
11/15/2022 |
31 |
2/12/2024 |
454 |
38 |
1.2 |
Drill |
Computing/controls components |
7/1/2023 |
8/1/2023 |
31 |
11/15/2023 |
106 |
39 |
1.2 |
Drill |
Driller resupply/refit components - 8' Container |
7/1/2023 |
8/1/2023 |
31 |
11/15/2023 |
106 |
40 |
1.2 |
Drill |
Drill refit components |
7/1/2023 |
8/1/2023 |
31 |
11/15/2023 |
106 |
41 |
1.2 |
Drill |
Drill Heads DNF - X |
9/1/2021 |
11/15/2022 |
440 |
2/12/2023 |
89 |
42 |
1.2 |
Drill |
Drill Heads DNF - Y |
9/1/2021 |
11/15/2023 |
805 |
2/12/2024 |
89 |
43 |
1.2 |
Drill |
Drill Heads DNF - R |
9/1/2021 |
11/15/2023 |
805 |
2/12/2024 |
89 |
44 |
1.2 |
Drill |
Computing/controls components |
7/1/2024 |
8/1/2024 |
31 |
11/15/2024 |
106 |
45 |
1.2 |
Installation |
Installation Hardware 87-93 |
7/15/2023 |
11/15/2023 |
123 |
2/15/2024 |
92 |
46 |
1.2 |
Installation |
Installation Weights 87-93 |
7/15/2023 |
11/15/2023 |
123 |
2/15/2024 |
92 |
47 |
1.5 |
Installation |
Calibration/Special Devices 87-88 |
11/30/2022 |
8/1/2023 |
244 |
12/15/2023 |
136 |
48 |
1.3 |
Installation |
Special Devices 87-88 |
1/1/2023 |
8/1/2023 |
212 |
12/15/2023 |
136 |
49 |
1.2 |
Installation |
Misc. Science Equipment - FY24 |
6/1/2023 |
8/1/2023 |
61 |
12/1/2023 |
122 |
50 |
1.3 |
Installation |
Special Devices 89-93 |
1/1/2024 |
8/1/2024 |
213 |
11/25/2024 |
116 |